Weekly Roundup: Framework, Park Avenue West, Block 75 Phase II and more

The 12 story Framework building by Lever Architecture, planned for a site as NW 11th & Glisan in the Pearl

The 12 story Framework building by Lever Architecture, planned for a site at NW 10th & Glisan in the Pearl

In an article titled “Wooden Buildings as Strong as Steel” Newsweek wrote about how Portland is leading the nation in the adoption of Cross-Laminated Timber (CLT). The article includes quotes from Ben Kaiser of PATH, architect and developer of Carbon12and Thomas Robinson of Lever who is the architect for Framework in the Pearl and Albina Yard.

An article and photo gallery in the Portland Business Journal showed how CLT is made. Riddle-based D.R. Johnson Lumber Co is currently the only domestic lumber mill certified as capable of producing the wood panels.

The Portland Business Journal covered Block 75 Phase IIthe next high-rise building planned for the Burnside Bridgehead. The Works Partnership designed building is the latest partnership between Beam Development and Urban Development + Partners.

The Oregonian noted that a Travel Portland found that hotel prices have soared since 2010. The rising rates have led to a hotel construction boom, as Next Portland covered last year.

Construction is underway on the expansion of the SERA designed NW Portland International HostelIn a story about the project KGW wrote that the hostel is trying “to keep up with the booming tourism in the Rose City”.

The Portland City Council approved a realignment to the route of the proposed extension of SW Bond between the Tilikum Crossing and SW River Parkway. The extension, which will begin construction this year, allows OHSU projects including the Knight Cancer Research Building to move head.

The first residential tenants are moving into Park Avenue Westreported the Portland Business Journal. The TVA Architects designed building is now the fourth tallest building in Portland.

The Portland Development Commission is increasing its contribution to projects in Lents by $6.3 million, according to the Portland Business Journal. The projects include the Asian Health and Services Center by Holst Architecture, Oliver Station by Ankrom Moisan Architects and 9101 SE Foster Rd by Hacker Architects. The developers behind Oliver Station have gained control of the Chevron station at SE 92nd and Foster, enabling the project to occupy the full block.

Commissioner Steve Novick wrote about an idea that is rapidly gaining traction as a way to bring affordability back to Portland’s neighborhoods. “Missing middle housing” is new term for old styles of development, currently prohibited in most of Portland, at a density between that of single family detached houses and large mid-rise apartment buildings. These include housing types such as rowhomes, courtyard apartments, triplexes, built to the same height and scale as single-family homes.

A post at Portland Shoupistas asked if the PDC’s $26 million garage at the Convention Center Hotel  will be a money maker or a money loser. Though planned as  revenue generator, the post points out that “just to break even, this garage will need to generate more than $12 per space every day of every year for 20 years, starting in 2020.”

KOIN reported that “Ivy Island may not be ‘gateway’ to St. Johns for long“. A street vacation in the St Johns neighborhood was approved this week. The vacation will allow the mixed use Union at St Johns building by Jones Architecture to move ahead, while creating a safer road layout.

 

Metro Reports: 3rd & Salmon, Pearl Block 20, Seven Corners Community Collaborative and more

3rd & Taylor

The proposed hotel at SW 3rd & Taylor

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Boora Architects have requested Design Advice for Pearl Block 20:

Block 20 is a proposed hi-rise condominium building. One-hundred forty-two units are included in a five floor podium and 20 floor tower.No retail is proposed for this project. All parking is above grade and surrounded by units.

Allusa Architecture have requested Early Assistance for a project at 6805 SE 52nd Ave:

Build two new 3-story apartment buildings with no basement. One structure will be 18 units. The other structure will be 12 units.

Urban Development Group have requested Early Assistance for a project at 4917 SE Hawthorne Blvd:

New 46-unit mixed use apartment building with 2700 sq ft of commercial.

Early Assistance has been requested for a project at 700 SE Belmont St:

New self-storage facility. Existing structure(s) to be demo’d/removed.

Works Partnership have requested Early Assistance for a project at 224 SE 2nd Ave:

Proposed change of existing warehouse to office use with retail on ground floor. Also a proposed addition to the building of one story penthouse for residential occupancy. See EA 15-216040.

Studio 3 Architecture have submitted a project at 7924 SE Milwaukie Ave for Design Review:

See EA 15-242170 appt and CO 16-100215. New two story four unit apartment structure behind existing single family residence which will remain.

Ankrom Moisan Architects have submitted the hotel portion of the 3rd and Salmon development for Design Review:

Proposal for joint development of boutique hotel with 245 guest rooms and on site fitness center and conference center. Project will include ground floor and rooftop retail space. One modification needed for ground floor window and 1 adjustment needed for number of loading spaces.

Waterleaf Architecture have submitted the Seven Corners Community Collaborative for Historic Resource Review:

Proposed project is a four story commercial building consisting of one story of ground floor retail space and secured parking below three stories of office space.

Mentrum Architecture have submitted a project at 6205 N Minnesota Ave for building permit review:

Construct new 3 story (18 unit) apartment building with partial basement; attached trash enclosure and associated site work

A building permit was issued to Fosler Portland Architecture for a project at 7247 N Leavitt Ave:

New three story, 20 unit apartment complex; on site bike parking and trash enclosure; no onsite parking

A building permit was issued to HC Architecture for The Porter Hotel:

new 16-story, 299 guestroom hotel includes first floor full service restaurant, market cafe; second floor 5,000 sf meeting room with outdoor terrace; rooftop restaurant and covered terrace. One level below grade with shoring includes gym facilities, locker rooms, pool and back of house activities.

