Metro Reports: Oregon Square, Overton 15, Beatrice Morrow, and more

Oregon Square Phased

The complete phased build-out of Oregon Square, as approved by the Design Commission in October 2016. Changes are being proposed to Block 103, shown at the right side of the image.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by GBD Architects for changes to Phase 2 of Oregon Square:

Changes are being proposed to LU 16-195933. Block 103 (SE) within Phase 2 is being proposed to change from a multi-story residential building to a mixed-use speculative commercial office building. The building along with the approved design of block 102 (NE) along with the approved buildings in Phase 1 will surround a publicly accessed pedestrian-only plaza. Two levels of below grade parking are proposed beneath 103 with the opportunity to connect 90 (SW) and 91 (NW). Changes to blocks 90 and 91 will add one level of below grade parking.

A Pre-Application Conference has been scheduled to discuss a project at 5727 SE 136th Ave:

Construct a new 2-story church with parking lot at this location. Intent is to use the portion of the site zoned CN2 as the parking lot, and the R2a as the structure.

A project at 5421 NE 14th Pl has been submitted for Type III Comprehensive Plan Map Amendment:

Comprehensive Plan Map Amendment with Zone Map Amendment. The site would be rezoned from R1(Medium Density Multi-dwelling Residential) to CS (Storefront Commercial). The CS zone allows both commercial and residential uses. There is a two-story apartment building with 9 units on the site. The proposal is to redevelop the site with a 4-story mixed use building (Harvey Rice Heritage Center) with 20 residential units, 4,300 square feet of office on the second floor and 2,820 square feet of retail space on the ground floor. Ten on-site parking spaces are proposed with access from NE 14th Place. The parking area is partially underneath the second story of the building.

A project at 6103 SE Cora St has been submitted for building permit review:

New 3-story 15-unit apartment complex, with attached trash enclosure, and associated site work

The Overton 15 apartments have been submitted for building permit review:

New 7-story mixed use building with 68 apartments with ground level offices

A revised building permit for a project at 5965 SE Milwaukie Ave (previously 6003 SE Milwaukie) has been submitted for building permit review by Urban Development Group:

New 4-story 54 unit apartment complex, trash enclosure within structure and associated site work

A project at 3926 SE 11th Ave has been submitted for building permit review by SG Architecture:

New 1-story fellowship center 7,415 sq ft; basement – storage, mechanical equip, trash enclosure; main floor multi-purpose area, commercial kitchen, restrooms, storage, entry; exterior stairs/driveway on north elevation, new ADA ramp and stairs on west elevation, new parking lot on east elevation ***mechanical permit 17-174944mt ***

Building permits were issued to City Craft Development for projects at 7025 N Mohawk Ave and 7045 N Mohawk Ave (previously 7023 N Mohawk Ave and 7031 N Mohawk Ave):

New 2 story apartment building with 7 dwelling units with attached trash enclosure and sprinkler riser room, detached barbeque area, and associated sitework (same as 17-101237-CO)

New 2 story apartment building with 7 dwelling units with attached trash enclosure and sprinkler riser room, detached barbeque area, and associated sitework (same as 17-101236-CO)

A building permit was issued to Carleton Hart Architecture for the Beatrice Morrow Apartments (Grant Warehouse Redevelopment) at 3340 NE Martin Luther King Jr Blvd:

New 5 story, multi-family building with 80 units and ground floor retail (future). Site work includes new parking, circulation paths and landscaping.

A building permit was issued to SERA Architects for a project at 5005 NE Sandy Blvd (previously 5035 NE Sandy Blvd):

Construct new 2 story building core and shell, no occupancy, to include on ground floor covered parking, bike storage, trash enclosure, and associated site work.***mechanical permit 17-110802mt****

A building permit was issued for a project at 3334 SE Belmont St:

New 3 story mixed use building; group B occupancy shell tenant space on half of first floor and apartments on remaining first, second, third floors.

 

Metro Reports: 3rd & Taylor, Jantzen Apartments, 4040 SE Division, and more

3rd and Taylor

A building permit is under review for the 3rd & Taylor office building

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Quilici Architecture & Design Inc for a project at 4040 SE Division St:

Proposal is for a new 38 units with affordable housing (20,640 sf total) without parking. Stormwater planter provided along south PL. Main enterance and lobby on Division St. Trash and recycle room located on north side of building and accesed off Difision St. Existing commercial structure and all trees on-site to be removed.

