Weekly Roundup: 72Foster, USPS site, Hampton Inn, and more

Hampton Inn & Suites

The Pearl District Hampton Inn & Suites, with 243 rooms, is now complete.

The DJC looked at how national brands adopt their brand standards to meet Portland’s design review guidelines,* with the Pearl District Hampton Inn as one example. The Business Tribune looked at how the newly opened hotel intends to serve tourists and business travelers alike.

City Observatory analyzed Portland’s Inclusionary Zoning ordinance, which so far appears ‘to be creating incentives for developers to ‘go small’.”

According to the Portland Tribune the Post Office Site will be offered to Amazon as a potential location for its second headquarters.

The Business Tribune reported that REACH Community Development’s 72Foster affordable housing development has broken ground.

The DJC published photos of the completed PSU Karl Miller Center.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Weekly Roundup: Albina Vision, 2505 NE Pacific, Tanner Creek Tavern, and more

An aerial view of the Albina Vision (labels by Bike Portland)

BikePortland took a look at the Albina Vision, a concept plan to restore the historic Rose Quarter neighborhood and put biking and walking first.

As the City Council held its first hearing on the Central City 2035 Plan, the Oregonian looked at 9 key changes proposed.

Seattle based Security Properties has closed on the 4.7-acre PepsiCo site at 2505 NE Pacific St, writes the DJC.  The developer is “is in the process of interviewing architects to begin conceptual design for the multiphase redevelopment”. With news of the development breaking, theOregonian asked if Sandy Boulevard is the next Hawthorne?

The Portland Business Journal took a first look at chef David Machado’s Tanner Creek Tavern, which opened this week in the Pearl District Hampton Inn & Suites.

Core and shell work has wrapped up at the Towne Storage Building. The DJC published photos of the  renovated building, before construction begins on the tenant improvement for software company Autodesk.

Lastly, a note on the frequency of posts here at Next Portland. As some people have noticed the number of posts published has gone down a lot in the last couple months. This isn’t a reflection of there being less to write about; it’s just that Next Portland is written by just one person, in my spare time, and I haven’t had the ability to commit time to the site in recent months. As things are getting back to normal I hope to be able to return to the regular posting frequency. There are many large projects that I haven’t yet had a chance to write about, but which I think Next Portland readers will enjoy learning about.

Weekly Roundup: Makers Row, Workmen Temple, Franklin High School, and more

Makers Row, designed by Risa Boyer Architecture, will include both commercial space and 19 apartment units

David Machado’s Tanner Creek Tavern has set a September 12 opening date, reports the Portland Mercury. The restaurant will be located in the Pearl District Hampton Inn & Suites.

Portland Architecture wrote about the “tragic” United Workmen Temple demolition. The building is currently being demolished to make way for the 3rd & Taylor office building.

The Portland Business Journal took a first look at the $49 million Faubion Elementary School, built in partnership between Concordia University and Portland Public Schools.

Portland Architecture visited the modernized Franklin High School.

The Hollywood Star News reported Makers Row in Cully is “nearing completion, with occupancy expected to start in late August“.

The Oregonian took a look at Amazon’s new Portland office in the 1320 Broadway building.

Mayor Ted Wheeler has hired a housing policy staffer, after nearly eight months in office, according to the Willamette Week.

Weekly Roundup: Hampton Inn, Custom Blocks, Garlington Center, and more

Custom Blocks

Interior of the Custom Blocks development, by developer Capstone Partners and architect Scott Edwards Architecture.

Eater PDX reported that chef David Machado will open Tanner Creek Tavern this summer in the Pearl District Hampton Inn & Suites.

The Business Tribune looked at the transformation of the Goat Blocks.

Places over Time studied the past, present and future of the Lloyd Districtwhich is being transformed by developments such as Oregon Square, 1400 NE Multnomah, 1510 NE Multnomah and Block 45.

The Custom Blocks at 1340 SE 9th Ave and 925 SE Main St are the latest industrial buildings in the Central Eastside to be converted to creative office use. The Business Tribune looked at how the buildings are evolving.

The Portland Business Journal reported that the Garlington Center affordable housing / health care development has been awarded $4.5M in tax credits.

Oregon Business reported that Portland is getting ready to issue $9 million of bonds to fund future affordable housing projects, backed by revenues from short term rentals such as airbnb.

Under Construction in the Pearl: Hampton Inn & Suites (images)

This is an updated version of an article originally published on August 7th 2015.

Construction is underway on a 243 room Hampton Inn & Suites in the Pearl District. At the ground level the building will have public spaces such as the lobby, lounge, dining area and meeting rooms facing onto NW 9th Ave. Restaurant and retail spaces will face onto NW Everett St and onto NW Park Ave. 104 on-site parking stalls will be located in above grade structured parking, accessed from NW Flanders St.

The developer of the project is Wisconsin based Raymond Management CompanyGary Brink & Associates, also of Wisconsin, are the architects of record, while local firm Hannebery Eddy are serving as the design architects. The landscape architects are Lango Hansen.

