This post is an updated version of a post originally published on December 3rd 2014.
Construction is underway on 419 E Burnside, a 6 story mixed use building in the Central Eastside. The building will contain 157 residential apartment units, as well as two ground floor 2 live / work units. Continuous retail spaces will front onto E Burnside. 50 parking spaces will be provided for residents, as well as 12 parking spaces for the adjacent Central City Concern building, which will remain. Bike parking will be dispersed throughout the building. The design of the building is by Portland based Myhre Group Architects for Dallas based developer Trinsic Residential Group.