Weekly Roundup: Overlook Pointe fire, 10th & Yamhill Smart Park, Field Office, and more

10th & Yamhill Smart Park

Conceptual image of a renovated 10th & Yamhill Smart Park garage (image by FFA Architecture & Interiors)

The Portland Development Commission received three offers for Centennial Mills, according to The Oregonian. All three offers, valued at $1,000, $100,000 and $3.45 million, were rejected. The redevelopment agency will now consider “how/whether to reengage the market”.

The DJC reported that the under construction Overlook Pointe condominium development at 5425 N Minnesota Ave was burned down in a fire* early Wednesday morning.

The PDC voted to sell property at 1053–1201 NW Naito Parkway to The Wolff Company for $9 million. The Oregonian reported that the developer plans to build 340 apartments on the site, 68 of which would be affordable for at least 10 years.

KGW covered the 1,200 apartments coming to the area in and around the Con-way Masterplan area in NW Portland. Construction is underway on Blocks 294E and 295E and the Leland James Buildingwhich are following on from the LL Hawkins and Slabtown MarketplaceImmediately outside of the masterplan area is Q21, which is nearing completion.

The Portland Tribune wrote about the “new mood in Chinatown“, which after decades of divestment might be seeing a change in its fortunes. The Society Hotel opened last year, and will soon be joined by the newly renovated Mason Erhman Building Annex, Overland Warehouse Company Building and Grove Hotel.

The Portland Mercury profiled Swift Real Estate Partners, the San Francisco Investment Firm that is “Snatching Up Old Town Real Estate“. The company’s acquisitions include the New Market Theatera historic building adjacent to the Skidmore Fountain that could receive a significant addition.

Project^’s Field Office will create a “300,000-square-foot urban campus“, according to the Portland Business Journal. Construction recently started on the Hacker-designed buildings at NW Front and 17th.

More than 1,000 people applied for the 65 housing units available to people displaced from North and Northeast Portland, according to The Oregonian.

The City is planning a $25 million renovation of the 10th & Yamhill Smart Park, according to the Portland Business Journal. The scope of the project will include addressing seismic and ADA deficiencies in the existing structure.

Three new surf shops are set to open in the next year, reports The Oregonian. These include Cosube, which will open in Slate at the Burnside Bridgehead, and Leeward Northwest Surf & Sea, which will open in New New Crusher Court at 2450 NE Sandy Blvd.

According to the Portland Business Journal, furniture retailer Room & Board will open next year in the Pearl District’s newly renovated Fisk Tire Company Building.

The Business Tribune wrote about a day in the life of the team at OHSU working on the Knight Cancer Research Building.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: 419 SW Washington, Field Office, Grand Belmont, and more

Grand Belmont

Grand Belmont, as presented to the Landmarks Commission for Design Advice earlier this year

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

GBD Architects have requested Design Advice for 108 SW 3rd Ave:

Design Advice Request for a new 6-story mixed-use building with approx. 8,925 SF of retail, 133 market-rate apartments and 63 off-street parking stalls on one level of structured underground parking.

C2K Architecture have requested Early Assistance for a project at 3434 NE Sandy Blvd:

Renovation of existing building to include retail and commercial uses along Sandy Boulevard and development mechanic’s shop into commercial bakery. Existing parking to be converted to public amenity space.

Early Assistance has been requested for a project at 10737 NE Fremont St:

Develop the parcels into condos. The house on the west parcel will be demo’d. The house on the east parcel will remain.

BAMA Architecture and Design have requested Early Assistance for a project at 15536 NE Glisan St:

Multi-phase, multi-family development on multiple lots. Looking at possibly consolidating lots to help minimize interior setback requirements. They are hoping to meet community design standards.

Early Assistance has been requested for a project at 12335 SE Division St:

Get space self-storage facility with associated parking, utilities, and landscaping.

LRS Architects have requested Early Assistance for a project at 2310 SE Hawthorne Blvd:

New 4 story mixed-use building including 61 living units over retail and 23 parking stalls.

ZGF Architects have scheduled a Pre-Application Conference to discuss a project at 419 SW Washington St

Pre-application conference to discuss a Type III Design Review for a new 30-story, mixed-use tower.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 306 SE 8th Ave:

Demo existing building, new development of 6 story 100 residential apartment building with ground floor retail and underground parking.

