Metro Reports: Baldwin Affordable Housing, Press Blocks, Koz on N Killingsworth 2, and more

The Baldwin Affordable Housing project is being developed by Home Forward in collaboration with the Urban League of Portland, and will comprise of 60 units of affordable permanent supportive housing. The project will be specifically targeted to serve residents from the Kenton community who are most in need.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers June 1st, 2020 to June 7th, 2020.

Early Assistance has been requested by Studio 3 Architecture for a project at 4738 SE Belmont St:

New 3-Story, mixed-use structure. 19 apartment units are proposed. The ground floor will contain 1,150 sf of commercial lease space along Belmont St. The project total square footage is 11,473. A drywell on the south end of the site will serve to dispose of stormwater. They plan to meet community design standards.

Early Assistance has been requested by Marathon Acquisition And Development for a project at 2202 E Burnside St:

New 5-story, mixed-use building. Approximately 114 units, 115,800 SF. Stormwater management is TBD. Proposal is expected to meet community design standards, however, applicant would like update/info about DOZA implementation.

Early Assistance has been requested by SERA Architects and Home Forward for The Baldwin Affordable Housing at 7688 N Interstate Ave:

Develop a 4-story low-income apartment building with ground floor permanent supportive service offices, community room, and courtyards. Stormwater disposal method is pending results from geotech report.

A Pre-Application Conference has been scheduled by Barghausen Consulting Engineers to discuss a project at 1525 SE Grand Ave:

A Pre-Application Conference to discuss construction of a 12,450 square foot retail building (CVS Pharmacy). A drvie through window and a surface parking lot for 30 vehicles is proposed. There are curb cuts on both SE M L King and SE Grand for the parking lot and the drive-through. The drive-through exits onto SE Clay Street. An Early Assistance meeting was held in 2019 to discuss this project (19-238518)

A project at 1675 NE 41st Ave has been submitted for building permit review by Doug Circosta Architect:

PDOX PS – new 5 story 17 unit apartment building with associated site work; site work to include common area and detached trash enclosure < 120 sf ***mechanical permit to be separate***

The Large Division Apartments at 11518 SE Division St has been submitted for building permit review:

LARGE DIVISION – New 4-story building with 138 affordable housing units, support services, and surface parking; includes associated site work *** w/20-145394-CO, 20-145396-CO, and 20-145399-MT ***

The Kōz on N Killingsworth 2 at 1430 N Killingsworth St has been submitted for building permit review:

New 6 story, 154 unit apartment building with ground floor retail and associated site work. W/20-146522-MT

A foundation only permit for the Press Blocks Full Block has been submitted for building permit review:

Building Foundation Only for new 24 story multi-family tower & 4 story plaza office building

A building permit was issued to LRS Architects for an addition to the Gateway Baptist Church at 13300 NE San Rafael St:

Two story addition to west side of existing worship hall. Includes demo of stair, lobby, restrooms, exterior ramp on west side and siteworks to add new elevator, accessible restrooms and stair and siteworks.

Metro Reports: Harbor Sky Lots 2 & 5, U-Store Pearl, Gateway Baptist Church, and more

The U-Store Pearl, as presented to the Design Commission at its second Design Advice Request hearing, held in September

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 30th to November 5th, 2017.

An addition to the Gateway Baptist Church at 13300 NE San Rafael St has been submitted for a Type II Conditional Use Review by Myhre Group Architects:

Addtion to a church. 2,717 square feet of floor area will be added to the existing 6,814 square foot main church building .The number of parking spaces will be reduced from 171 to 156. The size of the church sanctuary will not be increased and can accomodate 200 people. The fellowhship hall and day care buildings are not expanding.

The U-Store Pearl has been submitted for Type III Design Review by MCA Architects:

New six story storage facility in Pearl District.

The Moxy Hotel at 539 SW 10th Ave has been submitted for Type III Design Review by DLR Group:

Constructon of a new 11-story “lifestyle” hotel, with approximately 175 guest rooms. A loading space is proposed that enters from SW Alder. A drop-off area for hotel guests is proposed on SW Alder. Modifications requested for # of loading berths, bicycle parking requirement, and last mod “TBD”.

A project at 6640 NE Martin Luther King Jr Blvd has been submitted for building permit review by CIDA Architects:

New 4 story mixed use building, 18 apartment units, ground floor shell tenant space, interior trash enclosure. Associated site work. Mechanical permit separate.