Early Assistance has been requested by Quilici Architecture & Design Inc for a project at 3212 SE Division St:

Proposal is for a 32 unit apartment complex which includes affordable housing (20,640 sf total) without parking. Stormwater planter provided along south PL. Main enterance and lobby on 32nd Avenue. Trash and recycle room located on south side of building and accessed off 32nd. Existing commercial structure and all trees on-site to be removed.

A building permit application has been submitted for review by David Rodeback Architect for alterations to an existing building at 6012 SE Yamhill St:

Existing 4-story building – change of occupancy and use from R1, B, |A3 to R2 & A3 with 62 new apartment units and 14 sleeping units added, and complete seismic retro fit for entire building

A building permit application has been submitted for review by SERA Architects for the Jantzen Apartments at 518 NE 20th Ave:

New 6 story above grade with full basement. 211 apartments, 114 parking stalls, with retail, common space on ground floor

A building permit application has been submitted for review by TVA Architect for a project at 5036 NE Sandy Blvd:

New 6-story, 85 unit apartment building; ground floor shell only; recycle room; with onsite parking, includes associated site work***with 17-169667-MT permit***

A building permit application has been submitted for review for a project at 5419 SE Woodstock Blvd:

New 3 story 38 unit apartment building; interior trash enclosure; associated site work

A building permit application has been submitted for review by Ankrom Moisan Architects for the 3rd & Taylor office building:

New 10 story speculative office building, ground floor retail and comond and support area serving office functions, 2 stories of below grade parking

A building permit was issued for a project at 1211 SE Morrison St (previously 1205 SE Morrison St):

Construct new 4 story (39) unit apartment building with parking and bike storage on main level; associated site work

Design Commission approves Raleigh 22 (images)

The Design Commission has approved the Raleigh 22 Apartments, a 6 story mixed use building by SERA Architects for developer Cairn Pacific. The 70′ tall building will include 173 residential units, with 6,118 sq ft of ground floor commercial space along the NW Raleigh and 22nd frontages, and 1,746 sq ft of commercial space facing facing NW Quimby. Vehicular parking will be provided in an underground parking garage, which will also include long term parking for 216 bicycles.

Raleigh 22

Read More

Clay + Tiffany Apartments receive Design Advice (images)

Design Advice has been offered for the Clay + Tiffany Apartments, a 163′-9″ tall student housing tower being developed by non-profit College Housing Northwest (CHNW) in collaboration with Mainland Northwest, LLC. The sixteen story building, designed by SERA Architects, will include 252 “group living” studio apartments with shared kitchens, as well as 3 one-bedroom units and 3 two-bedroom units. A retail space is proposed at the ground level. No vehicular parking parking is proposed.

Clay + Tiffany Apartments

Read More

Metro Reports: Collective on 4th, Portland Building, 3612 SE 82nd, and more

The first building permit was issued for Core Spaces’ Collective on 4th.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by SERA Architects for a project at 1715 NW Couch St:

New six story residential project with one level of below grade parking. Project will be 160,000 GSF above grade with 200 units. FAR is 4:1.

Design Advice has been requested by TVA Architects for a project at 1650 NW Naito Parkway:

new 17 story apartment building. 270 residential units are proposed. The first floor will have both residential and parking. There are 192 underground parking spaces. The access for the parking would be from NW Naito. One loading space is proposed. The property will be divided to create a 79,700 square foot site for this development.

Early Assistance has been requested by Urban Development Group to discuss changes to a project at 2548 SE Ankeny St:

Proposal for a new apartment building of 96 units to replace CO 16-198732, no parking.

Early Assistance has been requested by Urban Development Group to discuss changes to a project at 316 NE 28th Ave:

Proposal is to build a new apartment building to replace CO 16-196951 for 119 units and no parking.

Early Assistance has been requested by Urban Development Group to discuss changes to a project at 2789 NE Halsey St:

Proposal is for a new apartment building of 53 units no parking which would replace CO 16-178394.