Waterleaf Architecture have scheduled a Pre-Application Conference to discuss a project at the Lloyd West Anchor:

Renovation of existing 3-story, 150k SF anchor into multi-tenant use.

A Pre-Permit Zoning Plan check has been requested for a project at 20 NE 14th Ave:

6 story multi-family apartment building with parking for 132 vehicles

Vallaster Corl Architects have submitted Grand Belmont for Type III Historic Resource Review:

22-story high-rise residential project- of approx 212,000 SF above grade.

Holst Architecture have submitted 1510 NE Multnomah for building permit review:

New mixed use, multi family apartment building over parking and retail space

Bldg 2 – New Mixed Use Multi Family building with apartments over parking and retail space

A multiple building project at 6702 SE 72nd Ave has been submitted for building permit review:

New construction of 3 story triplex

New construction of 3 story, 6 unit apartment building with site improvements

New construction of 3 story, 6 unit apartment building with site improvements

A multiple building project at 7513 N Olin Ave has been submitted for building permit review:

New construction of one of two 3 story 6 unit apartment buildings

New construction of two of two 3 story 6 unit apartment buildings

The WorldMark by Wyndham at 221 SW Naito has been submitted for building permit review by SERA Architects:

New 75 unit, 6 story vacation ownership. 5 over 1 construction

The MLK.Mason West apartments at 4119 NE M L King Blvd have been submitted for building permit review:

New 6 story apartment building with 112 units and tuck under parking.

A project at 24 NE 60th Ave has been submitted for building permit review:

Construct new 4 story 14 unit apartment building with parking on main fl and associated site work

The George Besaw Apartments at 2301 NW Savier St have been submitted for building permit review by GBD Architects:

New construction of new mixed use 4 story apartment building containing 51 residential units, with retail and services on the ground floor

A second building at the Garlington Center has been submitted for building permit review by Scott Edwards Architecture:

Construct new 2 story building for new clinic associated site work

The Home2 Suites by Hilton @ Portland Airport has been submitted for building permit review by JRA Architecture & Planning:

Construct new 4 story 99 rooms hotel with indoor pool and exercise room; associated site work and new parking

A foundation permit was issued to Hacker Architects for the Field Office:

The Partial Permit scope of work includes: a) erosion control; b) ground improvements; c) shoring d) tiebacks; e) excavation and earth work; f) deep foundations; g) foundations; h) basement-level mat; i) basement walls and j) at-grade post tension slabs. Also includes all mechanical, plumbing and electirical installation up to level 1 slab. Separate MEP permits required for this work.

Metro Reports: Station Place Lot 5, 72Foster, 1500 SW Taylor, and more

Station Place Lot 5

A building permit was issued for Station Place Lot 5 by Hacker architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

SERA Architects have requested Design Advice for a project at 1500 SW Taylor St:

Design Advice Request for a Type III Design Review for the construction of a new 10-story mixed-use building with some ground-level retail and residential development, approximately 150 residential units. The project will include two-levels of below-grade parking. See parent folder (PC 16-175812).

Early Assistance has been requested by William Wilson Architects for a project at 310 SE 12th Ave:

Proposal is for new four-story 84 unit apartment building with basement.

Early Assistance has been requested by Ankrom Moisan Architects for the N Williams Center at 2156 N Williams Ave:

Demo existing buildings and develop a new 4 story 61 unit apartment building with 30 parking spaces

Early Assistance has been requested by Wright Architecture for a project at 6804 N Maryland Ave:

New 3 Story 6 unit development with property to be divided; Questions regarding feasibility.

Early Assistance has been requested by TVA Architects for a project at 1120 NW 21st Ave:

Proposal is for a new four-story 45ft tall mixed-use/multi family residential development including 46 apartments, ground floor leaseable space, ROW and site improvements, landscaping and 51 long term and 3 short term bike parking stalls. On on-site parking provided.

Early Assistance has been requested by Holst Architecture for 72Foster at 7120 SE Foster Rd:

Project consists of new 80,000 sf four story building that will include 108 affordable housing units with approx. 10,000 sf of ground floor retail space and approx. 54 parking spaces.

