Metro Reports: 15 story tower proposed at 514 SE Belmont, permit issued for Hawthorne 31, and more

11th_ankeny_preapp_img_01

11th & Ankeny apartments

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Urban Development Group have requested Design Advice for their project at 11th & Ankeny:

Design Advice Request for a new mixed-use building – 2191 sq ft retail; 84 residential units; 6081 sq ft of below ground parking (23 parking spaces total).

Early Assistance has been requested for a project at 7246 N Mohawk Ave:

17-18 unit multi family building with on-site storm handling. Transfer of density from neighboring site at 7922 N Ivanhoe. One house to remain on 7922 N Ivanhoe.

A Pre-Application Conference has been scheduled by Vallaster Corl Architects to discuss a project at 514 SE Belmont St:

Pre-App. Conference to discuss a Type III Historic Resource Review for a new 15-story mixed-use building with ground level retail, parking (approx. 90 spaces) on the 2nd and 3rd floors and 193 residential units on the upper floors.

A Pre-Permit Zoning Plan Check has been requested for a building at 3423 SE Hawthorne Blvd:

New four story 24 unit apartment building

Holst Architecture have submitted 510 NW 15th Ave for Design Review:

Renovation of 2 existing buildings to include seismic upgrades, 4 levels on the west building for creative office space

A demolition permit was issued to Works Partnership, which will enable a townhome development at 5711 E Burnside St to move ahead:

Demolish existing one story commercial building, 896 sf, requirement of final plat permit 15-108229FP, remove all debris

A pair of building permits were issued to FFA Architecture for the Tess O’ Brien apartments:

6 story 5/1, 74 apts

6 story 5/1, 52 apts

A building permit was issued for an apartment building at 4937 SE Division St by SERA Architects:

New 134 unit apartment building with retail at ground level and tuck under parking.

A building permit was issued to TVA Architects for the Hawthorne 31 Apartments at 1515 SE 31st Ave:

New 4-story mixed use building with ground floor retail and 30 apartment units in floors 2-4.

A building permit was issued for a new building at 6030 SE 52nd Ave:

New 2 story commercial building; shell only; with associated site work. No occupancy under this permit, separate ti permits required for occupancy. Sprinkler/alarm required.

Metro Reports: 1400 NW Raleigh, 811 Stark, Q21 and more

Q21 by YBA Architects

Q21 by YBA Architects

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

 

Hennebery Eddy Architects have requested Early Assistance for a renovation of a warehouse at 2215 NW Quimby St:

Improvement to existing building to include TI, seismic upgrades, exterior entry & storefront upgrades and non-conforming site upgrades

Early Assistance has been requested for a project at 7116 SE 16th Ave:

Small mixed use building with retail, private parking on grd floor for the owner. Apartments on second and third floors and owner’s residence on top floor.

Merryman Barnes Architects and Encore Architects have scheduled a Pre-Application Conference to discuss a proposed building at 1400 NW Raleigh:

Pre-Application Conference to discuss a Type III Design Review for a 6-story, 146-unit residential project with a small ground-level retail space, 93 parking spaces and 231 bike parking spaces.

Allusa Architecture have applied for a building permit for a project at 1932 SE Madison St:

Construct new 2 story 4 plex; site work to include new flow thru planter, short term bicycle, new walk ways, new detached trash enclosure 72sf

CIDA Architects have applied for a building permit for a project at 5624 SE 22nd Ave:

Construct new 3 story 15 unit apartment building; 5 units on each fl; with associated site work; detached bike enclosure and trash enclosure

Potestio Studio have applied for a building permit for a project at 8417 SW 24th Ave:

New 4 story 15 unit apartment building

Works Partnership have applied for a building permit for 811 Stark, which was recently approved by the Design Commission:

New 31,500 sf mixed-use building with retail space on the first floor, and an expected mix of creative office uses on the upper floors. Work includes 3-stories of wood glulam post and beam construction over a 1-story concrete podium, with ground floor retail, parking, lobby and building services

A building permit was issued to YBA Architects for the partial demolition of a warehouse, which will incorporated into their Q21 project:

Partial Demo building, removing foundation, keeping some walls of existing structure

 

Metro Reports: Dharma Rain Zen Center, Mason Erhman Building Annex, Greeley & Killingsworth and more

Dharma Rain Zen Center meditation hall

Dharma Rain Zen Center meditation hall

Every week, the Bureau of Development services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

SERA Architects have applied for a Type III Historic Resource Review for renovation to the Mason Erhman Building Annex:

The Mason Ehrman Building Annex – Core & Shell Renovation Of Existing 2 Story Warehouse Building . 2 Modifications To Exterior Openings & Window Sill Height

Schemata Workshop have applied for building permits for 8 new buildings for the Dharma Rain Zen Center at 8500 NE Siskiyou St:

Construct 2 story, 6 unit apartment building, site work included

Construct 2 story, 5 unit apartment building, site work included

Construct 2 story, 5 unit apartment building, site work included

Construct 2 story, 5 unit apartment building, site work included

Construct 2 story, 5 unit apartment building, site work included

Construct 2 story, 5 unit apartment building, site work included

Construct single story common house, includes kitchen and dining area, sitting room, craft room, 2 guest rooms, laundry area, 3 restrooms and storage