Early Assistance has been requested for a project at 3612 SE 82nd Ave:

Project consists of an approx. 8500 SF, single story new core and shell building for up to nine restaurant tenants on property that was previously used as a restaurant. The existing unoccupied building may be demolished. Site work will consist of selective demolition, new infrastructure and parking lot repairs to 15 food carts, seating areas, and required parking.

The rebuild of the Portland Building has been submitted for Type III Historic Resource Review by DLR Group:

Full renovation of an existing 15-story office building including seismic upgrade and replacement of MEP systems. Proposed exterior renovation includes replacement of all existing facade finishes and glazing systems. New building cladding system will sit outboard of the existing building face. Two areas of the existing covered loggia on the first floor are being enclosed and added to the interior building area. No additional impervious surfaceor roof area is being added. This is a historic building.

An excavation and shoring permit was issued the Collective on 4th at 325 SW Harrison St:

partial – site clearing and demolitoin, tree removal, excavation, shoring and erosion control.

Raleigh 22 Reviewed by Design Commission (images)

An initial Design Review hearing has been held for the Raleigh 22 Apartments, a 6 story mixed use building by SERA Architects for developer Cairn Pacific. The 70′ tall building is proposed to include 173 residential units, with 6,118 sq ft of ground floor commercial space along the NW Raleigh and 22nd frontages, and 1,746 sq ft of commercial space facing facing NW Quimby. Vehicular parking will be provided in an underground parking garage, of either one or two levels, which will also include long term parking for 216 bicycles.

Raleigh 22

Read More

Under Construction: Leland James office building (images)

This is an updated version of a post originally published on October 19th, 2015.

Construction is underway on a major renovation of the Con-way Leland James Center, which will see the existing building gain an additional story and an entirely new facade. The building will primarily be used as creative office space, with three new retail units added at the ground floor. An existing basement will be converted in parking for 72 cars and 150 bikes. Showers and lockers will be provided for the benefit of bike commuters.  The design of the project is by SERA Architects for developers Cairn Pacific and Capstone Partners.

Conway Leland James Center

Read More

Metro Reports: 72 Foster, South Waterfront Blocks 42 and 45, 600 SW 5th Ave, and more

72 Foster

At the 72 Foster affordable housing development REACH CDC and Housing Development Center will partner with the Asian Health & Services Center to provide resident services, including community gatherings, cultural and social events, and health promotion and wellness activities.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by GBD Architects for South Waterfront Blocks 42 and 45 on the Prometheus Property:

Design hearing – project consists of two seven story mixed use buildings, each building consisting of approximately 4,000 sf of retail, 200-300 market rate apartments and 150-200 off street parking stalls in one level of structured underground parking and a partial level of structures at-grade parking.

Design Advice has been requested by Hacker Architects for the Neuberger Hall Renovation:

DESIGN HEARING – Discuss the renovation of Neuberger Hall on the PSU Campus. The scope of work includes updating accessibility, fire, life, safety upgrades , deferred maintanence and façade improvements. (See separate PC 17-115464 for associated PC for temporary modulars).

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 600 SW 5th Ave (former Ross at SW 4th & Alder):

Proposal is to demolish existing 1/4 block building and replace with a new construction 215 room, 15 floor hotel. Approximate new construction square footage will be 136,000sf. Building height will be approximately 153′. Ecoroof and flow-thru planter placed at the 3rd floor level on roof deck to handle total roof area stormwater. Remaining portion of roof deck at 3rd level will be applied for exemption thru special circumstances.

Early Assistance has been requested for a project at 515 NE 82nd Ave:

Scope of work includes removal of existing convenience store, fuel canopy, fuel dispenser islands and restaurant. Construction of a new convenience store, fuel canopy and 4 fuel dispenser islands, landscaping, curbs and paving. Existing underground storage tanks to remain.

A Pre-Application Conference has been scheduled by Mackenzie to discuss a project at 3075 NE Sandy Blvd:

Proposal is for a new Lexus dealership. 2-story building with one level of below-grade structure. Ground floor uses will include an automotive showroom and leasable retail with structured parking on the second and third levels, and an automotive service shop on the lower level. Vehicular access is proposed off NE 31st Avenue in two locations, approximately the same as the existing access points from this street. Access from NE Sandy Blvd is not proposed for the new building.