Early Assistance has been requested by TVA Architects for a project at 3802 NE Martin Luther King Jr Blvd :

Early Assistance with meeting to discuss proposal for a new (5-story, 57′ tall) multi-family residential development.

Early Assistance has been requested by Merryman Barnes Architects for the King Parks apartments at 6445 NE Martin Luther King Jr Blvd:

New development of a 69 unit affordable housing project with community room, orrices and service spaces on the ground floor with 24 parking spaces accessed off the alley.

Early Assistance has been requested by TVA Architects for a project at 5036 NE Sandy Blvd:

New 6 story market rate mixed-use/multi-family development. 90 units proposed with 1 floor mixed use retail, 21 car parking spaces and 139 bike parking spaces.

Early Assistance has been requested by Gerald Rembowski Architect for a project at 1125 N Schmeer Rd:

Two lot land division in order to be able to build second hotel with 76 rooms on the proposed eastern lot.

A Pre-Application Conference has been scheduled by LRS Architects and Lever Architecture for Block 45:

A Pre-Application Conference to discuss a proposal for a new twelve story building. The building is proposed to have 7,500 square feet of ground floor retail and approximately 264 residential units. Project is a mix of affordable and market rate housing. No parking is proposed.

LRS Architects have submitted NW 14th & Raleigh for Design Review:

New construction of a twelve story building with 93 units of affordable housing, associated resident amenities and a ground floor commercial space on a 10,000 sf site. Parking for 16 cars will be provided on the ground floor.

GBD Architects have submitted revisions to Oregon Square for Design Review:

Type III Design Review for a 4-block phased development. Changes to LU 15-156716 are being proposed. Phase 1 is the superblock be developed into two apartment towers around a publicly accessed ped-only plaza.

Works Partnership have applied for demolition permit and building permit for a project at 110 SE Washington St:

Demo existing 2 story warehouse

Construct new 9 story building with underground parking;

Urban Development Group have applied for a building permit for a project at 316 NE 28th Ave:

Construct new, 4 story apartment building with 74 units, below grade parking

Building permits are under review for a project at 6400 SW Canyon Ct:

Building 1 – 76 units, 4 stories of living over 2 stories of below grade parking

Building 2 – 72 units, 4 stories of living over 2 stories of structured parking

Building 3 – 59 units, 3 stories over 1 story of structured parking

Building 4 – 60 units, 3 stories of living over 1 floor of structural parking

Stack Architecture have submitted a project at N Crawford & N Charleston Ave for building permit review:

New construction apartment bldg on north side of property – see 16-185213-CO for attached plaza and apartment bldg C

New construction 4 over 1 apartment building with parking garage and plaza -see 16-185235-CO for bldgs A&B

Iselin Architects have submitted a project at 8705 SE 13th Ave for building permit review:

New 5 story 24 unit apartment building with underground parking

Bora Architects have applied for a foundation permit for Block 20:

Block 20 – Foundation permit for 21 story condo tower – This permit includes piles, pile caps, below grade utilities and slab on grade.

Building permit is under review for a project at 223 SE 146th Ave:

Construct 3 story, 3 unit apartment building

Construct 3 story, 24 unit apartment building

Construct 3 story, 24 unit apartment building, includes parking and associated site work, detached trash enclosure is less than 120ft in area

Ankrom Moisan Architects have submitted the East Burnside Apartments at 10506 E Burnside for building permit review:

New construction of five story multidwelling residential building, consisting of 52 unit with 15 tuck-under parking spaces. Interior trash room

Myhre Group Architects have submitted a project at 5025 NE 21st Ave for building permit review:

Construct new 4 story, 28 unit apartment building, no parking, includes associated site work

Urban Development Group have submitted a project at 4926 SE Division St for building permit review:

New construction of a mixeduse building consisting of 127 apartment units and 7000 sf of ground floor commercial space; below grade parking

Myhre Group Architects have submitted a project at 4901 SE Hawthorne Blvd for building permit review:

Construct new 4 story mixed use building with (46) units and 2737 sf of retail, interior trash room

The Seven Corners Community Collaborative at 1949 SE Division St has been submitted for building permit review:

Construct new 4 story office building with retail and parking on ground floor, offices on floors 2-4, includes associated site work

Building permits are under review for a project at 5414 SE Duke St:

New 2-story building with 8 guest rooms

New 2-story building with 8 guest rooms

New 2-story building with 8 guest rooms

A building permit was issued to Scott Edwards Architecture for a project at 1451 NE Alberta St:

Redevelopment of existing building to create ground floor warm shell retail and two floors – 10 units – residential units above. Including street landscaping. Separate tenant improvement permit required for occupancy of 1st floor shell space.