Construct 5 bay garage structure with attached covered trash enclosure at east elevation, new parking lot with stormwater facilities and accessible parking

A building permit application has been received for a project at 4227 N Massachusetts Ave:

New construction of three level, 12 unit apartment complex; no onsite parking

A building permit application has been received for a project at 1324 SE Oak St by Otak Architects:

New 4 story wood frame apartment building with underground parking; basement parking to include new bike storage and trash enclosure;

Building permits have been issued to Works Partnership for their Greeley & Killingsworth project:

Bldg 1 of 2 – new 11 unit 3 story apartment bldg with mixed use on street level

Bldg 2 of 2 – new 15 unit 3 story apartment bldg with courtyard

Metro Reports: Roosevelt High School, Zidell Yards food carts, Concordia Student Housing and more

roosevelt_high__Page_10

Roosevelt High School Modernization

Every week, the Bureau of Development services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Emerick Architects has scheduled a Pre-Application Conference and requested Design Advice for a new building to replace the Gypsy Restaurant at 635 NW 21st Ave:

Removal of existing one-story restaurant/bar. Construction of mixed-use building with underground parking.

Design Advice has been requested for 10506 E Burnside:

5 story 50 + unit apartment complex EA15-118947 PC

ZGF Architects has scheduled a Pre-Application Conference and requested Design Advice for the Canopy by Hilton at 431 NW 9th Ave in the Pearl:

Project is for a 10 story approx. 150 room full service hotel plus one level of banquet and support services below grade

Early assistance has been requested for a project at 4455 SE 52nd Ave by Rainier Pacific Development:

Construct a new 4-story 63 unit courtyard style apartment building with ground floor retail/commercial stormwater to be disposed on site with drywells.

Early Assistance has been requested for a project at 1024 NW 19TH Ave:

Narrow 6-story building. 21 units averaging 600 sq ft. No on-site parking or basement area is provided inthe proposed design. Flat low slope roof with contemporary glass faceace [sic].

Early Assistance has been requested for a project at 3131 SW 11TH Ave:

18 townhome-style (3-story) apartments with 2-car garages.

ZRZ Realty has requested Early Assistance for food carts on the Zidell Yards:

EA for DZ (food carts in right-of-way or private property depending on stage in street vacation)

A Pre-Application Conference has been scheduled to discuss a new building in South Waterfront on land owned by The Landing at Macadam LLC:

6-story mixed use building consisting of approx 3500 sf of retail, 200 market rate apartments and 187 off-street parking stalls in one level of structured underground parking

Waterleaf Architecture has scheduled a Pre-Application Conference to discuss further work in the ongoing Lloyd Center Remodel:

Renovation of existing 3 story 150,000 sq ft store for multi tenant use

SERA Architects have applied for a Design Review for the NW Portland Hostel expansion:

Project for a 16,786 SF five story hostel development. Ground floor public spaces include lobby, reception area and small office, cafe and assoc. kitchen. A dining area to be used by guests and an associated kitchen to be used by guests are also included.

Works Partnership has applied for a building permit for the Concordia Student Housing at 1616 NE Killingsworth St:

New 4 story mixed use building with ground floor retail and apartments on floors 2-4.

Bassetti Architects has applied for a series of building permits for the Roosevelt High School Modernization:

Grading, Foundation and Utilities for new additions to existing building, selective demolition work to auditorium, commons and classrooms

Demolition of existing gymnasium building, building is attached to main school structure

Demolition of northern end of existing Library/Classroom building (removal of Band/Choir rooms), section to be demolished is attached to main building

 

MODS Willamette (images)

A building permit is under review for MODS Willamette, a two story residential building at 8332 N Willamette Blvd in the Cathedral Park neighborhood. The project by Works Partnership will utilize pre-fabricated modules, arranged to create six residential units, of one or two bedrooms each. Proposed exterior materials include board-formed concrete, vertically-oriented cedar tongue-and-groove siding, two shades of Swiss Pearl cement composite panels, and fiberglass windows. Vertically-oriented wood slat screens are used to create enclosed porches at the ground and second floors. Steel planters are proposed in the required 3′ side setback, and will be planted with native grasses and sedges.

No off street car parking is proposed. A bicycle storage area will be provided in the basement.

MODS_Willamette_img_01

Read More

Metro Reports: Conway Offices, Concordia Student Housing, Crawford & Charleston apartments and more

The Ballou & Wright building in 1986. The building is listed on the National Register of Historic Places.

The Ballou & Wright building in 1986. The building is listed on the National Register of Historic Places.

Every week, the Bureau of Development services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Lever Architecture have requested Design Advice for the renovation of the Ballou & Wright Building at 1010 NW Flanders St:

Renovation of existing 5-story historical building with basement: new roofhouse penthouse, new interior communicating stairway from basement to roof, removal and replacement of restrooms at each floor, and structural upgrades.

