Weekly Roundup: Framework, Park Avenue West, Block 75 Phase II and more

The 12 story Framework building by Lever Architecture, planned for a site as NW 11th & Glisan in the Pearl

The 12 story Framework building by Lever Architecture, planned for a site at NW 10th & Glisan in the Pearl

In an article titled “Wooden Buildings as Strong as Steel” Newsweek wrote about how Portland is leading the nation in the adoption of Cross-Laminated Timber (CLT). The article includes quotes from Ben Kaiser of PATH, architect and developer of Carbon12and Thomas Robinson of Lever who is the architect for Framework in the Pearl and Albina Yard.

An article and photo gallery in the Portland Business Journal showed how CLT is made. Riddle-based D.R. Johnson Lumber Co is currently the only domestic lumber mill certified as capable of producing the wood panels.

The Portland Business Journal covered Block 75 Phase IIthe next high-rise building planned for the Burnside Bridgehead. The Works Partnership designed building is the latest partnership between Beam Development and Urban Development + Partners.

The Oregonian noted that a Travel Portland found that hotel prices have soared since 2010. The rising rates have led to a hotel construction boom, as Next Portland covered last year.

Construction is underway on the expansion of the SERA designed NW Portland International HostelIn a story about the project KGW wrote that the hostel is trying “to keep up with the booming tourism in the Rose City”.

The Portland City Council approved a realignment to the route of the proposed extension of SW Bond between the Tilikum Crossing and SW River Parkway. The extension, which will begin construction this year, allows OHSU projects including the Knight Cancer Research Building to move head.

The first residential tenants are moving into Park Avenue Westreported the Portland Business Journal. The TVA Architects designed building is now the fourth tallest building in Portland.

The Portland Development Commission is increasing its contribution to projects in Lents by $6.3 million, according to the Portland Business Journal. The projects include the Asian Health and Services Center by Holst Architecture, Oliver Station by Ankrom Moisan Architects and 9101 SE Foster Rd by Hacker Architects. The developers behind Oliver Station have gained control of the Chevron station at SE 92nd and Foster, enabling the project to occupy the full block.

Commissioner Steve Novick wrote about an idea that is rapidly gaining traction as a way to bring affordability back to Portland’s neighborhoods. “Missing middle housing” is new term for old styles of development, currently prohibited in most of Portland, at a density between that of single family detached houses and large mid-rise apartment buildings. These include housing types such as rowhomes, courtyard apartments, triplexes, built to the same height and scale as single-family homes.

A post at Portland Shoupistas asked if the PDC’s $26 million garage at the Convention Center Hotel  will be a money maker or a money loser. Though planned as  revenue generator, the post points out that “just to break even, this garage will need to generate more than $12 per space every day of every year for 20 years, starting in 2020.”

KOIN reported that “Ivy Island may not be ‘gateway’ to St. Johns for long“. A street vacation in the St Johns neighborhood was approved this week. The vacation will allow the mixed use Union at St Johns building by Jones Architecture to move ahead, while creating a safer road layout.

 

1510 NE Multnomah has third Design Advice hearing (images)

The Lloyd Cinemas redevelopment has gone before the Design Commission for a third Design Advice Request hearing. The project by Holst Architecture and 2.ink Studio massing has evolved since it was presented to the Commission in October, and is now imagined as a series of volumes that “weave together to form a village character”. The project continues to include a diagonal multimodal path through the site, connecting the Sullivan’s Gulch neighborhood to the Lloyd Center / NE 11th Ave MAX stop. At the ground level the project will have active uses, including restaurants, retail, maker space, micro restaurant and residential amenity spaces. Residential units will be located in the five floors above the ground. Though the current drawings do not list the number of units planned, the previous iteration proposed 680 residential units and 650 parking spaces in the first phase.

1510 NE Multnomah

Read More

Metro Reports: Canopy by Hilton, Lloyd Center remodel and more

The Canopy Hotel by Hilton, due to be reviewed by the Design Commission on November 19th

The Canopy Hotel by Hilton, due to be reviewed by the Design Commission on November 19th

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Ankrom Moisan Architects have requested Early Assistance for a building at 2869 NE Sandy Blvd:

Proposal is for a six story apartment bldg with underground parking garage (60 spaces.)

Holst Architecture have requested Early Assistance for the Asian Health and Services Center at 9005 SE Foster Rd:

New 3 story office building with community gathering spaces and on grade parking.

Early Assistance has been requested for a project at 9525 N Lombard St:

New 2-story apartment building with 7 dwelling units.