A partial permit for excavation and piling at Station Place Lot 5 was issued to Hacker Architects:

Partial Permit for new 8 story building, scope includes erosion control/site preparation, excavation/piling, underground utilities, entire concrete structure.

An excavation and shoring was issued to GBD Architects for the Broadway Tower:

Excavation and Shoring for new 19 story commercial high rise structure with retail, office and hotel uses and 4 floors of below grade parking

A building permit was issued for a project at 2845 NE Columbia Blvd:

Construct new 103,912 sq ft, 3 story self storage building with associated utilities, parking and landscaping.

Focus: Portland’s Tallest Planned Buildings (2016)

Image from the Discussion Draft of the Central City 2035 Plan (Bureau of Planning & Sustainability).

Image from the Discussion Draft of the Central City 2035 Plan, showing a possible development scenario approximating future growth in the Pearl District over 20 years (Bureau of Planning & Sustainability). At least two of the sites shown as potentially developable have current proposals on them.

It is just over a year since Next Portland last did a roundup of the tallest buildings planned or under construction in Portland. At that time, we counted 25 buildings over 100′ in height planned. Today we count 40. Given the length of time it takes to complete a high rise building, many of the buildings on the 2016 were also on the 2015 list. Four buildings are no longer on the list this year, due to having been completed: Block 17, Pearl West, the Aster Tower and Park Avenue West. Seven buildings that were still in the design phase last year are now under construction. No building on last year’s list is known to have been cancelled.

Read on to see our complete list. Where possible, the heights given are the building height as defined in the Portland Zoning Code and published in the Design Commission’s Final Findings. In some cases the heights have been estimated.

Read More

Metro Reports: Grove Hotel, 9101 SE Foster, 5166 SE Division and more

Grove Hotel

A partial demolition permit was issued for the Grove Hotel. The annex on SW 4th Ave will be demolished. The main building facing W Burnside will be rehabilitated.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

BAMA Architecture and Design have requested Early Assistance for a project at 15847 SE Powell Blvd: 

Proposal is for construction of new 19 bed residential care facility for persons with physical or mental disability. Odot owns frontage and must attend ea meeting. Existing residence will be demolished.

Mackenzie have submitted a project at 2800 NW Front Ave for Conditional Use Review:

Conditional use review for acessory office over 25,000, SF as required for Guilds Lake Industrial Sanctuary Plan District. Adjustment for reduction of parking lot interior trees.

A partial demolition permit was issued for the Grove Hotel:

partial – interior non-structural demolition of south SRO portion of the building and demolition to grade of the north one-story portion of the building.

Hacker Architects have submitted 9101 SE Foster Rd for building permit review:

4 story mixed use development with ground floor retail and 3 floors of apartments

Architecture Building Culture have submitted a project at N Interstate and Jarrett St for building permit review:

Build a new three story 12 unit apartment/condo building constructed of fifteen prefabricated modules set and finished on site. *electrical, mechanical, and plumbing permits to be obtained separately*

A building permit was issued for a project at 5166 SE Division St: 

Construct 3 story 14 unit apartment building; with underground parking and associated site work

A building permit was issued to YBA Architects for a project at 1208 SE Ankeny St:

Construct new 4 story with basement, 27 unit apartment building; with associated site work

A building permit was issued for a project at 4304 SW Hillsdale Ct:

Construct new 3 story building with basement; new landscaping and associated site work;

Weekly Roundup: Framework, Park Avenue West, Block 75 Phase II and more

The 12 story Framework building by Lever Architecture, planned for a site as NW 11th & Glisan in the Pearl

The 12 story Framework building by Lever Architecture, planned for a site at NW 10th & Glisan in the Pearl

In an article titled “Wooden Buildings as Strong as Steel” Newsweek wrote about how Portland is leading the nation in the adoption of Cross-Laminated Timber (CLT). The article includes quotes from Ben Kaiser of PATH, architect and developer of Carbon12and Thomas Robinson of Lever who is the architect for Framework in the Pearl and Albina Yard.

