The Design Commission has approved a new hotel at SW 10th & Alder. The 12 story hotel, designed by DLR Group for Graves Hospitality, will be operated as a Moxy Hotel, a new brand by Marriott International. The building will rise to a maximum height of 140′-4″, and will include 197 guest rooms. No vehicular parking is proposed.
Category Archives: DLR Group
Metro Reports: Harbor Sky Lots 2 & 5, U-Store Pearl, Gateway Baptist Church, and more
Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 30th to November 5th, 2017.
An addition to the Gateway Baptist Church at 13300 NE San Rafael St has been submitted for a Type II Conditional Use Review by Myhre Group Architects:
Addtion to a church. 2,717 square feet of floor area will be added to the existing 6,814 square foot main church building .The number of parking spaces will be reduced from 171 to 156. The size of the church sanctuary will not be increased and can accomodate 200 people. The fellowhship hall and day care buildings are not expanding.
The U-Store Pearl has been submitted for Type III Design Review by MCA Architects:
New six story storage facility in Pearl District.
The Moxy Hotel at 539 SW 10th Ave has been submitted for Type III Design Review by DLR Group:
Constructon of a new 11-story “lifestyle” hotel, with approximately 175 guest rooms. A loading space is proposed that enters from SW Alder. A drop-off area for hotel guests is proposed on SW Alder. Modifications requested for # of loading berths, bicycle parking requirement, and last mod “TBD”.
A project at 6640 NE Martin Luther King Jr Blvd has been submitted for building permit review by CIDA Architects:
New 4 story mixed use building, 18 apartment units, ground floor shell tenant space, interior trash enclosure. Associated site work. Mechanical permit separate.
A project at 3212 SE Division St has been submitted for building permit review by Quilici Architecture & Design Inc:
New 4-story w/basement, 32 unit apartment building, includes associated site work.***separate mechanical & fire alarm / fire sprinklers***
A project at 6449 SE 128th Ave has been submitted for building permit review by Scott Edwards Architecture:
New 3 story 15 unit apartment bldg., main floor with office laundry facility, trash recepticals, unisex bathroom, 6 units on the 2nd and 3rd floors to include 2-1 bedrooms and 4-studio’s – see 17-264949-mt **** electrical, plumbing separately
A project at 1602 SE Tacoma St has been submitted for building permit review:
New 3 story, 12 unit apartment building with attached trash enclosure, includes associated sitework *** w/ 17-264915-mt ***
A building permit was issued to Fosler Portland Architecture for a project at 1525 N Webster St:
New 3 story apartment building with 19 units with associated site work
A building permit was issued to Leeb Architecture for Harbor Sky Lots 2 & 5 at 1055 N Anchor Way:
New 266 unit apartment building with live-work units, parking and leasing office. 5 story Type IIIB residential building over one story Type IA podium.
A building permit was issued for a project at 5419 SE Woodstock Blvd:
New 3 story 38 unit apartment building; interior trash enclosure; associated site work
Moxy Hotel receives Design Advice (images)
A proposed hotel at SW 10th & Alder has gone before the Design Commission to receive Design Advice. The 11 story hotel, designed by DLR Group for Graves Hospitality, will be operated as a Moxy Hotel, a new brand by Marriott International. The building will rise to a maximum height of 136′, and will include 179 guest rooms. No vehicular parking is proposed.
Rebuild of Portland Building Approved (images)
The proposed rebuild of the Portland Building has been approved by the Landmarks Commission, with the decision upheld by the City Council at appeal. The almost $200 million reconstruction of the Michael Graves designed building is being led by DLR Group, and is intended to address seismic deficiencies and water intrusions issues that have been present since the building was completed.
Metro Reports: 3403 N Mississippi, NE 106th & Halsey, Neuberger Hall, and more
Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.
Design Advice has been requested by DLR Group for a project at 539 SW 10th Ave:
Construct a new hotel with approximately 177 rooms, 11 stories. (Central City, Downtown, West End Plan District – Central City Design District)
Early Assistance has been requested by Holst Architecture for a project at NE 106th & Halsey:
Proposal is for a six story building with 45 affordable housing units, 30 market rate apartments, tuck-under parking, 10,000SF of retail and 10,700SF of office space. Amenities to include community room and green roof deck.
A Pre-Application Conference has been scheduled by Mainland Northwest to discuss a project at West of 8524 N Crawford St:
Previous EA 15-219376. Proposal to change the zoning, consistent with the Comprehensive Plan Map designation, from EG1 (General Employment 1) and EG2 (General Employment 2) to EXd (Central Employment zone with the Design overlay zone). The applicant states the future development on this 15-acre site could include multi-dwelling residential, neighborhood retail, mixed office-manufacturing uses. The greenway trail will also be developed. This application does not include a specific development plan.
The PSU Neuberger Hall Renovation has been submitted for Type III Design Review by Hacker architects:
Renovation of PSU’s Neuberger Hall, which includes updates and modifications to accessibility, fire and life safety, upgrades to MEP systems, seismic strengthening, program adjustments and facade improvements. One modification requested to Ground Floor Windows (33.130.230, 33.510.220)
The renovations to the Meier & Frank Building have been submitted for Type III Design Review by Bora Architects:
Project is located at former Macy’s department store. Floors 1-5 and basement to be demolished and renovated as creative office space with ground level retail. New restrooms will be added to the office floors to accommodate future office tenant improvement. Basement amenity space including bike storage, fitness and conference space will be provided.Scope includes limited facade renovations to accommodate restored retail entries mid block on SW 5th and SW 6th and a new entry on SW 6th near Morrison. Each entry will include a new canopy. The SW Alder canopy will be reduced in depth per PBOT requirements. The historic facade and SW Morrison canopies will be preserved.