A demolition permit was issued for a building at 425 NW 9th Ave, set to be replaced by the Canopy by Hilton:

Demolish single story warehouse building

Lenity Architecture have submitted a project at 7805 SE 13th Ave for building permit review:

Construct new 4 story mixed use apartment building; main level to include 3 tenant spaces, parking garage, trash room area, and lobby area; floors 2-4 to include 30 units

A building permit was issued to Waterleaf Architecture for portions of the Lloyd Center Remodel:

Interior renovation for Lloyd Mall includes: reconfigure the ice rink and center concourse, reconfigure food court, remove selected interior pedestrian bridges, replace mall concourse flooring and upgrade and replace mall lighting. no exterior work under this permit

Correction: an earlier version of this post listed the address for the Canopy Hotel as 425 NW Glisan. The correct address is 425 NW 9th Ave.

Weekly Roundup: Lents Town Center projects, 4926 SE Division, Veteran’s Memorial Coliseum and more

Asian Health and Service Center

The Asian Health and Services Center on parcel #4 of Lents Town Center

The Portland Business Journal took a first look at three projects in Lents Town Center, including Oliver Station by Anrkom Moisan Architects, the Asian Health and Services Center by Holst Architecture and 9101 SE Foster Rd by Hacker Architects.

With all three buildings at Hassalo on Eighth now open, the Portland Business Journal published a photo gallery of the completed project.

The Portland City Council voted to spend $67 million more in Urban Renewal money on affordable housing, wrote the Portland Mercury. Also approved by the Council was a resolution instructing the Portland Housing Bureau to perform a nexus study on whether Portland should introduce a “linkage fee” on new residential and commercial developments.

During the hearing on housing affordability, Commissioner Steve Novick proposed an amendment to demolish Veteran’s Memorial Coliseum, and redevelop the site for housing. None of the other four City Commissioners supported the proposal.

Portland Architecture argued that in deciding to renovate the Portland Building the City Council chose to do the right thing.

The Portland Chronicle looked at a site at 4926 SE Division St where Urban Development Group is planning its next mixed use development.

A grand opening was held for the new Oregon Reproductive Medicine facility at 808 SW 15th Ave in Goose Hollow.

1440 Hoyt to add 4 stories to former Premier Press building (images)

The Design Commission has approved 1440 Hoyt, a major expansion and remodel of the former Premier Press building in the Pearl District. The project by Holst Architecture for Meriwether Partners will add four floors of heavy timber framed office space to an existing two story warehouse building, and convert an existing single story building to an office or retail use. The adaptive reuse project will create 75,000 sq ft of Class A office space and offer 125 bike parking spaces. Roof decks at the 2nd and 6th levels will be provided for the use of office tenants.

1440 Hoyt

Read More

Metro Reports: Broadstone Pearl, Faubion Elementary, Hallock & McMillen Building and more

Broadstone Pearl - 1400 NW Raleigh

Broadstone Pearl, as presented during Design Advice

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

TVA Architects have requested Early Assistance for a project at 442 NE Jessup St:

New 4-story V-A Multi family apartment w/13 units (studio and 1&2 bedroom mix). Landscape ROW improvements are included, including sidewalk improvement, where required. No parking provided.

TVA Architects have requested Early Assistance for a project at 4119 NE M L King Blvd:

New 4-story V-A Multi family apartment w/13 units (studio and 1&2 bedroom mix). Landscape ROW improvements are included, including sidewalk improvement, where required. No parking provided.

Studio 3 Architecture have requested Early Assistance for a project at 7924 SE Milwaukie Ave:

Add one building with four apartments behind existing house.

Iselin Architects have requested Early Assistance for a project at 8705 SE 13th Ave:

Demo existing industrial building and construct a new 4 story building with approx 6k sq of retail space at main level and 3 stories of apartments (24 units) above.

Holst Architecture have scheduled a Pre-Application Conference to discuss 1510 NE Multnomah:

Proposal is for multiple building mixed used development w/underground parking, private streets and pedestrian access corridors.

Ankrom Moisan Architects have scheduled a Pre-Application Conference to discuss Riverplace Parcel 3:

Proposal is for two towers on single site with a single level of parking below grade (173 spaces). One tower will be 6 stories with retail and grocery space at ground level and 5 levels of apartments (162 units.) second tower will be 12 stories with retail, residential amenities and parking for grocery (65 spaces) and ten stories of affordable apartments above for 204 units.

Encore Architects and Merryman Barnes Architects have submitted the Broadstone Pearl at 1400 NW Raleigh for Design Review:

6-story, 146-unit residential project with a small ground-level retail space, 73 parking spaces and 231 bike parking spaces. Also an Adjustment to loading and driveway locations.

LRS Architects have submitted a project at 1139 SW Morrison St for Design Review:

Type III Design Review for a new 6-story office building – 58,862 square feet. The project will include ground-floor retail and approx. 12-18 below-grade parking spaces.

