Metro Reports: NW 23rd and Marshall, Zeal Lofts, 2251 SE 92nd, and more

A building permit is under review for the NW 23rd and Marshall Apartments, designed by GBD Architects. In May 2021 the Portland City Council upheld the Design Commission’s approval of the project, after an appeal by the Northwest District Association.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 27th, 2021 to October 3rd, 2021.

Early Assistance has been requested by Dominek Architecture for a project at 2251 SE 92nd Ave:

Develop new 2-story fourplex structure at the west end of existing lot. Maintain existing SFR. Stormwater is proposed to be handled by a medium-to-large drywell located on the NE portion of the site (pending appropriate infiltration rates verified by testing).

A project at 1220 N Hayden Meadows Dr has been submitted for building permit review:

PDOX PS – new grocery store and asscoaited site work. w/ 21-083397/400/402/405-CO and 21-083412-MT.

PDOX PS – new fuel station and canopy west of new store. w/ 21-083397/400/402/405-CO and 21-083412-MT.

PDOX PS – new fuel station and canopy east of new store. w/ 21-083397/400/402/405-CO and 21-083412-MT.

The NW 23rd and Marshall apartments at 1137 NW 23rd Ave have been submitted for building permit review:

NW 23RD & MARSHAL -FND-01 – Excavation, Shoring and Foundation for a new 5 story mixed-use apartment building; includes foundations up to and including ground level concrete structural slab.**NO MT or DEMO THIS SUBMITTAL – Demo of existing structures to be submitted separately**

A building permit was issued for the Zeal Lofts at 3155 N Williams Ave:

New 6 story mixed-use 205 group living unit, 10 full unit apartment building with 3-4 shell tenant spaces on ground floor and onsite below grade parking, includes associated sitework w/18-185085-MT

Metro Reports: UP River Campus, Riverplace Parcel 3, Zidell Block 8, and more

Riverplace Parcel 3

Building permits were issued for Riverplace Parcel 3, which will include 203 units of affordable housing and 177 units units of market rate housing

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers January 8th to January 14th, 2018.

Design Advice has been requested by Allied Works Architecture for a project at 2275 NW Glisan St (510 NW 23rd Ave):

Current Code: Construction of a new 4 story (6,755 square foot) mixed-use building. Five dwelling units on levels 2,3 and 4 are proposed with retail space on the ground floor. This is a contributing site in Alphabet Historic District.

Early Assistance has been requested by Dominek Architecture for a project at 3003 NE Alberta St [update 3/2/2018: this project is no longer active]:

Future code: The proposed project is a new + 18,559 sf 3-story addition to an existing 7,660 sf 1-story building on NE Alberta and 30th Ave. Both frontages appear to be improved. The proposed primary use is mixed use retail and restaurant on the ground flor and household living on the 2nd-4th floors (19 units). The existing ground floor building will be reuised as-is (with appropriate seismic and other upgrades).

Early Assistance has been requested by Works Progress Architecture for a project at 1935 N Killingsworth St:

Current code: Construction of new three story wood framed construction over 1 story mass timber mixed use building with the ground floor having 2 retail spaces and 9 tuck under parking stalls. There are 36 residential units with varying sizes. 8 of the residences will be affordable housing units. Two stairs access each floor, with one extending to the roof via roof hatch. Site will have below grade drywell connected to storm and 1 flow through planter to north.

Early Assistance has been requested by LRS Architects for a project at 11468 NE Holman St:

Current Code: Construct two new auto service facilities and one new car wash/detailing facility

Early Assistance has been requested for the University of Portland River Campus:

Current code – The University of Portland will be submitting an application for Greenway Review for proposed development on the University’s River Campus.

A Pre-Application Conference has been scheduled by CIDA Architects to discuss a project at 3220 SE 19th Ave:

New code doesn’t affect this site: Tenant improvement for new boulering gym. No proposed changes to the exterior of the shell, no proposed changes to impervious areas. This would be for a change of use – Type III Conditional Use land use review.

A Pre-Application Conference has been scheduled by GBD Architects to discuss Zidell Block 8:

Current Code: Proposed project will be a phased mixed use development containing two high rise residential towers and two levels of below-grade parking for a total area of approx. 798,000 SF. Each of the towers will include 250-300 units of multi-family housing subject to inclusionary housing requirements.

A project at 1475 SE 100th Ave has been submitted for Type II Conditional Use Master Plan amendment by CB|Two Architects:

Planned expansion to existing skilled nursing facility as part of the CUMP in 2011 (11-139546 CUMS AD) for the site. The proposed expansion will increase the existing 38,342 square foot skilled nursing facility with an approximate 8,500 square foot building addition, providiing 18 more beds to the facility.

The Providence Park Retail and Ticket Booth Addition has been submitted for Type II Design Review by John Weil Architecture:

Proposal is for Providence Park retail and Ticket Booth Addition. An addition of 1,300 SF of retail store in existing plaza area at corner of SW 20th and SW Morrison Streets and reconstruction of existing ticket windows to combine three locations into one 160 SF location.

