Metro Reports: Tillamook Row, Riverplace Parcel 3, North18, and more

 

Riverplace Parcel 3

Riverplace Parcel 3, as presented to the Design Commission during the Design Advice phase in April

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Doug Circosta Architect for a project at 4775 N Lombard St:

26 new apartment units.

Early Assistance has been requested for a project at 5419 SE Woodstock Blvd:

2 New, 2-story multi-family building.

Early Assistance has been requested by Hacker Architects for a project at 3325 SE Division St:

Demo existing structure and build a new 26,000 sq ft multi-family building.

Early Assistance has been requested for a project at 3035 SE 92nd Ave:

Proposal is to build a 30 unit apartment building. Existing residence will be demolished.

A Pre-Application Conference has been scheduled by MCA Architects to discuss a project at NW 13th & Quimby St:

Pre-application conference to discuss new 5-story self storage facility.

A Pre-Application Conference has been scheduled to discuss a project at 2537 SE 13th Ave:

Request to change zoning from R2 to R1, to accommodate a 4-unit condo project.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 3714 SW Macadam Ave:

Pre-application conference to discuss Block 40 South Waterfront – single block mixed use development divided into 2 parcels.

A project at 12315 SE Division St has been submitted for Type II Design Review by AAI Engineering:

Proposal is for a 112 sf of self-storage facility with associated parking, utilities and landscaping.

A project at 20 NE Tillamook St has been submitted for Type II Design Review by Green Hammer:

Proposal is for a net zero energy 16-unit apartment complex developed in four buildings organized around a central courtyard and a commons buildiing. Project, named Tillamook Row, includes one, two and three bedroom units with covered bike parking and garbage/recycling as well as surface parking lot with seven parking spaces.

Riverplace Parcel 3 has been submitted for Type IIx Design Review by Ankrom Moisan Architects:

A 14-story and 6-story two-tower mixed-use structure with retail and amenity space on the first floor, approx 372 units and 180 garage parking spaces.

A project at 1331 NW 17th Ave has been submitted for Type III Design Review by GBD Architects:

Proposal is for development of 3/4 block mixed-use multi-family residential buildinig with ground floor parking and one floor of below-grade structured parking.

North18 at 1134 NW 18th Ave has been submitted for Type III Design Review by YBA Architects:

New 12-story mixed use building.

A project at 2212 SE Lambert St has been submitted for building permit review by EPR Design:

Construct new 3 story (5) unit apartment building with tucked under garages; associated site work

A project at 1428 SE 19th Ave has been submitted for building permit review by Allusa Architecture:

New construction of 3 story building with rooftop deck 13 residential units 8 (R2) 5407sf, 5(R1) 1703sf. 8 commercial unit 2(M) 510sf and 5(B) 770sf

A project at 7032 N Montana Ave has been submitted for building permit review:

Construct new 3 story six plex, no parking, detached trash enclosure less than 120sf in area, includes associated site work

A building permit was issued to Jivanjee Circosta Architecture for a project at 5885 SW Macadam Ave:

New construction of 4 story multifamily building with 31 units(building 1) and 3 story multifamily building with 33 units (building 2) connected with 3 fl skybridge.With onsite parking, site improvements and site amenities

A building permit was issued to Mackenzie for a project at 989 NE 61st Ave (formerly 6006 NE Holladay):

New 118,162 sf four story self storage building**with 15-280089-MT**

Metro Reports: Towne Storage, 177 SE 146th, 1206 SW 19th, and more

Towne Storage / Blake McFall Company Building

A building permit has been issued for the renovation of the Towne Storage / Blake McFall Company Building

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by BKL/A Architecture for a project at 2104 NE 13th Ave:

New 3 story apartment complex – approximately 11 units.

Early Assistance has been requested by Urban Development Group for a project at 1637 SE Nehalem St:

Proposal is for a new apartment building with 61 units and 17 parking spaces.

Early Assistance has been requested for a project at 7925 N Jersey St:

Proposal is for maximum density six unit condo project with amenity bonus option to get the six units.

Early Assistance has been requested by Urban Development Group for a project at 1335 SE Hawthorne Blvd: 

Proposal is for a new apartment building 39 units & 7 parking spaces.