An article and photo gallery in the Portland Business Journal showed how CLT is made. Riddle-based D.R. Johnson Lumber Co is currently the only domestic lumber mill certified as capable of producing the wood panels.

The Portland Business Journal covered Block 75 Phase IIthe next high-rise building planned for the Burnside Bridgehead. The Works Partnership designed building is the latest partnership between Beam Development and Urban Development + Partners.

The Oregonian noted that a Travel Portland found that hotel prices have soared since 2010. The rising rates have led to a hotel construction boom, as Next Portland covered last year.

Construction is underway on the expansion of the SERA designed NW Portland International HostelIn a story about the project KGW wrote that the hostel is trying “to keep up with the booming tourism in the Rose City”.

The Portland City Council approved a realignment to the route of the proposed extension of SW Bond between the Tilikum Crossing and SW River Parkway. The extension, which will begin construction this year, allows OHSU projects including the Knight Cancer Research Building to move head.

The first residential tenants are moving into Park Avenue Westreported the Portland Business Journal. The TVA Architects designed building is now the fourth tallest building in Portland.

The Portland Development Commission is increasing its contribution to projects in Lents by $6.3 million, according to the Portland Business Journal. The projects include the Asian Health and Services Center by Holst Architecture, Oliver Station by Ankrom Moisan Architects and 9101 SE Foster Rd by Hacker Architects. The developers behind Oliver Station have gained control of the Chevron station at SE 92nd and Foster, enabling the project to occupy the full block.

Commissioner Steve Novick wrote about an idea that is rapidly gaining traction as a way to bring affordability back to Portland’s neighborhoods. “Missing middle housing” is new term for old styles of development, currently prohibited in most of Portland, at a density between that of single family detached houses and large mid-rise apartment buildings. These include housing types such as rowhomes, courtyard apartments, triplexes, built to the same height and scale as single-family homes.

A post at Portland Shoupistas asked if the PDC’s $26 million garage at the Convention Center Hotel  will be a money maker or a money loser. Though planned as  revenue generator, the post points out that “just to break even, this garage will need to generate more than $12 per space every day of every year for 20 years, starting in 2020.”

KOIN reported that “Ivy Island may not be ‘gateway’ to St. Johns for long“. A street vacation in the St Johns neighborhood was approved this week. The vacation will allow the mixed use Union at St Johns building by Jones Architecture to move ahead, while creating a safer road layout.

 

Weekly Roundup: 21 Astor, Convention Center parking garage, Providore Fine Foods and more

The proposed garage at the Convention Center Hotel

The proposed garage at the Convention Center Hotel

The Portland Business Journal reported that the board of the Portland Development Commission approved a resolution to build a $26 million garage adjacent to Convention Center HotelThe 425-stall parking garage will include 375 stalls dedicated to the hotel. The majority of the remaining stalls will be used by Trimet.

The City is looking for feedback on the Central City 2035 plan, according to the Portland Business Journal. The new plan will rewrite the zoning code for Downtown, the Pearl, the Lloyd District and other areas of Portland’s Central Business District, and was released for public comment this week. Public displays will happen at the Development Services Center from February 22nd to 26th and at the Olympic Mills Building from February 29th to March 4th.

An opinion piece by three employees of ECONorthwest, a regional economic consulting firm, asked if Oregonians really want housing that’s affordable. The authors argued that the first order of business should be to bring the supply of housing into line with demand, and that there are three options to achieve this: build out, build up, or do both.

History Treasured & Sometimes Endangered wrote about the pros and cons of the vacation of a piece of right-of-way in St Johns known as “Ivy Island”. The vacation, which went before City Council this week for a first reading, will allow the Union at St Johns development to move ahead.

