Metro Reports: apartments on SE Hawthorne, NE Multnomah, N Holman and more

2422 SE 9th by Solterra Systems

2422 SE 9th by Solterra Systems

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

TVA Architects have requested Early Assistance for a project at 1532 N Holman St:

Proposal is for a four-story multi-family apartment (18) units for studio, one & two bedroom mix.

TVA Architects have requested Early Assistance for a project at 3910 NE Garfield Ave:

Proposal is for a multi-family four story apartment with a mix of studio, one and two bedroom apartments.

TVA Architects have requested Early Assistance for a project at 1323 SE Lambert St:

Proposal is for a four-story multi-family apartment with studio and two bedroom mix.

Ankrom Moisan Architects have scheduled a Pre-Application Conference to discuss a project at 930 SW 3rd Ave:

Joint development of boutique hotel (19-21 stories) and creative office space including the Temple building with below grade parking 43-100 spaces.

THA Architecture have applied for a building permit for 2034 NE Multnomah:

8 story apartment building with parking

A building permit is under review for 3423 SE Hawthorne Blvd:

New five-story, 30-unit multi-family apartment complex; on site bike parking; no on-site parking; drywell, lanscaping and utilities, trash enclosure on adjacent lot

A building permit was issued to Solterra Systems for their new home at 2422 SE 9th Ave:

New 34,000 SF, 5 story building with B, S, F, and A occupancies; ground floor retail; interior bike parking; lower level parking; ecoroof and elevator

Metro Reports: St Francis Park Apartments, PSU School of Business Administration, 4th & Harrison and more

4th & Harrison

4th & Harrison, as presented at Design Advice

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Barry Smith Architect has requested Early Assistance for a project at 518 SE 76th Ave:

46 unit apartment building with 8 cars in parking garage; 4 floors

BAMA Architecture and Design have requested Early Assistance for a project at 10010 SE Ankeny St:

Lot line adjustment and phased development of multiple buildings to include multi-family, parking, industrial flex space.

Solterra have requested Early Assistance for a project at N Failing & Vancouver:

53-unit mixed use apartment building with active urban canyon

Works Partnership have requested Early Assistance for a project at 1400 NW 22nd Ave:

Proposal for major commercial alterations with exterior improvements. Uses will include office, retail and manufacturing.

Barry Smith Architect has requested Early Assistance for a project at 829 NW 19th Ave:

Move existing home on property to within 20 feet of NW 19th. Confirm and adjust lot lines for 2 lots. On Vacant lot develop a 50 unit, 6 story apartment building located within the Alphabet Historic District.

Mortenson Development have scheduled a Pre-Application Conference to discuss a new hotel at 619 SW 11th Ave:

demolish existing 1/4 block building and replace with a new construction 221 room, 15 floor hotel.

A Design Review has been submitted for a project at 1112 SE Lincoln St:

Construction of 2 tri-plex residential structures – one on each parcel

The St Francis Park Apartments by MWA Architects have been submitted for Design Review:

New 106-unit multi-dwelling residential development.

The 4th & Harrison apartment complex by Core Spaces has been submitted for Design Review:

Design Review for new 15-story glass and metal panel building – grocery store at ground level and 14 stories of luxury residential apartments, above. 1 modification requested to reduce landscape area; 1 modification requested to replace landscaping with hardscape; 1 modification requested for the width of the oriel window; 1 adjustment requested to parking access & loading; 1 adjustment requested for # of parking stalls.

ZGF Architects have submitted the Canopy Hotel for Design Review:

11 Story, 150 room Hotel

SRG Partnership have applied for building permits for the PSU School of Business Administration:

40,000 Sf multi-story addition, renovation of 52,000SF existing

Reroute on site utilities, demo on site portion of sky bridge, remove exerior cladding of existing building, interior demolition. ***40,000 SF multi-story addition, renovation of 52,000SF existing***

foundation and walls to grade of pavilion/atrium, cladding of existing building, ***40,000 SF multi-story addition, renovation of 52,000SF existing***

Demolition permits were issued for the existing buildings due to be replaced by the Pearl Hampton Inn & Suites:

Demo existing 2 story building

Demo two story building; no basement

Demo existing 3 story building with partial basement

A building permit was issued for the Kenton Mixed Use Phase III at 2111 N Willis Blvd:

