Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.
Early Assistance has been requested by Doug Circosta Architect for a project at 4775 N Lombard St:
26 new apartment units.
Early Assistance has been requested for a project at 5419 SE Woodstock Blvd:
2 New, 2-story multi-family building.
Early Assistance has been requested by Hacker Architects for a project at 3325 SE Division St:
Demo existing structure and build a new 26,000 sq ft multi-family building.
Early Assistance has been requested for a project at 3035 SE 92nd Ave:
Proposal is to build a 30 unit apartment building. Existing residence will be demolished.
A Pre-Application Conference has been scheduled by MCA Architects to discuss a project at NW 13th & Quimby St:
Pre-application conference to discuss new 5-story self storage facility.
A Pre-Application Conference has been scheduled to discuss a project at 2537 SE 13th Ave:
Request to change zoning from R2 to R1, to accommodate a 4-unit condo project.
A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 3714 SW Macadam Ave:
Pre-application conference to discuss Block 40 South Waterfront – single block mixed use development divided into 2 parcels.
A project at 12315 SE Division St has been submitted for Type II Design Review by AAI Engineering:
Proposal is for a 112 sf of self-storage facility with associated parking, utilities and landscaping.
A project at 20 NE Tillamook St has been submitted for Type II Design Review by Green Hammer:
Proposal is for a net zero energy 16-unit apartment complex developed in four buildings organized around a central courtyard and a commons buildiing. Project, named Tillamook Row, includes one, two and three bedroom units with covered bike parking and garbage/recycling as well as surface parking lot with seven parking spaces.
Riverplace Parcel 3 has been submitted for Type IIx Design Review by Ankrom Moisan Architects:
A 14-story and 6-story two-tower mixed-use structure with retail and amenity space on the first floor, approx 372 units and 180 garage parking spaces.
A project at 1331 NW 17th Ave has been submitted for Type III Design Review by GBD Architects:
Proposal is for development of 3/4 block mixed-use multi-family residential buildinig with ground floor parking and one floor of below-grade structured parking.
North18 at 1134 NW 18th Ave has been submitted for Type III Design Review by YBA Architects:
New 12-story mixed use building.
A project at 2212 SE Lambert St has been submitted for building permit review by EPR Design:
Construct new 3 story (5) unit apartment building with tucked under garages; associated site work
A project at 1428 SE 19th Ave has been submitted for building permit review by Allusa Architecture:
New construction of 3 story building with rooftop deck 13 residential units 8 (R2) 5407sf, 5(R1) 1703sf. 8 commercial unit 2(M) 510sf and 5(B) 770sf
A project at 7032 N Montana Ave has been submitted for building permit review:
Construct new 3 story six plex, no parking, detached trash enclosure less than 120sf in area, includes associated site work
A building permit was issued to Jivanjee Circosta Architecture for a project at 5885 SW Macadam Ave:
New construction of 4 story multifamily building with 31 units(building 1) and 3 story multifamily building with 33 units (building 2) connected with 3 fl skybridge.With onsite parking, site improvements and site amenities
A building permit was issued to Mackenzie for a project at 989 NE 61st Ave (formerly 6006 NE Holladay):
New 118,162 sf four story self storage building**with 15-280089-MT**