A project at 3212 SE Division St has been submitted for building permit review by Quilici Architecture & Design Inc:

New 4-story w/basement, 32 unit apartment building, includes associated site work.***separate mechanical & fire alarm / fire sprinklers***

A project at 6449 SE 128th Ave has been submitted for building permit review by Scott Edwards Architecture:

New 3 story 15 unit apartment bldg., main floor with office laundry facility, trash recepticals, unisex bathroom, 6 units on the 2nd and 3rd floors to include 2-1 bedrooms and 4-studio’s – see 17-264949-mt **** electrical, plumbing separately

A project at 1602 SE Tacoma St has been submitted for building permit review:

New 3 story, 12 unit apartment building with attached trash enclosure, includes associated sitework *** w/ 17-264915-mt ***

A building permit was issued to Fosler Portland Architecture for a project at 1525 N Webster St:

New 3 story apartment building with 19 units with associated site work

A building permit was issued to Leeb Architecture for Harbor Sky Lots 2 & 5 at 1055 N Anchor Way:

New 266 unit apartment building with live-work units, parking and leasing office. 5 story Type IIIB residential building over one story Type IA podium.

A building permit was issued for a project at 5419 SE Woodstock Blvd:

New 3 story 38 unit apartment building; interior trash enclosure; associated site work

 

Metro Reports: Block 45, 2260 NW Front, Gateway Baptist Church, and more

Lever Architecture’s Block 45 has been submitted for building permit review

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Courtney + Le Architects for a project at 520 SE 82nd Ave:

Current code – The project entails demolishing the existing 14,243 sf building & constructing a 20,053 sf market. Stormwater disposal will be dispersed to the adjacent landscape planters/bio filters.

Early Assistance has been requested by Allusa Architecture for a project at 1823 NE 2nd Ave:

Current code – Construction of a two story 8 unit apartment building. Stormwater to be diverted to an onsite drywell. Trash and long term bike parking is located along the east portion of the property.

Early Assistance has been requested for a project at 2260 NW Front Ave:

He would like info on both current code and future code.

Please note that this “site” is for the pier which is approx 375′ NE from the parcel this case is “built” on (the parking lot parcel: R540254).Convert existing pier (formally part of “Terminal 1”) into a terminal for river-related activities: floating hotel, watersports, seaplane terminal, spa, park, farmers’ market, and/or other amenities beneficial to adjacent condos and apartment buildings. Parking provided by adjacent parking lot, accessed by greenway trail. They propose to bring in a floating vessel to use for above-proposed activities. (Central City Design District. Central City – River – North Pearl Plan District, Guild’s Lake Industrial Sanctuary).

A Pre-Application Conference has been scheduled by Osterman Design to discuss a project West of 2247 NW Kearney St:

Develop multi-family apartments – 18 units planned. Two car garage. Site is a non-contributing structure in Alphabet Historic District.

A Pre-Application Conference has been scheduled by Myhre Group Architects to discuss an addition to Gateway Baptist Church at 13300 NE San Rafael St:

A Pre-Application Conference to discuss an addtion to a church. 2,862 square feet of floor area will be added to the existing 6,814 square foot main church building .The number of parking spaces will be reduced from 171 to 168. The size of the church sanctuary will not be increased and can accomodate 200 people. The fellowhship hall and day care buildings are not expanding.

A Pre-Application Conference has been scheduled to discuss a project at NE 133rd & Burnside St:

Current code – Looking to create a Net Zero neighborhood community with 37 to 40 units that will have a mix of detached and attached units. Connected greenspaces will be thoughtfuly provided for children to play and community gardens for neighborly connections. Two plans submitted and plans include the following assumptions water, storm, and sanitary sewer connections.

A Pre-Application Conference has been scheduled to discuss a project at 2855 SW Patton Rd:

Review is for 2018 code changes. Remove the grocery-only condition and redevelop the site with an economically viable use that is compatible with the neighborhood (CM1 zone).

A building permit is under review for a project at NW 24th & Raleigh:

New 3 story apartment building with below grade parking.

A building permit is under review for Block 45 at 1034 NE Grand Ave:

New 12-story mixed use building; 240 apartment units with ground floor retail; basement for bike parking

A building permit was issued to Deca, Inc for a project at 1714 NE 45th Ave:

New 3 story apartment building with basement (8 units) and associated site work; includes retaining wall; trash room inside