Building permits were issued to Ankrom Moisan Architects for the Riverplace Parcel 3 development:

New 6 story 5 over 1 TYpe IIIA and Type I wood apartment over concrete podium structure with ground floor commercial and daylight basement parking – 2nd 6 story tower permitted under 17-156297-CO, includes all site utility pipingv

New 13 story Type I concrete high rise apartment building over concrete podium structure with daylight basement parking – 2nd 6 story tower permitted under 17-156305-CO

 

Metro Reports: New Market Theater, Block 75 Phase II, 1502 NW 19th and more

1502 NW 19th Ave

1502 NW 19th Ave

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Ankrom Moisan Architects have requested Design Advice for 1430 NW Glisan St:

Type III Design Review for the construction of a 270,000 sq. ft., 15-story residential tower, with approx. 250 units. 5,500 sf of ground floor Retail. A below-grade parking structure will provide 200 spaces. The applicant intends to transfer FAR potential from the 4,300 sq. ft. lot directly north of the site. Bonus FAR for the residential development will also be utilized.

Works Partnership have requested Design Advice for Block 75 Phase II:

Design Advice Request for a 19-story mixed use tower.

Dominek Architecture have requested Early Assistance for a project at 2423 SE 58th Ave:

Proposal is for new six unit apartment development, two buildings, on-site parking, amenity bonus for additional unit, new water and sewer connections.

Early Assistance has been requested for a project at 12045 N Parker Ave:

Construction of a new commercial retail restaurant with parking lot improvements.

Urban Development Group have requested Early Assistance for a project at 3701 SE Caruthers St:

New 4 story mixed use building, Approximately 2000 sq ft retail & 30 apartments.

A Pre-Application Conference has been scheduled to discuss a project at NW 13th & Glisan:

Pre-application conference for a new 6-story mixed use building.

SERA Architects have scheduled a Pre-Application discuss an addition to the New Market Theater at 50 SW 2nd Ave:

New 4 story mixed use creative office building addition to the New Market Theater Historic Building.

SERA Architects have submitted 1502 NW 19th Ave for Design Review:

New mixed-use building with 1 ground level retail space and stacked (mechanical) parking (50 spaces). The upper floors will contain 90 residential units. Six stories total.

A building permit is under review for a project at 1841 N Lombard St:

New 3 story – 18 unit apartment building – with associated site utilities and landscaping-attached trash enclosure

Metro Reports: 811 Stark, PSU Viking Pavilion, Redd on Salmon St and more

811 Stark by Works Partnership

811 Stark by Works Partnership

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Woofter Architecture have requested Design Advice and scheduled a Pre-Application Conference for the PSU Viking Pavilion:

Design Advice Request for modernization and upgrade to existing building.

Modernization and upgrade of existing structure.

Early Assistance has been requested for the redevelopment of a hotel at 7101 NE 82nd Ave:

Construct 99 guest rooms, 4-story on-site parking suites hotel with indoor pool on existing red lion hotel site.

SolTerra Architecture have requested early assistance for a project at 3138 N Vancouver Ave:

New development of 100 units of housing with 3,000-4,000 sq ft of ground floor commercial space. Provide 44 parking spaces at grade and in parking garage below grade. 6 stories & basement collecting and re-using stormwater onsite.

Jones Architecture have submitted a project at 8247 N Lombard St for Design Review:

New 4-story mixed use building with basement. 89 residential parking spaces and 77 in basement garage. 2 public plazas and a couryard for residential tenants.

Opsis Architecture have applied for a building permit for The Redd on Salmon St:

Major renovation of and addition to existing building. New 2nd floor addition and new 2nd floor mezzanines. New courtyard, repave and stripe parking lot. Seismic upgrade. Core and shell only, no occupancy this permit. See permit 15-207907-CO for detached service building ( for trash enclosure, bike parking, and transformers).

A demolition permit was issued to Works Partnership for the existing building at 811 Stark:

Demolish existing 2092 sf existing single story commercial building and parking lot, disconnect and cap utilities as required

Building permits were issued to Dominek Architecture for the O|8 Townhomes:

New 4 story apartment building with 4 units, associated site work. West building (building b), 1 of 2

New 4 story apartment building with 4 units. East building (building a), 2 of 2.

A demolition permit was issued for an existing building at 3423 SE Hawthorne Blvd:

Demolish 2 story apartment complex

A building permit was issued to Works Partnerships for the MODS Willamette:

Construct new 2 story, 6 unit modular apartment building, no parking, partial street improvement, scope of work includes basement, foundation, exterior cladding, porches at 1st and 2nd floor, parapets, roof assembly, associated site work such as stormwater facility, bike parking and landscaping, detached trash enclosure is 52sf; modular unit construction prior approval by state of oregon permit #M638 14-542OC

A building permit was issued to GBD Architects for the 19th & Overton apartments:

New 6 story, 58 unit apartment building; ground fl parking, bike parking, leasing office, residential lobby, building services and 3 residential loft units; floors 2-6 include residential units; amenity deck on the roof