Early Assistance has been requested by Doug Circosta Architect for a project at 14708 NE Glisan St:

New 46 unit apartment complex.

Early Assistance has been requested by Doug Circosta Architect for a project at 222 SE 143rd Ave:

Development of a new 56 unit apartment complex –

A Pre-Application Conference has been scheduled by GBD Architects to discuss a project at 1715 NW Couch St:

New residential development project with approx. 200 units in six stories with one level of below grade parking accommodating approx 103 stalls commercial and residential.

A Pre-Application Conference has been scheduled by C2K Architecture to discuss a project at 1206 SW 19th Ave:

Construction of a new 15 story mixed use apartment building. 268 apt units with some ground floor commercial. Below grade parking approximately 150 spaces.

A Pre-Application Conference has been scheduled by Magellan Architects to discuss a project at 14601 SE Division St:

Proposal is for a new self-storage building that is multilevel and approximately 85,000 sf.

A Pre-Application Conference has been scheduled by TVA Architects to discuss a project at 1650 NW Naito Parkway:

New 17 story mixed use apartment building, 292 living units, first floor retail and parking, underground parking approximately 189 spaces. . Property to be divided prior to development.

A Pre-Application Conference has been scheduled to discuss a project at 2014 SE 11th Ave:

New 4 story 34 unit apartment building with 2000 SF of ground floor retail.

A project at 7180 N Leavitt Ave (previously 8432 N Syracuse St) has been submitted for building permit review by Studio 3 Architecture:

Construction of new 3 story multifamily apartment structure, surface parking, detached trash enclosure less than 120 sf, includes associated site work

An excavation and shoring permit has been submitted for the Modera Davis at 205 NW 10th Ave:

partial – excavation, shoring, concreate structure and structural embeds from two levels below grade to L13 (roof) also includes all utility connections and routing of utilities below the P2 slab (basement). and all plumbing installation to L13. includes grease interceptor

A building permit was issued to LRS Architects for the renovation of the Towne Storage Building at 17 SE 3rd Ave:

Renovation of existing historic Town Storage building with a new roof top 6th floor addition

Building permits were issued to Doug Circosta Architect for a project at 177 SE 146th Ave (previously 201 SE 146th Ave):

Construct new 3 story (24 unit) apartment building with associated site work; new play area, sports field area, and parking lot building 1 of 6, building 100

Construct new 2 story (2 unit) apartment building with common area on main floor and laundry roombuilding 2 of 6, building 200

Construct new 3 story (11 unit) apartment building with trash room on main floor3 of 6 building, building 300

Construct new 3 story (24 unit) apartment building; 4 of 6 building, building 400

Construct new 3 story (12 unit) apartment building 5 of 6 building, building 500

Construct new 3 story (19 unit) apartment building with storage area on main floor6 of 6 building, building 600

A building permit was issued to Hacker architects for 9101 Foster:

4 story mixed use development with ground floor retail and 3 floors of apartments

Metro Reports: 1638 W Burnside, 7337 SE Foster, Grant Warehouse, and more

The Grant Warehouse redevelopment, which is intended to be affordable to households earning at or below 60% of the Area Median Income

The Grant Warehouse redevelopment at 3368 NE Martin Luther King Jr Blvd, which is intended to be affordable to households earning at or below 60% of the Area Median Income

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Ankrom Moisan Architects have requested Early Assistance for a project at 25 NE 122nd Ave:

Proposal is for a mixed use project including a commercial clinic and 176 residential apartments. The apartments will consist of a mix of transitional housing studios and single room occupancy units and will provide housing opportunities for medically fragile clients. Parking will be below grade for approx. 75 spaces. Ground floor and level two to contain the clinic program.

Doug Circosta Architect has requested Early Assistance for a project at 6847 N Interstate Ave:

Proposal is for a new four story 51 unit apartment building with on site parking and related site amenities.

Ankrom Moisan Architects have scheduled a Pre-Application Conference to discuss a project at 1638 W Burnside St:

Demo existing 2 story auto dealership to develop a 7-8 story mixed use apartment building with commercial on the first floor. With 94 below grade parking spaces.