Developer Bob Ball has set up a new company, Robert Ball Companies, and is moving forward with a new building at 915 NW 21st Ave. The 21 Astor mixed-use building will include 27 apartments and 4,500 sq ft of ground floor retail.

The Daily Journal of Commerce published photos of the under construction Albina Yard office building. The four-story, 16,000 sq ft building is using Oregon fabricated Cross-laminated timber for its primary structure.

Portland Architecture wrote about the lecture and interview given by Kengo Kuma at Portland Art Museum. The Japanese architect is the designer of the new buildings currently under construction at the Portland Japanese Garden.

The Oregonian reported that Patrick Quinton, director of the Portland Development Commission, will step down this year after 5 years leading the agency.

Deconstruction has begun on two 1920s houses at NE 45th and Fremont, according to the Hollywood Star News. The project is the first commercial development so far to take advantage of Bureau of Planning & Sustainability offered incentives for deconstruction over demolition. The buildings will be replaced by the Bridgetown mixed-use development, which include 50 units of housing and 6,000 sq ft of retail.

After news broke about the Ankeny Blocks development last weekend, Food Carts Portland noted that the project could threaten the food carts at SW 5th and Stark, SW 3rd and Washington and SW 2nd and Stark. Journalist Michael Anderson replied with an article published on Medium titled “Chill, Portland: The downtown food carts are not about to close“.

The Willamette Week wrote that like the house in ‘Up’, the Dockside Saloon will live forever in a slot in the Field Office by Hacker Architects.

The Portland Business Journal wrote about how the onsite sewer and stormwater treatment system at Hassalo on Eighth saved the developers $1.5 million in City levied development charges. The NORM system treats 100 percent of the grey and black water created by the three residential buildings, along with the Lloyd 700 Office building.

Providore Fine Foods opened this week on NE Sandy, with vendors that include Pastaworks, Flying Fish Company and Oyster Bar, The Meat Monger, Little T Baker, Rubinette Produce Market, Emerald Petals and Arrosto. Eater PDX published photos of the completed interior.

 

Metro Reports: Multnomah County Health Dept HQ, NE MLK & Alberta retail, Field Office and more

Field Office

The Field Office by Hacker architects has been submitted for building permit review

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

ZGF Architects have requested Design Advice for the Multnomah County Health Department Headquarters:

Proposed project is a nine story headquarters building for the Multnomah County Health Department.

Early Assistance has been requested for a project at 2731 SE Belmont St: 

Proposed apartment project and street improvements storm – drywells for roof with overflow to combo sewer

Johnston Architects have requested Early Assistance for a project at 8506 N Edison St:

Development of two lots to include three 3-story buildings containing residential units, with a total of 18 units between the 3 buildings. Will need adjustments to parking.

Early Assistance has been requested for a project at 13434 SE Harold St:

Proposal is to develop site with condominimums using the “A” overlay and amenity bonus to increase density to 16 units total. The existing residence will be removed.

Early Assistance has been requested for a project at 4509 N Montana Ave:

Proposal for multi-family residential housing with group living components proposal will conform to Community Design Standards 33.218 ; live/work loft units @ ground level.

Carleton Hart Architecture have requested Early Assistance for a project at 6651 SW Capitol Hwy:

Proposal is for new construction of a 1500 sf single story building for use as a bath house for ritual Jewish tradition.

Early Assistance has been requested for a project at 432 NE Jessup St: 

New 12-unit residential building. House to be demo’d.

LRS Architects have scheduled a Pre-Application Conference to discuss Block 26 at NW 14th & Raleigh:

Proposal is for a 12-story building with 93 units of affordable housing and associated resident amenities on a 10,000 sf site. Parking for 18 cars will be provided on the ground floor.

Kōz Development have scheduled a Pre-Application Conference to discuss a project at 1015 NW 16th Ave:

Proposal is for a new 133 unit studio apartment building.

William Kaven Architecture have scheduled a Pre-Application Conference to discuss a project at 4073 N Williams Ave:

Proposal is for three levels office space over ground level retail and enclosed parking.

A project at 4330 SW Macadam Ave has been submitted for Design Review :

Proposal is to develop vacant building into a Tesla auto repair center and car showroom.