Hampton Inn & Suites

Read More

Metro Reports: Faubion Elementary School, Pearl District Hampton Inn, Lents Town Center Property #3 and more

The Faubion Elemen

The new Faubion Elementary School by Bora Architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Steelhead Architecture have requested Early Assistance for the Lightbox Going at NE Going and N Williams:

New Construction – three new units on one property.

Carleton Hart Architecture have requested Early Assistance for a project at Lents Town Center Property #3 (North):

New 4-story wood-framed multi-unit housing with 68 units and a community space. Working with the PHB.

GBD Architectects have scheduled a Pre-Application Conference to discuss a project at 1331 NW 17th Ave:

Pre-Application Conference to discuss a possibleType III Design Review or possible Community Design Standards Plancheck Review (depending upon the size of the building) for a new mixed-use multi-dwelling residential building. The applicant requests development-related information and the assigned Planner to compare the Design Review and Community Standards tracks. The proposed new development may range from 55 to 120 feet in height with a range of 4:1 to 7:1 FAR. Parking will be accommodated within the building. Number of spaces and configuration has not been determined. The existing commercial building will be demolished.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 905 NW 17th Ave:

Pre-Application Conference to discuss a Type III Design Review for a new 6-8 story mixed use building with 140-190 residential units, ground floor retail and below grade parking – approximately 70 spaces.

Soderstrom Architects have submitted a project at the St John Fisher Parish for a Conditional Use Review:

Type III Conditional Use Review to construct a new parish hall and make alterations to existing church and church rectory.

Demolition permits were issued to Koz Development for two buildings at 1015 NW 16th Ave, including the former Slabtown bar:

Demolish single family residence, infill basement, cap sewer, remove all debris

Demolish tavern, cap sewer, remove all debris

CIDA Architects have submitted a project at 5816 SE Foster Rd for building permit review:

Construct new 3 story (30) unit apartment building; with associated site work ***see 16-125884-CO separate permit for trash enclosure and covered bike parking***

Urban Development Group have submitted a project at 3701 SE Caruthers St for building permit review:

New 4 story 30 unit apartment building with (1) retail space on ground floor. Site improvements and flow-through planter.

A building permit was issued to In Situ Architecture for a project at 3740 SE Haig:

Addition of 2 stories to existing single story duplex (with unit on main level and one in basement) to create 4 plex, new units are 2 story units, detached trash enclosure is 20sf

SRG Partnership have submitted drawings for the Knight Cancer Research Building for building permit review:

75% plans for 6 story medical research building , 2 levels of below grade parking 1st floor retail.

A building permit was issued for a project at 1308 NE Dekum St:

New 3 story (28 unit) modular apartment building; see comments and project file for scope of modular reviewed by state.

A building permit was issued to Bora (formerly Boora) Architects for the Faubion Elementary School Rebuild:

New three story, 133,000 sf pre kindergarten through 8th grade school with spaces for Concordia University college of education classrooms, offices, and community service partner organizations

A building permit was issued to Gary Brink & Associates for the above ground work at the Pearl District Hampton Inn & Suites:

New 8 story hotel with 243 guestrooms, 104 parking stalls above grade, ground floor retail, indoor pool. Slab-on-grade, 3 levels of PT concrete floor system and 4 levels of non-combustible steel stud/composite joists.

Focus: 20 new hotels proposed for Portland

When construction activity first started to return to Portland around 2012 it seemed like all that was being built was apartments. While residential still dominates the construction industry, other sectors of the market have started to return. In the last year there has been been a noticeable increase in the number of hotels proposed in Portland. Next Portland counts at least 20 hotels either proposed, going through Design Advice / Design Review, being reviewed for building permits or under construction. Together these represent over 3000 new rooms, a substantial number for a city that had 25,924 rooms in its metro area as of 2014.

It is unlikely that every single hotel on this list will be built; some of the Early Assistance application may represent property owners performing a feasibility study, and there is always the possibility of a downturn in the economy. Even still, it’s clear that Portland is going to have a substantially larger number of hotels in just a couple years. Click through to see the full list, arranged by number of rooms.

1 – Hyatt Regency at the Convention Center

Number of rooms: 600+
Architect: Ankrom Moisan Architects, ESG Architects
Status: Design Advice

Hyatt Hotel at the Oregon Convention Center

Read More

Metro Reports: St Francis Park Apartments, PSU School of Business Administration, 4th & Harrison and more

4th & Harrison

4th & Harrison, as presented at Design Advice

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Barry Smith Architect has requested Early Assistance for a project at 518 SE 76th Ave:

46 unit apartment building with 8 cars in parking garage; 4 floors

BAMA Architecture and Design have requested Early Assistance for a project at 10010 SE Ankeny St:

Lot line adjustment and phased development of multiple buildings to include multi-family, parking, industrial flex space.

Solterra have requested Early Assistance for a project at N Failing & Vancouver:

53-unit mixed use apartment building with active urban canyon

Works Partnership have requested Early Assistance for a project at 1400 NW 22nd Ave:

Proposal for major commercial alterations with exterior improvements. Uses will include office, retail and manufacturing.

