Metro Reports: 3rd & Salmon, Pearl Block 20, Seven Corners Community Collaborative and more

3rd & Taylor

The proposed hotel at SW 3rd & Taylor

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Boora Architects have requested Design Advice for Pearl Block 20:

Block 20 is a proposed hi-rise condominium building. One-hundred forty-two units are included in a five floor podium and 20 floor tower.No retail is proposed for this project. All parking is above grade and surrounded by units.

Allusa Architecture have requested Early Assistance for a project at 6805 SE 52nd Ave:

Build two new 3-story apartment buildings with no basement. One structure will be 18 units. The other structure will be 12 units.

Urban Development Group have requested Early Assistance for a project at 4917 SE Hawthorne Blvd:

New 46-unit mixed use apartment building with 2700 sq ft of commercial.

Early Assistance has been requested for a project at 700 SE Belmont St:

New self-storage facility. Existing structure(s) to be demo’d/removed.

Works Partnership have requested Early Assistance for a project at 224 SE 2nd Ave:

Proposed change of existing warehouse to office use with retail on ground floor. Also a proposed addition to the building of one story penthouse for residential occupancy. See EA 15-216040.

Studio 3 Architecture have submitted a project at 7924 SE Milwaukie Ave for Design Review:

See EA 15-242170 appt and CO 16-100215. New two story four unit apartment structure behind existing single family residence which will remain.

Ankrom Moisan Architects have submitted the hotel portion of the 3rd and Salmon development for Design Review:

Proposal for joint development of boutique hotel with 245 guest rooms and on site fitness center and conference center. Project will include ground floor and rooftop retail space. One modification needed for ground floor window and 1 adjustment needed for number of loading spaces.

Waterleaf Architecture have submitted the Seven Corners Community Collaborative for Historic Resource Review:

Proposed project is a four story commercial building consisting of one story of ground floor retail space and secured parking below three stories of office space.

Mentrum Architecture have submitted a project at 6205 N Minnesota Ave for building permit review:

Construct new 3 story (18 unit) apartment building with partial basement; attached trash enclosure and associated site work

A building permit was issued to Fosler Portland Architecture for a project at 7247 N Leavitt Ave:

New three story, 20 unit apartment complex; on site bike parking and trash enclosure; no onsite parking

A building permit was issued to HC Architecture for The Porter Hotel:

new 16-story, 299 guestroom hotel includes first floor full service restaurant, market cafe; second floor 5,000 sf meeting room with outdoor terrace; rooftop restaurant and covered terrace. One level below grade with shoring includes gym facilities, locker rooms, pool and back of house activities.

 

Weekly Roundup: 12th & Morrison office, Grant High Modernization, the Truman Apartments and more

1139 SW Morrison by Design Department and LRS Architects

1139 SW Morrison by Design Department and LRS Architects

The Portland Business Journal took a first look at the 6 story office building planned by Menashie Properties for a site at 1139 SW Morrison. The building is being designed by Design Department and LRS Architects.

Construction is underway on the PSU School of Business Administration.  The Daily Journal of Commerce published photos of the work underway.

The Oregonian published 5 takeaways from Portland’s plan for next 20 years of growth.

Portland Architecture interviewed the architects and developer behind the development at 3rd and Taylor, which threatens the Ancient Order of United Workmen Temple and the Hotel Albion.

The Oregonian reported on the new 20 story condo tower planned for Block 20 of the Hoyt Street Yards in the Pearl. The building would have 150 residential units and 190 parking spaces.

The James Beard Public Market is set to close on the deal to acquire the land at the west end of the Morrison Bridge, according to The Oregonian. The current schedule envisions the market opening to the public in 2020.

Design work has begun on the Grant High School Modernization, one of the projects funded as part of the $482 million bond passed in 2012. Grant Magazine published the first conceptual drawings of what the rebuilt school will look like.

The Portland Chronicle published images of The Truman apartments at SE 44th and Hawthorne. Construction on the 30 unit building is due to begin in early 2016.

Metro Reports: Hoyt Street Yards Block 20, Worldmark by Wyndham, Burnside Delta and more

Worldmark by Wyndham

The Worldmark by Wyndham, as presented to the Historic Landmarks Commission in January

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

The City of Portland has requested Design Advice for the renovation of the Portland Building:

Preservation and renovation of the Portland Building.

YBA Architects have requested Design Advice for a project at 1134 NW 18th Ave:

Proposal is for mixed use development with retail space on ground floor, a row of townhomes and at-grade double height car parking with stacking semi-automated parking system.

Early Assistance has been requested for a project at 2515 SE 41st Ave:

12 unit residential building, will need new sewer.

Tahran Architecture & Planning have requested Early Assistance for a project at 5325 NE Irving St:

Demolish home and build new attached condos (7 units total).

SERA Architects have requested Early Assistance related to the Worldmark by Wyndham at 221 SW Naito Parkway:

Early Assistance Meeting, as follow-up to Pre-Application Conference EA 14-2178.37 for a Type III Historic Resources Review for 6-story, 67,000 sqare foot, 70′ tall building for vacation ownership units.

Boora Architects have scheduled a Pre-Application Conference to discuss a project on Block 20 of the Hoyt Street Yards property in the Pearl:

Project proposal is for a high-rise condo building.

SERA Architects have applied for a Conditional Use Review and Design Review for a hotel at 619 SW 11th Ave:

Conditional Use Review for 15 story, 221 room hotel. See EA 15-210283 for information.

New construction of 15 floor hotel.

A Design Review application has been submitted for a project at 10506 E Burnside St:

50-unit mid rise apartment complex. Ground level tuck under parking and additional surface parking.

The Burnside Delta by Vallaster Corl Architects has been submitted for Design Review:

new 7-story building with some ground-level retail and a total of 85 residential units. The ground level will include 56 bicycle parking spaces and 18 vehicle parking spaces. 7 modifications outlined in application.

Jones Architecture have submitted a renovation of the Fisk Tire Company Building at 1236 NW Flanders St for Historic Resource Review:

Changes include a new loading dock, replacment of all existing window panels, new stroefront entrance doors, new roofing on existing entry canopy, new ada lift and new exterior lighting. Loading dock replacment and expansion will be in the ROW

LRS Architects have submitted a renovation of the Towne Storage Building at 17 SE 3rd Ave for Historic Resource Review:

Core/shell renovation to historic building for creative offices and retail

A building permit is under review for a project at 5606 N Greeley Ave:

New 2 story 4-plex, slightly sloped lot with associated site work

A building permit was issued to Design Department Architecture for the conversion of a building at 930 SE Sandy Blvd:

Change of occupancy from F-1 to A-2. Interior demolition and new walls to reduce existing kitchen and alter sales area to dining area, (2) ADA bathrooms. Exterior work: new parapet at west property line.

A building permit was issued to Fosler Portland Architecture for a project at  8510 N Ivanhoe:

New construction. Three story 20-unit apartment building. New 550sf gross bike and trash enclosure on west side of the lot