The renovation of One Pacific Square has been submitted for Design Review:

Expand ground floor by approximately 7,400 sq ft to accommodate indoor bike parking, conference rooms, exercise facility and retail/services uses. New landscaping also proposed.

Kōz Development have submitted a project at 2211 SW 4th Ave for Design Review:

Proposed project is for new construction of six level 114 unit studio apartment building.

Scott Edwards Architecture have submitted a project at 1451 NE Alberta St for building permit review:

Redevelopment of existing building to create ground floor warm shell retail and two floors – 10 units – residential units above. Including street landscaping

Emerick Architects have submitted the NW 21st & Irving Apartments for building permit review:

new 4-story mixed use development with commercial ground floor over one level of underground parking.

A building permit is under review for a project at 4335 SE Belmont St:

New 4 story, 63 unit apartment building with onsite parking, site utilities and landscaping

A building permit is under review for a project at 1931 N Williams Ave:

New five story apartment building with 1 level of below grade parking

A building permit is under review for a project at 7707 SW Capitol Hwy:

New four story apartment building, 72 units, approximately 40 parking stalls, 2 retail spaces, ***demo permit for existing structure to be obtained separately***

Hacker Architects have submitted the Field Office for building permit review:

below grade parking structure and foundation work includes mechancail

Tiland/Schmidt Architects have submitted the NE MLK & Alberta retail development for building permit review:

New single story 16,500 square foot masonry building, landscaping, parking, stormwater facility. Shell only, no occupancy this permit.

New single story 8,400 square foot masonry building, landscaping, parking, stormwater facility. Shell only, no occupancy this permit.

New 210 square foot trash enclosure

New 336 square foot trash enclosure

A building permit was issued for a project at 3514 NE Sandy Blvd:

Construct new one story building with associated site work and detached 73 sq ft trash enclosure

A building permit was issued to EPR Design for a project at 17423 SE Sherman St:

Build new 2 story adult care facility with site work

 

Design Commission approves Station Place Lot 5 (images)

The Design Commission has approved Station Place Lot 5, a new office building by Hacker architects, GBD Architects and 2.ink Studio. The project is being developed by Williams and Dame, and will offer 167,000 sq ft of office space, along with retail at the ground floor. The 8 story building will reach a maximum height of 122′. Structured parking for 55 vehicles will be provided, with an additional 97 parking spaces at the nearby Station Place car park leased for the use of building tenants. At the ground level a bike valet service operated by Go by Bike will provide parking for 133 bikes, along with a coffee counter and a bike repair service. Showers and 86 storage lockers will also be provided.

Station Place Lot 5

Read More

Metro Reports: Riverplace Parcel 3, North Hollow apartments, 9101 SE Foster and more

9101 SE Foster

9101 SE Foster by Hacker architecture

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Ankrom Moisan Architects have requested Design Advice for Riverplace Parcel 3:

Design Advice Request for two new proposed residential towers. The project will include 162 market-rate and 204 affordable apartment units. The ground level will include retail space and a grocery store. The residential units will share 173 below-grade parking spaces and a 65-space ground-level parking area will serve the grocery store.

Ankrom Moisan Architects have requested Early Assistance for 120 SE Clay:

Industrial site office development. Basement includes approx 82 parking spaces – accessed via Clay.

TVA Architects have submitted a project at 442 NE Jessup for Design Review:

New apartment

Hacker Architecture have submitted 9101 SE Foster Rd for Design Review:

4-story mixed use development with ground floor commercial and 3 floors of apartments.

Woofter Architecture have submitted the PSU Viking Pavilion for Design Review:

Renovation and modernization of existing Peter Stott Center building

Works Partnership have submitted a project at 1400 NW 22nd for building permit review:

Alterations-exterior alteration improvements w/storefront and accessible entrances. ASCE 41 structural seismic upgrade. Addition of exterior courtyard and roof deck interior improvements. Interior improvements include water closets, lavs and bike storage, enclose trash and utility room.

A building permit was issued to SERA Architects for the North Hollow apartments at 1501 SW Taylor St:

partial – shoring; excavation; underground utilities and concrete structure from mat slab up to and including the 2nd floor concrete podium.