Emerick Architects have submitted the renovation of the Hallock & McMillen Building for Historic Resource Review:

Full restoration & renovation or Historic 1857 Halloc & McMillen Building.

Boora Architects have submitted the Faubion Elementary School Rebuild for building permit review:

New three story, 133,000 sf pre kindergarten through 8th grade school with spaces for Concordia University college of education classrooms, offices, and community service partner organizations

A building permit is under review for the Holiday Inn Express at Cascade Station:

New 4 story, 107 room holiday inn express to include breakfast area, laundry room, fitness room, check-in/lifestyle lounge, covered patio, pool with patio and bike parking w/associated parking, utilities and landscaping. 189 sq foot detached trash enclosure

A building permit has been issued to EPR Design for a project at 12221 SE Kelly St:

Construct new 2 story, 41 room care facility (42 total beds) with elevator; main floor includes lobby, laundry room, kitchen, dining hall, activity room, offices and resident rooms; 2nd floor includes laundry room, acitivies room, salon and resident rooms, parking, bike parking and stormwater facilities included, detached covered trash enclosure is 120sf (exempt)

Design Advice offered for Lloyd Cinemas redevelopment (images)

Design Advice has been offered to Holst Architecture and 2.ink Studio for their planned redevelopment of the Regal Cinemas Lloyd Center 10 site. The project on a nearly 6 block site will include 980 residential units in three buildings, with 41,260 sq ft of retail space and 13,950 sq ft of community space. Parking for 873 vehicles is proposed.

1510_ne_multnomah_dar1_img_01

Read More

Metro Reports: 15 story tower proposed at 514 SE Belmont, permit issued for Hawthorne 31, and more

11th_ankeny_preapp_img_01

11th & Ankeny apartments

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Urban Development Group have requested Design Advice for their project at 11th & Ankeny:

Design Advice Request for a new mixed-use building – 2191 sq ft retail; 84 residential units; 6081 sq ft of below ground parking (23 parking spaces total).

Early Assistance has been requested for a project at 7246 N Mohawk Ave:

17-18 unit multi family building with on-site storm handling. Transfer of density from neighboring site at 7922 N Ivanhoe. One house to remain on 7922 N Ivanhoe.

A Pre-Application Conference has been scheduled by Vallaster Corl Architects to discuss a project at 514 SE Belmont St:

Pre-App. Conference to discuss a Type III Historic Resource Review for a new 15-story mixed-use building with ground level retail, parking (approx. 90 spaces) on the 2nd and 3rd floors and 193 residential units on the upper floors.

A Pre-Permit Zoning Plan Check has been requested for a building at 3423 SE Hawthorne Blvd:

New four story 24 unit apartment building

Holst Architecture have submitted 510 NW 15th Ave for Design Review:

Renovation of 2 existing buildings to include seismic upgrades, 4 levels on the west building for creative office space

A demolition permit was issued to Works Partnership, which will enable a townhome development at 5711 E Burnside St to move ahead:

Demolish existing one story commercial building, 896 sf, requirement of final plat permit 15-108229FP, remove all debris

A pair of building permits were issued to FFA Architecture for the Tess O’ Brien apartments:

6 story 5/1, 74 apts

6 story 5/1, 52 apts

A building permit was issued for an apartment building at 4937 SE Division St by SERA Architects:

New 134 unit apartment building with retail at ground level and tuck under parking.

A building permit was issued to TVA Architects for the Hawthorne 31 Apartments at 1515 SE 31st Ave:

New 4-story mixed use building with ground floor retail and 30 apartment units in floors 2-4.

A building permit was issued for a new building at 6030 SE 52nd Ave:

New 2 story commercial building; shell only; with associated site work. No occupancy under this permit, separate ti permits required for occupancy. Sprinkler/alarm required.

Wonderwall: Gallagher Plaza’s new facade (images)

Work has begun on a major remodel of Gallagher Plaza, an apartment complex in Northwest Portland run by Home Forward. Work on the existing building includes replacing the entire exterior cladding, replacing the windows, adding new structural shear walls, replacing the mechanical equipment, adding bike parking and adding new landscaping around the building. The architects for the project are Holst Architecture.

gallagher_plaza_img_01

Read More

Under construction: LL Hawkins and Slabtown Marketplace (images)

Thank you to our contributor Kurt Sevits for writing this post.

Construction is underway on the LL Hawkins Apartments and Slabtown Marketplace, the first major development of the Conway Master Plan, which aims to redevelop several blocks in NW Portland. Plans for Block 296 include renovating an existing warehouse that will become a New Seasons grocery store and constructing a new 6-story mixed-use building that will house retail and apartments. Cairn Pacific and Capstone Partners are developing the project, with design work by Holst Architecture and GBD Architects.

LL Hawkins and Slabtown Marketplace

Read More