A project at 6025 SE Powell Blvd has been submitted for Type II Design Review:

New construction of a 3-story self-storage building with associated parking, utilities, and landscape.

Building permits have been submitted for review by Mahlum Architects for a portion of the Grant High School Modernization:

Abatement and selective demo, main building structure, masonry and facade restoration, underslab MEP, below grade waterproofing

Abate and demo 1959 library, lower level cafeteria addition, below grade fan room. Abate and selective demo original 1923 admin building, 1925 north wing, 1927 south wing, 1927 auditorium, and 1952 west addition to north wing. Shoring and tiebacks with associated waterproofing at west facade of 1923 admin bldg. Associated civil work (excaation of courtyards), construction staging pad, fill at 1956 gym, erosion control and tree removal

Mass demolition of free standing 1956 gymnasium with basement

Mass demolition of free standing 1962 portable bldg 1

Mass demolition of free standing 1966 science building

Mass demolition of free standing 1962 portable building 2

Mass demolition of free standing 1962 portable building 3

72Foster at 7120 SE Foster Rd has been submitted for building permit review by Holst Architecture:

New four-story mixed-use multi-family building with 101 apartment units over ground floor retail and residential services; 35 on-site parking stalls

Design Commission approves hotel at SW 11th & Alder (images)

A proposed hotel at SW 11th & Alder by SERA Architects for developer Mortenson has been approved by the Design Commission. The 150′ tall building would include 215 hotel rooms, with a lobby, bar / restaurant and lounge at the ground level. Meeting rooms would be located at the second floor. A fitness room and long term parking for 14 bicycles would be provided at the third floor. No vehicular parking is proposed.

619 SW 11th Ave

Read More

Metro Reports: Oliver Station, Multnomah County Health Dept HQ, Seven Corners Community Collaborative, and more

Building permits were issued for Oliver Station, a new two block affordable housing development in Lents on the site formerly occupied by the New Copper Penny

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by SERA Architects for a project at 1110 SW Clay St:

A new mixed use building for student housing. Commercial space is proposed on the ground floor. The sixteen story building would have 260 units. There would be a mix of studios, and one and two bedroom units. No on-site parking is proposed. A loading space is proposed with access from SW Clay.

A project at 1823 SE 50th Ave has been submitted for building permit review by Otak Architects:

New 4 story, 19 unit apartment building, includes associated sitework

A project at 4073 N Williams Ave has been submitted for building permit review by William Kaven Architecture:

New 4 story mixed use building parking on ground floor with retail and office two through four; enclosed transformer at southwest corner; associated site work; shell only for retail space on first floor

A project at 12315 SE Division St has been submitted for building permit review:

New construction of 3 story 106,407 sf self storage facility with associated parking, utilities and landscape, interior trash room.

A building permit was issued to CIDA Architects for a project at 7510 SE Milwaukie Ave (previously 7430 SE Milwaukie): 

New 3 story 30 unit apartment building (sits on two lots)

A building permit was issued to Ankrom Moisan Architects for Oliver Station at 5990 SE 92nd Ave and 5959 SE 92nd Ave:

Affordable Housing Project – New mixed use, 70 dwelling unit affordable housing project. 4 stories of residential above podium with one story of retail below. Surface parking, no basement. Septic Decommissioning Required. Call for Inspection 842.

Affordable Housing Project – New 5 story, 75 dwelling unit apartment building with 4 stories of residential and 1 story of retail Septic Decommissioning Required. Call for Inspection 842.

A building permit was issued to Morton Building Design for a project at 5321 NE Irving St (previously 5325 NE Irving St):

Construct new 4 story, 7 unit condo building with parking, includes associated site work, detached trash enclosure is less than 120sf in area

A foundation permit was issued to ZGF Architects for the Multnomah County Health Department Headquarters at 600 NW Hoyt St:

Foundation permit to include excavation and below grade foundation(piles, pile caps, foundation basement walls), under-slab utility rough in and a fire water tank. Excludes ground level concrete slab and structural lids for below grade components.

A building permit was issued for the Seven Corners Community Collaborative at 2475 SE Ladd Ave:

Construct new 4 story office building with retail and parking on ground floor, offices on floors 2-4, includes associated site work