A building permit was issued to Holst Architecture for a project at 3403 N Mississippi Ave:
Excavation and Shoring
A building permit was issued for a project at 5025 N Minnesota Ave:
New 6 unit apartment building with associated site work
Metro Reports: 1430 NW Glisan, Asian Health & Services Center, 5 MLK, and more
Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.
Early Assistance has been requested by DLR Group for a project at 539 SW 10th Ave:
Construct a new hotel with approximately 177 rooms, 11 stories. (Central City, Downtown, West End Plan District – Central City Design District)
Early Assistance has been requested by Woodblock Architecture for a project at 1604 E Burnside St:
Demo existing building for development of a new 83 room Hostel with related spaces, a restaurant and coffee shop. No parking provided.
Early Assistance has been requested for a project at 1424 NE 33rd Ave:
Consolidation of 4 lots. Vacation of Halsey Street. Demo existing house. Construction of four 6-plexes (1,000 sq ft 2bed/2bath condos). Garages on 1st floor. No parking proposed. Affordable Housing. Modular construction. 24 total units.
A project at 3185 N Vancouver Ave has been submitted for Type III Conditional Use Review:
New 6-story mixed-use building consisting of 202 group living units, 8 apartment units, shared kitchens on each floor, 56 parking spaces, and 3 commerical tenant spaces on the ground floor.
A project at 177 N Failing St has been submitted for Type II Design Review:
New construction of a 44,700 SF building with 88 group living rooms provided in (16) dwelling units, (2) one bedroom and (2) two bedroom apartments in four floors of type VA construction above one floor of Type IA construction which will contain 6 live-work units, amenity spaces, parking and building utilities and one below grade level containing parking and building utilities.
A project at 1723 NW 24th Ave has been submitted for building permit review by Skylab Architecture:
Change of occupancy from B to M; create six separate tenant spaces and six mezzanines; new interior trash rooms; accessible bathrooms; new exterior doors and parking upgrades; seismic upgrade; new storefront window openings
A project at 7220 N Burlington Ave has been submitted for building permit review by Studio 3 Architecture:
New 3-story, 19-unit multifamily apartment structure***deferred submittals: pre-engineered wood floor joists, pre-engineered wood roof joists, built in landscape irrigation (design build)***
A project at 6515 SE 78th Ave has been submitted for building permit review by Mentrum Architecture:
New 2-story, 3-unit apartment building with 1 parking pad and associated site work, attached trash enclosure. No mechanical.
An excavation and shoring permit is under review for 5 MLK:
Excavation and Shoring for new 17 story building
A building permit was issued to Bora Architects for alterations to the Meier & Frank Building:
Interior alteration -demolition of interior partitions, finishes, and associated materials. Demolish dedicated MEP systems serving current Macy’s tenant space. All work will be coordinated to ensure cotinuous operation of hotel floors above
A building permit was issued for a project at 5016 N Maryland Ave:
New 3 story apartment building with a total of 12units, buildings g and k connected by a breezway, site improvements, drywell, detached trash enclosure less than 120 sq ft. ***nfpa 13 sprinkler system required***
The first building permit for 1430 NW Glisan was issued to Ankrom Moisan Architects:
STR 01 – structural permit up to the underside of level 2 for a 286,000 GSF mixed-use building with 4 levels below grade for parking. General retail on level 1. 230 residential units on levels 2-15. 200 below grade parking spaces, no mechanical install with this phase of work.
A building permit was issued to Holst Architecture for the Asian Health and Services Center at 9035 SE Foster Rd:
Construct new 3 story 30,140 sf office building with assembly space on level 3 and ground floor commercial lease space, includes onsite parking and associated site work
Metro Reports: Collective on 4th, Portland Building, 3612 SE 82nd, and more
Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.
Design Advice has been requested by SERA Architects for a project at 1715 NW Couch St:
New six story residential project with one level of below grade parking. Project will be 160,000 GSF above grade with 200 units. FAR is 4:1.
Design Advice has been requested by TVA Architects for a project at 1650 NW Naito Parkway:
new 17 story apartment building. 270 residential units are proposed. The first floor will have both residential and parking. There are 192 underground parking spaces. The access for the parking would be from NW Naito. One loading space is proposed. The property will be divided to create a 79,700 square foot site for this development.
Early Assistance has been requested by Urban Development Group to discuss changes to a project at 2548 SE Ankeny St:
Proposal for a new apartment building of 96 units to replace CO 16-198732, no parking.
Early Assistance has been requested by Urban Development Group to discuss changes to a project at 316 NE 28th Ave:
Proposal is to build a new apartment building to replace CO 16-196951 for 119 units and no parking.
Early Assistance has been requested by Urban Development Group to discuss changes to a project at 2789 NE Halsey St:
Proposal is for a new apartment building of 53 units no parking which would replace CO 16-178394.
Early Assistance has been requested for a project at 3612 SE 82nd Ave:
Project consists of an approx. 8500 SF, single story new core and shell building for up to nine restaurant tenants on property that was previously used as a restaurant. The existing unoccupied building may be demolished. Site work will consist of selective demolition, new infrastructure and parking lot repairs to 15 food carts, seating areas, and required parking.
The rebuild of the Portland Building has been submitted for Type III Historic Resource Review by DLR Group:
Full renovation of an existing 15-story office building including seismic upgrade and replacement of MEP systems. Proposed exterior renovation includes replacement of all existing facade finishes and glazing systems. New building cladding system will sit outboard of the existing building face. Two areas of the existing covered loggia on the first floor are being enclosed and added to the interior building area. No additional impervious surfaceor roof area is being added. This is a historic building.
An excavation and shoring permit was issued the Collective on 4th at 325 SW Harrison St:
partial – site clearing and demolitoin, tree removal, excavation, shoring and erosion control.