Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers June 3rd to June 9th, 2019.
Design Advice has been requested for the Toyoko Inn at SW 3rd & Oak:
Development of Toyoko Inn economy hotel with approximately 600 rooms.
Early Assistance has been requested by Benner Stange Associates Architects for a project at 7438 N Oswego Ave:
New 18-unit, 2-story apartment building (to meet community design standards). Two drywells for storm water. They will be using amenity bonuses per 33.120.265.
A project at 1408 N Kilpatrick St has been submitted for a Pre-Permit Zoning Plan Check by R & B Design Studio:
Building 2 of 2, to be built on east 8,343 SF portion of site. Three story, 18 affordable housing units. Associated with entire site utility/grading permit 18-280322-UTL-01-CO and to be reviewed concurrently with Building 2 MT permit. For stormwater disposal methods, please see stormwater management plan attached.
A building permit was issued to Doug Circosta Architect for the Wild Ginger Apartments at 220-250 SE 143rd Ave:
New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 100 12 new apartment units, short term bicycle parking and covered porch, includ
New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 200 12 new apartment units
New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 300 18 new apartment units and short term bicycle parking
New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 400 12 new apartment units
New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 500 6 new apartment units, trash enclosure and laundry, and long-term bike parking.
A building permit was issued for a project at 475 NE 74th Ave:
Construct new 3 story (12) unit apartment building with associated site work
Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers May 27th to June 3rd, 2019.
Early Assistance has been requested for a project at 5105 SE Woodstock Blvd:
Construct a 27 unit apartment building.
Early Assistance has been requested by Scott Edward Architecture for a project at 7601 SE Division St:
Four or five story multi-family building consisting entirely of affordable housing (approximately 118-130 units)
Early Assistance has been requested for a project at the southeast corner of NW 20th & Savier:
Discuss the feasibility, needed analysis and evidence to amend the Conway Master Plan (LU 12-135162), as applied to Blocks 16, 261, and 262, to allow a hotel. No change to Master Plan-wide FAR cap or existing height limits proposed.
A Pre-Application Conference has been scheduled by EPR Design to discuss a project East of 12395 SW Clara Ln:
Proposal to construct a new 60-90 bed residential care facility licensed by the State of Oregon for 24-Hour Care. The residents will not be driving or own cars that are parked at the site. There will be one common kitchen and one common dining area. No kitchens provided in the resident rooms. The resident rooms will consist of a sleeping area and a private 1/2 bath. Onsite parking is proposed, a trash enclosure and associated site work and landscaping.
A Pre-Application Conference has been scheduled by DAO Architecture to discuss a project at 2171 NW Glisan St:
Two proposed 3-story affordable multi-family buildings (one with basement), focused on providing compact apartments/residences for single moms. Project includes (13) 2-BR units (including 1 ADA-accessible unit) and 600 sq ft day care on basement level. Non-contributing
A Pre-Application Conference has been scheduled by Lever Architecture to discuss the renovation of the Artists Repertory Theater at 1515 SW Morrison St:
Renovation of the existing 18,000sf Artist Repertory Theater (ART) building. The renovation will add new theater, rehearsal, office and support space for ART and a dozen affiliated companies in the ART HUB. The expansion will add a partial second floor and increase the total area to approximately 28,000sf. The existing concrete exterior walls and the east and west bays of existing structure will remain. The central portion of the building will be rebuilt with a higher structure to accommodate a large theater and second floor. The existing covered drive will be infilled with a new main entry and lobby space. The two levels of parking below the main floor will remain. Parking Level 1 will be accessed from an entry in the building along SW 15th Avenue. Parking Level 2 will be accessed from a new entry in the future ART Tower. The building will undergo a full seismic upgrade. Given the existing conditions, the project has limited stormwater options. The project team will review with BES
Buildings permit were issued to Works Progress Architecture for the Tacoma Commons at 2000 SE Tacoma St:
New three-story, three unit mult-family structure (1 of 4, with 17-194721,-24,-27 CO ) includes site utilities
New three-story, three unit mult-family structure (2 of 4, with 17-194710,-24,-27 CO )
New three-story, three unit mult-family structure with trash enclosure. (3 of 4, with 17-194710,-721,-727 CO )
New three-story, three unit mult-family structure (4 of 4, with 17-194710,-721,-724 CO)
A building permit was issued to R & B Design Studio for a Habitat for Humanity project at 8120 N Interstate Ave:
Building 1 of 2, to be built on west portion of site. Review with 18-280327-MT (HVAC for building). Three story with partial 4th story, 12 affordable housing units. Entire site Grading and Utility permit 18-280322-UTL-01-CO be reviewed concurrently. Permit for 2nd building to come in after this CO and UTL both issued.
A building permit was issued to Works Progress Architecture for Nomad at 5620 N Interstate Ave:
New construction of 7-story Mixed-Use Building; 2-stories C.I.P. Post-tensioned Concrete Slabs and Columns, 5-stories wood-frame. 6 levels of Residential Units with Amenity over 1 Level of Residential Amenity and Retail. Work to the Retail will be included as part of this Permit. The Overall Buillding Height is less than 75ft.