NW Civil Design have requested a Public Works Inquiry for a project at 7337 SE Foster Rd:

New dental building with parking.

Carleton Hart Architecture have submitted the Grant Warehouse Redevelopment at 3368 NE Martin Luther King Jr Blvd for Type II Design Review:

Proposal is for new five story 87,900 sf mixed-use development with 80 affordable apartments and 6,000 sf of neighborhood oriented commercial use. Modification proposed for site development standard 33.266.220.C.3.B for bicycle parking.

Leeb Architects have submitted a project at 909 SE 12th Ave for Type III Design Review:

Request for approval of a Type III design review to allow construction of a development of a seven story mixed use building with three modificatons to review. Section 33.266.130F parking layout; section 33.266.220.C3 size of bicycle rack; section 33.266.310.D loading space vertical clearance.

Metro Reports: 10 stories in Goose Hollow, 17 stories in Buckman, 16 stories in the Pearl, and more

Carbon12

A foundation permit was issued for Carbon12, which will be the first Cross Laminated Timber building in the USA to reach 8 stories.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Early Assistance has been requested by Urban Development Group for a project at 2548 SE Ankeny St:

New development 77 units with 26 below grade parking spaces

Early Assistance has been requested by Edge Development for a project at 634 SE Spokane St:

New 3 story res building- 12 units. The applicant’s intention is to meet community design standards.

A Pre-Application Conference has been scheduled by Gerding Edlen Development for a project at 5 SE Martin Luther King Jr Blvd:

Pre-Application Conference to discuss a Type III Design Review and possible Type III Central City Parking Review for a new 17-story mixed use building with ground-floor retail and approximately 100,000 square feet of Office floor area and approx. 200,000 square feet of Residential floor area (estimated 220 units). Below-grade parking will be provided, with approx. 180 spaces that will serve both the residential and office uses.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a revised proposal for 505 NW 14th Ave:

280 unit 16 story building with market rate apartments and ground floor retail. Basement parking is included.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 1500 SW Taylor St: 

10-story mixed-use apartments including approximately 150 residential units and two levels of below grade parking.

A project at 2869 NE Sandy Blvd has been submitted for Design Review by Ankrom Moisan Architects:

206 unit, 6-story apartment building with basement parking and partial retail on the first floor.

1430 NW Glisan St has been submitted for Design Review by Ankrom Moisan Architects:

Proposal is for a 16 story high rise residential project.

Two buildings at 5833 SW Macadam Ave have been submitted for building permit review by Jivanjee Circosta Architecture:

New construction of 4 story multifamily building with 31 units with onsite parking, site improvements and site amenities

New construction of 3 story multifamily building with 33 units with onsite parking, site improvements and site amenities

Five buildings at 26 SE 146th Ave have been submitted for building permit review by Doug Circosta Architect:

Construct new 3 story (12) unit apartment building; with associated site work; building 1 of 5

Construct new 3 story (24) unit apartment building; building 2 of 5

Construct new 3 story (7) unit apartment building; building 3 of 5

Construct new 3 story (18) unit apartment building; building 4 of 5

Construct new 2 story (1) unit apartment building with laundry on main floor; building 5 of 5

A building permit is under review for a project at 2611 SW Water Ave:

New construction of 100-unit 5story apartment building, with site improvements, onsite parking and interior trash room

A foundation permit was issued to PATH Architecture for Carbon12:

Partial permit for utilities associated with excavation, shoring, and foundation at basement*****see comments re: review by state of oregon building codes division*****

A building permit was issued to Urban Development Group for a project at 2929 SE Stark St (previously 2913 SE Stark St):

Construct new 3 story (46 unit) apartment building with associated site work

Portland Housing Bureau announces Super NOFA projects (images)

The Block 45 development at 1010 NE Grand Ave will include 127 affordable units and 77 market rate units

The Block 45 development at 1010 NE Grand Ave will include 127 affordable units and 77 market rate units

The Portland Housing Bureau has revealed the projects selected as part of the $47 million Super NOFA (Notice of Funding Availability). The award is the largest in the agency’s history, and will help build six new developments with 585 new units of affordable housing, as well as preserve another 255 units through renovation. Included in this will be 120 units reserved for the lowest-income households, earning up to 30% of the Median Family Income ($15,400 a year for an individual and $24,300 for a family of four).