GBD Architects have requested early assistance for two buildings at 3121 SW Moody Ave on the Zidell Yards in South Waterfront:

Two new office buildings. Site is a brownfield and improvements involve the construction of new roads and utilities.

Works Partnership have requested early assistance for Urban Development Partners’ Concordia Student Housing at 1616 NE Killingsworth:

New 4 story mixed use building ground floor residential upper floors residential.

Stack Architecture at have requested early assistance for a project at N Crawford & N Charleston Ave:

Four-over-one apartment building with 1 level of parking on undeveloped lot.

SERA Architects have scheduled a pre-application conference to discuss the renovation of the Conway Leland James Center at 1621 NW 21st Ave:

Pre-application conference for Type III Design Review to renovate the Conway Leland James Center bldg into creative office space. This project will entail significant exterior alterations. The building will contain 85 parking spaces in the basement, ground floor retail and office and office space in the 2-4 floors.

Tahran Architecture & Planning have scheduled a pre-application conference to discuss a new building at 10506 E Burnside St:

5-story wood framed apartment building containing approx 40 dwelling units and 21 surface parking spaces.

Opsis Architecture have scheduled a pre-application conference to discuss The Redd, the upcoming project by the Ecotrust:

Renovate existing industrial building, including the addition of a new 8,500 sq ft 2nd floor.

Scotia Western States Housing have applied for a Design Review for the Market Hill Condominiums:

Proposed residential condominium building contains 16 dwelling units. Structure will face SW Market St and SW 20th Ave. Proposal includes underground parking this is accessed via SW 20th ave.

SERA Architects have applied for a Design Review for the Modera Belmont:

6 story – 204 unit market rate apartment building with ground floor retail and one level of below grade parking. 3 modifications total.

Works Partnership have applied for a Design Review for 811 Stark:

Mixed use building with retail space on the first floor and an expected mix of creative office uses on the upper floors.

Metro Reports: Grove Hotel, Zidell Yards, Conway Block 294 and more

Surround Architecture's Grove Hotel remodel and expansion

Surround Architecture’s remodel and expansion of the Grove Hotel

Every week, the Bureau of Development services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

GBD Architects have requested for Design Advice for Conway Blocks 294 and 295:

2 mixed use buildings over a continuous (2) level underground parking structure

Surround Architecture have requested for Design Advice for their remodel and expansion of the Grove Hotel:

Renovation of existing 3 story building & construction of new 9 story mixed use building

ZGF Architects and ZRZ Realty have requested Early Assistance for a project at 3201 SW Moody Ave in the Zidell Yards:

Mixed-use building with 6-7 floors of apartments over a podium and ground floor retail, over 2 levels of underground parking.

Koz Development have requested a Pre-Application Conference for a project at 2211 SW 4th Ave:

Pre-Application Conference to discuss Type III Design Review for new 110-unit apartment building over surface level parking deck. The building will provide “micro-studio student housing”.

A separate Type III Historic Resource Review is still pending for a project at 1810 NE 11th Ave, however BKL/A Architecture have applied for a building permit:

Construct 3 story, 12 unit apartment building, no onsite parking, flowthrough planters at landscaped area and associated site improvements

Works Partnership have applied for a building permit for the MODS Willamette project at 8332 N Willamette Blvd:

Construct new 2 story, 6 unit modular apartment building, no parking, partial street improvement, scope of work includes basement, foundation, exterior cladding, porches at 1st and 2nd floor, parapets, roof assembly, associated site work such as stormwater facility, bike parking and landscaping, detached trash enclosure is 52sf; modular unit construction prior approval by state of Oregon permit #M638 14-5420c

A building permit was issued to Dustrud Architecture for the Boathouse Apartments at 0444 SW Boundary St:

6 story, 154,903 sf, 124 unit residential apartment building with parking at ground level. IIIB over IA construction.

Greeley & Killingsworth (images)

A development at N Greeley & Killingsworth by Works Partnership is currently under review for building permit. The project for Jacobsen Development Group consists of two 3-story buildings on an 11,1163 sq ft lot in the Overlook neighborhood. The building facing N Killingsworth will include 11 residential units and 1,680 sq of retail space at the ground floor. The building behind it will contain 15 residential units. No on site car parking is proposed. 29 long term and 2 short term bicycle parking spaces will be provided for the residential units, along with 2 long term and 2 short terms spaces for the retail spaces.

greeley_killingsworth_img_01

Read More

Burnside Bridgehead, pt I: Block 75 (images)

This post is the first in a series on the developments at the Burnside Bridgehead. See also Part II about Block 67.

Block 75 is one of a number of projects planned or under construction at the Burnside Bridgehead, a site which the Portland Development Commission has been trying to develop since 2005. A previous plan by developer Opus Northwest proposed a single large development on the multi-block site; the current plan has seen the PDC sell off the block individually, and let the developers choose what to build. For Block 75 partnership between Beam Development and Urban Development Partners was chosen. Beam are best known for their adaptive reuse office projects in the Central Eastside, while UDP have developed a number of apartment buildings along SE Division St. The architects for the project are Works Partnership, who have designed buildings for both developers. The landscape architects are Lango Hansen.

block_75_01

Read More