New four story apartment building with courtyard and balcony at center, 37 units, 2 retail spaces on main floor, parking at east and north sides, detached trash enclosure, associated landscaping and stormwater facilities

A building permit was issued to Anrkom Moisan Architects for 2010 NW Pettygrove St:

new 5-story, 49 unit apartment with tucked under parking

14 story tower at NW 11th & Hoyt heading to Design Review

A Design Review has been scheduled for a 14 story tower planned by developer John Carroll for a site at NW 11th & Hoyt. The Ankrom Moisan designed building will include 102 apartments, with 1,500 sq ft of retail at the ground floor. Parking for 52 vehicles will be provided, most of it in a mechanized parking system. 155 bike parking spaces will be located in the basement. Exterior materials proposed include brick, pre-cast concrete, metal panel, and aluminum storefront and vinyl windows.

11th & Hoyt

Read More

Convention Center Hotel returns for Design Advice (images)

The project team behind the planned Hyatt Regency at the Oregon Convention Center have returned for a third Design Advice Request hearing in front of the Design Commission. The $212 million, 600-room Convention Center hotel is being developed by Minneapolis based Mortenson, with a design team that includes ESG ArchitectsAnkrom Moisan Architects and Mayer Reed Landscape Architecture. The hotel is in part being financed by $60 million of Metro issued bonds, which will be backed by lodging taxes paid by hotel guests.

Hyatt Hotel at the Oregon Convention Center

Read More

Restoration Hardware returns to Historic Landmarks Commission (images)

The proposed Restoration Hardware store on NW 23rd has returned for a second Design Advice hearing in front of the Historic Landmarks Commission. The proposed store by  Ankrom Moisan Architects would be modeled on the furniture store’s ‘Gallery’ concept, as used at the recently opened West Hollywood store. Furniture would be display in a series of linked rooms, as they might be in a house. A roof terrace will be used to display outdoor furniture.

NW 23rd Restoration Hardware

Read More

9th & Belmont Apartments (images)

A Design Review hearing has been held for the 9th & Belmont Apartments, a 6 story building by Ankrom Moisan Architects and Foresight Development & Real Estate. The proposed building would have 105 units, split between 35 studios, 60 one bedroom units and 10 two bedroom units. Up to 5 retail spaces are proposed at the ground level. Parking for 17 cars and 163 bicycles will be provided.

9th & Belmont

Read More

Metro reports: Cherry Park School, Station Place Lot 5, Industrial Home Building and more

Industrial Home Building

Industrial Home Building

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

GBD Architects have requested Design Advice for South Waterfront Block 41:

Design Advice Request for new apartment building

Myhre Group Architects have requested Early Assistance for a project at 5025 NE 21st Ave:

27-30 unit multi-family housing community. Wood framed 4-story structure. If necessary, relocate the existing internal property line.

GBD Architects and THA Architects have scheduled a Pre-Application Conference to discuss Station Place Lot 5:

Proposal is for an approx. nine story building with approx. 220,000 GSF including leaseable office space and ground floor retail and parking.

FFA Architecture and Interiors have scheduled a Pre-Application Conference to discuss an addition to the Industrial Home Building at 200 SE Martin Luther King Blvd:

This is a proposed addition to expand the current Industrial Home Building located on the property to accommodate tenant expansion plans. The current parking will be maintained with two connection floors above to be added. The addition is approx. 5660 sf in total with the consideration of a green roof system

Ankrom Moisan Architects have submitted 535 NW 11th Ave for Design Review:

15 story mixed use apartment building in River District. FAR transfer for additional height. Modifications to Ground Floor Windows, Minimum Ground Floor Active Uses, Minimum Active Floor Area, and Parking Area Layouts. Adjustment to Loading Spaces. PBOT Design Exception for garage door within 20 feet of lot line.