Read on below for information about the six new build projects selected.

Read More

Metro Reports: Pearl Block 20, 1510 NE Multnomah, Jefferson 14 and more

Jefferson 14 Apartments

Jefferson 14 Apartments

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

ZGF Architects have requested Design Advice for a project at 500 NE Multnomah St:

Replace existing garage with new parking structure at 500 NE Multnomah St.

Soderstrom Architects have requested Early Assistance for a project at St Thomas More Catholic School:

Rebuild existing school and parish hall. Provide for more and better on-site parking. In-ground tankage for stormwater.

LEEB Architects have scheduled a Pre-Application Conference to discuss a project at 1440 SW Taylor St:

Pre-application conference to discuss a 6-story, 81-unit, residentail apartment with lobby, trash area, bike storage and parking garage for 30 cars on ground floor.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 909 SE 12th Ave:

Pre-application conference to discuss a 148 unit, 6-story, market-rate apartment building with ground floor retail and basement parking.

A Pre-Application Conference has been scheduled to discuss a project at 6125 SE Division St:

New memory care facility building (14,000 sq ft) consisting of 18 private and 5 double units for a total of 28 beds/residents. Building to also include a dining area, courtyard, and support facilities. 42 structured parking spaces with at-grade entry.

Holst Architecture have submitted 1510 NE Multnomah for Design Review:

Type III Design Review and Central City Parking Review for a new multi-building, mixed-use development. The project will include housing and retail uses, underground parking, private streets and pedestrian corridors. The Design Commission has offered guidance in a DAR (EA 15-167229). And, earlier this year the applicant met with staff in an Early Assistance meeting (EA 15-189556).

Bora Architects have submitted Pearl Block 20 for Design Review:

Proposed high-rise condominium building with above-grade parking.

Soderstrom Architects have submitted a Conditional Use Master Plan Amendment for a project at 2145 NW Overton St:

For Conditional Use Master Plan Amendment to Allow Converting the Overton Warehouse to Parking.

Stack Architecture have submitted a project at 714 NE Alberta St for building permit review:

Addition to NW side of the building for new elevator shaft and trash enclosure; full interior remodel of 1st and second floor; remove interior walls and add new walls to create waiting area, exam rooms, offices, restrooms, meeting room, and worstations area; new landscaping and restriping of parking lot

Doug Circosta Architect has submitted a project at 201 SE 146th Ave for building permit review:

Construct new 3 story (24 unit) apartment building with associated site work; new play area, sports field area, and parking lot building 1 of 6, building 100

Construct new 2 story (2 unit) apartment building with common area on main floor and laundry roombuilding 2 of 6, building 200

Construct new 3 story (11 unit) apartment building with trash room on main floor3 of 6 building, building 300

Construct new 3 story (24 unit) apartment building; 4 of 6 building, building 400

Construct new 3 story (12 unit) apartment building 5 of 6 building, building 500

Construct new 3 story (19 unit) apartment building with storage area on main floor6 of 6 building, building 600

Valeant Architecture have submitted a project at 2720 SE Steele St for building permit review:

Construct new 3 story (7 unit) apartment building; with attached bike storage and trash enclosure; new parking lot

A building permit was issued to TVA Architects for the Jefferson 14 Apartments:

New 6 story apartment building, landscaping and site improvements

A building permit was issued to Works Partnership for the PDX Commons co-housing at 4262 SE Belmont St:

New 4 story 27 unit apartment building with shared amenities, ground level parking and one tenant space, stormwater facility and site improvements.

A building permit was issued to Green Gables Design & Restoration for a project at 1970 NW 18th Ave:

New construction of building to house 3 tenants, 2 story at center; main floor includes tenant spaces, 2 accessible restrooms and common area, 2nd floor is a part of tenant 1, overhead door at tenat 3 space; stormwater planter facility at exterior and pavers