Early Assistance has been requested by Hennebery Eddy Architects for the New Industrial Revolution Center at 920 SE Stark St:
Proposal is for a ten story tall building with a total area of 312,000 sf, including 220,000 sf of lab space, 28,000 sf of accessory meeting space, 15,000 sf of industrial office, and up to 5,000 sf of retail on the ground floor. Approximately 100 parking stalls will be provided below the ground floor, accessed near the SW corner of 9th and Washington.
Early Assistance has been requested by Carleton Hart Architecture for a project at the northeast corner of NE 42nd & Going:
New construction multi-family affordable housing project on the corner of NE 42nd & Going St
A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at Conway Block 291E at the southwest corner of NW Raleigh & 20th:
6-story market-rate apartment building with 200 residential units and basement parking. Stormwater disposal will occur through drywells in the pedestrian way.
A Pre-Application Conference has been scheduled by Works Progress Architecture to discuss a project at 1835 N Flint Ave:
7-story multi-family building with tuck-under parking, open courtyard, active lobby/amenity and three townhouses at grade and 6 levels of residential above (117 units total). On site stormwater will be dealt with via dry wells.
The Adventist Medical Center at 1500 SE 96th Ave has been submitted for a Type III Design Review by Clark/Kjos Architects:
New four story medical office building.
The skybridge proposed as part of the Terwilliger Plaza Parkview Building at 2436 Southwest 6th Avenue has been submitted for a Type III Review:
Terwilliger Plaza submits this application for one encroachment in the public right-of-way over SW 6th Avenue. The skybridge is an integral element of Terwilliger Plaza’s expanding continuing care facility located on one contiguous site on both sides of SW 6th Avenue. The skybridge will span SW 6th, connecting the existing continuing care facilities on the west of SW 6th Avenue to the expanded facilities and units on the east side of SW 6th Avenue. The skybridge is a critical element of Terwilliger Plaza’s continuing care program.
A project at 5308 SE 18th Ave has been submitted for building permit review by Fosler Portland Architecture:
Construct new 3 story – 16 unit apartment building with attached trash enclosure on south side of building and associated site work to include storm water management
A building permit was issued to SERA Architects for Saltwood South at 2050 NW Raleigh St:
Saltwood South – new construction of 6 story, 177 residential unit apartment building (5 stories of Type IIIA over 1 story of Type 1 construction). There is one level of below grade parking. Ground floor consists of residential lobby, retail space, residential amenities, and dwelling units. The building occupies the full block and is configured around a south-facing private courtyard. Mechanical under 18-278466-MT
A building permit was issued for a project at 6580 N Greenwich Ave:
New 3 story, 12 unit apartment building with attached 138 S.F. Trash enclosure, includes associated sitework *** mechanical permit to be separate ***
A building permit was issued to Ankrom Moisan Architecture for the Hyatt Unbound at 245 SW Salmon St:
New 21 story hotel, 180,000 gross sq ftl with 250 guest rooms, ground floor retail, conference center, gym, groundfloor restaurant, bar/market, support spaces and rooftop restaurant and bar. Total project consists of 21 stories of Type 1 construction with one basement level. For reference set R2 6th floor