Barry Smith Architect has requested Early Assistance for a project at 829 NW 19th Ave:

Move existing home on property to within 20 feet of NW 19th. Confirm and adjust lot lines for 2 lots. On Vacant lot develop a 50 unit, 6 story apartment building located within the Alphabet Historic District.

Mortenson Development have scheduled a Pre-Application Conference to discuss a new hotel at 619 SW 11th Ave:

demolish existing 1/4 block building and replace with a new construction 221 room, 15 floor hotel.

A Design Review has been submitted for a project at 1112 SE Lincoln St:

Construction of 2 tri-plex residential structures – one on each parcel

The St Francis Park Apartments by MWA Architects have been submitted for Design Review:

New 106-unit multi-dwelling residential development.

The 4th & Harrison apartment complex by Core Spaces has been submitted for Design Review:

Design Review for new 15-story glass and metal panel building – grocery store at ground level and 14 stories of luxury residential apartments, above. 1 modification requested to reduce landscape area; 1 modification requested to replace landscaping with hardscape; 1 modification requested for the width of the oriel window; 1 adjustment requested to parking access & loading; 1 adjustment requested for # of parking stalls.

ZGF Architects have submitted the Canopy Hotel for Design Review:

11 Story, 150 room Hotel

SRG Partnership have applied for building permits for the PSU School of Business Administration:

40,000 Sf multi-story addition, renovation of 52,000SF existing

Reroute on site utilities, demo on site portion of sky bridge, remove exerior cladding of existing building, interior demolition. ***40,000 SF multi-story addition, renovation of 52,000SF existing***

foundation and walls to grade of pavilion/atrium, cladding of existing building, ***40,000 SF multi-story addition, renovation of 52,000SF existing***

Demolition permits were issued for the existing buildings due to be replaced by the Pearl Hampton Inn & Suites:

Demo existing 2 story building

Demo two story building; no basement

Demo existing 3 story building with partial basement

A building permit was issued for the Kenton Mixed Use Phase III at 2111 N Willis Blvd:

New four story apartment building with courtyard and balcony at center, 37 units, 2 retail spaces on main floor, parking at east and north sides, detached trash enclosure, associated landscaping and stormwater facilities

A building permit was issued to Anrkom Moisan Architects for 2010 NW Pettygrove St:

new 5-story, 49 unit apartment with tucked under parking

Pearl Hampton Inn & Suites (images)

Design Review drawings for a Hampton Inn & Suites in the Pearl District have been submitted to the City. The proposed 8 story hotel at NW 9th & Everett will have 243 guest rooms and 104 above grade car parking spaces. The ground level will include hotel public spaces such as the lobby, lounge, dining area and meeting rooms facing onto NW 9th Ave. There will also be restaurant and retail spaces fronting NW Everett St and NW Park Avenue. A roof terrace overlooking the Park Blocks will be located on the 8th floor.

The developer of the project is Wisconsin based Raymond Management CompanyGary Brink & Associates, also of Wisconsin, are the architects of record, while local firm Hannebery Eddy are serving as the design architects.

Hampton_Inn_img_01

Read More

Metro Reports: Central Eastside offices, Pearl District hotel and more

Couch9

Vallaster Corl’s Couch9, as presented at Design Advice

Every week, the Bureau of Development services publishes a list of early assistance applications, land use reviews and building permits. We publish the highlights.

Carleton Hart Architecture have requested Early Assistance for a project at 110 SW Arthur, planned by Central City Concern:

EA to discuss proposed 39-unit multi-dwelling project with potential height Adjustment

Early assistance was requested for a project at 2601 SW Water Ave. The owner is Kevin Cavenaugh, of Guerrilla Development.

Multi-family building.

Vallaster Corl have applied for a Type III Design Review for their Couch9 project at 115 NW 9TH Ave:

11 Story building

FFA Architecture & Interiors have applied for a Type III Design Review for the Fair Haired Dumbbell, also by Guerrilla Development:

New mixed-use office building with retail use at the ground floor. Six stories with basement parking. Project will include full row street improvements. Stormwater plan will meet BES standards.

The NW Everett Hotel in the Pearl is also in for a Type III Design Review:

Design review for 232-unit, 8-story, mixed use hotel project with 114 parking spaces, with modifications to ground floor window standards and loading space standards.

di loreto Architecture have applied for a Type III Historic Resource Review for an addition to St Michael the Archangel at 424 SW Mill St:

Historic Landmark review of ADA and seismic upgrades, addition and site improvements.

Mackenzie have applied for a building permit for an office at 240 SE Clay. The site is owned by Killian Pacific, the developer behind the Goat Blocks project. A project valuation of $12,935,996 was listed.

New industrial office building with structured parking at lower level and the below grade parking area will also utilize the existing retaining wall, adjacent surface parking lot will utilize the exterior wall of the existing building at the perimeter