Ankrom Moisan Architects have submitted 915 SE Belmont St for building permit review:

6 story mixed use

Allusa Architecture have submitted the 97th Ave Gymnasium for building permit review:

Construct new gymnasium

A building permit was issued to Colab Architecture for a project at 2240 NW Pettygrove St:

New 5 story apartment building with eco roof, no onsite parking, stormwater facilites and site improvements included

A building permit was issued for a convenience store at 5025 NE 101st Ave:

New single story 3,024 sq foot convenience store with parking lot improvements on lot with existing service canopy to remain – separate permit for trash enclosure

A building permit was issued for an addition to the Cherry Park School:

Addition with 5 classrooms, office and main entry, fire wall division of (E) buildng

 

Focus: 25 Tallest Buildings Planned or Under Construction

It’s now almost 6 months since the first post on Next Portland. Since then we’ve published over 180 posts and added over 350 projects to our map, which is a testament to the staggering scale of development happening right now in Portland. Much of this development is 4-6 story buildings along the corridors such as N Williams and SE Division, but there is also a large number of tall buildings going up in the Central City, which why we decided to list the 25 tallest buildings planned or under construction.

While the boom of the 2000s was defined by the activity in South Waterfront, today that district has no apartments or condos planned over 6 stories tall. By contrast the Pearl, the Lloyd District and the Central Eastside are all seeing their skylines altered. Activity in Downtown has quieter, but it also has the tallest building in our list, which is now the 4th tallest building in the city.

Where possible, the heights given are the building height as defined in the Portland Zoning Code and published in the Design Commission’s Final Findings. Where indicated the heights have been estimated.

1 – Park Avenue West

Height: 460′
Architect: TVA Architects
Status: Under Construction

November 21, 2013 LU 13-214772 DZ - Drawings - 03

Read More

Metro Reports: massive development in the Lloyd District, Hallock & McMillan Building and more

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Holst Architecture have requested Design Advice for a project at 1510 NE Multnomah St, currently the Regal Lloyd 10 cinema and associated surface parking:

A three-building mixed use development containing 980 units of market rate housing, as well as retail and community spaces. Structured parking (873 spaces) included.

Emerick Architects have requested early assistance for an addition to the historic Hallock & McMillan Building at 237 SW Naito Parkway:

2 story, 950 sq ft addition to existing building to provide ADA accessibility & fire & life safety upgrades.

Early assistance has been requested for a drive thru Starbucks at 5810 N Lombard St:

Existing building to be removed. Proposal is for a Starbucks drive-thru. Access to the site is proposed to remain with the existing two driveways.

Scott Edwards Architecture have requested early assistance for a development at 1551 SW Upper Hall St:

New Multi family (3-unit) development.

Ankrom Moisan Architects have scheduled a Pre Application Conference to discuss a project at 1300 NE 16th Ave:

2-story 10-plex independent living apartments with below grade parking located in current parking lot area.

Waterleaf Architecture have scheduled a Pre Application Conference to discuss a project at 1949 SE Division St:

Proposed project is a four story commercial building consisting of one story of ground floor retail space and secured parking below three stories of office space.

Site works Design | Build have scheduled a Pre Application Conference to discuss the renovation of the YMCA at 2815 SW Barbur Blvd for Under Armour:

Renovation of 1977 YMCA – Type 3 DZ

Urban Development Group have submitted a building at 8235 SE 17th Ave for building permit review:

New 4 story wood frame apartment building with underground parking ; basement parking to include new bike storage, trash enclosure, dog wash room, and 3 apartment units;

SERA Architects have applied for the first of the required building permits for the AC by Marriott hotel:

***STR 1 : Excavation and Shoring and structure to grade, under slab plumbing***204 room hotel 3rd and Taylor, 15 story on 1/4 block

In Situ Architecture have applied for building permits for an addition at 3740 SE Haig St:

Addition of 2 stories to existing single story duplex (with unit on main level and one in basement) to create 4 plex, new units are 2 story units, no work at existing units, detached trash enclosure is 20sf

LRS have applied for building permits for an addition to a nursing home at 6125 SW Boundary St:

Renovation of existing 53,000 sf Type V nursing home with a 44,000 sf addition, new parking lot and site improvements

A building permit was issued for a new building at 17 SE 63rd Ave:

New tri-plex on same site as existing 6 unit apartment building

 

915 SE Belmont St

Ankrom Moisan Architects have submitted drawings of a proposed apartment building in the Central Eastside for Design Review. The 6 story building at 915 SE Belmont St will include 105 apartment units over ground retail. 17 vehicular parking spaces are proposed. The project, reported on by The Oregonian in 2013, is by developer Foresight Development & Real Estate, who previously renovated the Grand Central building one block to the west.

915_se_belmont_rfr_01

West (SE 9th Ave) elevation

Read More