 

Landmarks Commission approves NW 23rd Ave Restoration Hardware (images)

After three Design Advice hearings and two Design Review hearings, the Historic Landmarks Commission has approved designs for a new Restoration Hardware building on NW 23rd Ave. The building by Ankrom Moisan Architects will be modeled on the store’s ‘Gallery’ concept, where furniture is display in a series of linked rooms as they might be in a house. A grand staircase will rise through the three story building, up to an open air pavilion and roof terrace where outdoor furniture will be displayed. Below-grade parking for 18 vehicles will be provided.

NW 23rd & Glisan Restoration Hardware

Read More

Tower at 14th & Glisan receives Design Advice (images)

Ankrom Moisan Architects have gone before the Design Commission for advice on a 16 story tower proposed for NW 14th & Glisan in the Pearl District. The developer behind the 174.5’ tall project is Holland Partner Group. The mixed use building will contain 244 residential unit and approximately 4,285 sq ft of ground floor retail. Parking for 201 vehicles is planned in three levels of below grade parking.

NW 14th & Glisan

Read More

Metro Reports: Riverplace Parcel 3, North Hollow apartments, 9101 SE Foster and more

9101 SE Foster

9101 SE Foster by Hacker architecture

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Ankrom Moisan Architects have requested Design Advice for Riverplace Parcel 3:

Design Advice Request for two new proposed residential towers. The project will include 162 market-rate and 204 affordable apartment units. The ground level will include retail space and a grocery store. The residential units will share 173 below-grade parking spaces and a 65-space ground-level parking area will serve the grocery store.

Ankrom Moisan Architects have requested Early Assistance for 120 SE Clay:

Industrial site office development. Basement includes approx 82 parking spaces – accessed via Clay.

TVA Architects have submitted a project at 442 NE Jessup for Design Review:

New apartment

Hacker Architecture have submitted 9101 SE Foster Rd for Design Review:

4-story mixed use development with ground floor commercial and 3 floors of apartments.

Woofter Architecture have submitted the PSU Viking Pavilion for Design Review:

Renovation and modernization of existing Peter Stott Center building

Works Partnership have submitted a project at 1400 NW 22nd for building permit review:

Alterations-exterior alteration improvements w/storefront and accessible entrances. ASCE 41 structural seismic upgrade. Addition of exterior courtyard and roof deck interior improvements. Interior improvements include water closets, lavs and bike storage, enclose trash and utility room.

A building permit was issued to SERA Architects for the North Hollow apartments at 1501 SW Taylor St:

partial – shoring; excavation; underground utilities and concrete structure from mat slab up to and including the 2nd floor concrete podium.

 

Design Commission offers advice for 3rd and Taylor (images)

Ankrom Moisan Architects have gone before the Design Commission with proposals for a nearly full block development at SW 3rd and Taylor. The project for Onder Development would include a 20 story hotel building on the southern half of the block and a 10 story office building on the northern half of the block. The potential loss of two historic buildings on the site has brought significant attention to the project, including a mention by the Historic Landmarks Commission during their State of the City Presevation Report to the City Council last week.

3rd and Taylor

Read More

Metro Reports: Canopy by Hilton, Lloyd Center remodel and more

The Canopy Hotel by Hilton, due to be reviewed by the Design Commission on November 19th

The Canopy Hotel by Hilton, due to be reviewed by the Design Commission on November 19th

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Ankrom Moisan Architects have requested Early Assistance for a building at 2869 NE Sandy Blvd:

Proposal is for a six story apartment bldg with underground parking garage (60 spaces.)

Holst Architecture have requested Early Assistance for the Asian Health and Services Center at 9005 SE Foster Rd:

New 3 story office building with community gathering spaces and on grade parking.

Early Assistance has been requested for a project at 9525 N Lombard St:

New 2-story apartment building with 7 dwelling units.

A demolition permit was issued for a building at 425 NW 9th Ave, set to be replaced by the Canopy by Hilton:

Demolish single story warehouse building

Lenity Architecture have submitted a project at 7805 SE 13th Ave for building permit review:

Construct new 4 story mixed use apartment building; main level to include 3 tenant spaces, parking garage, trash room area, and lobby area; floors 2-4 to include 30 units

A building permit was issued to Waterleaf Architecture for portions of the Lloyd Center Remodel:

Interior renovation for Lloyd Mall includes: reconfigure the ice rink and center concourse, reconfigure food court, remove selected interior pedestrian bridges, replace mall concourse flooring and upgrade and replace mall lighting. no exterior work under this permit

Correction: an earlier version of this post listed the address for the Canopy Hotel as 425 NW Glisan. The correct address is 425 NW 9th Ave.

Weekly Roundup: Lents Town Center projects, 4926 SE Division, Veteran’s Memorial Coliseum and more

Asian Health and Service Center

The Asian Health and Services Center on parcel #4 of Lents Town Center

The Portland Business Journal took a first look at three projects in Lents Town Center, including Oliver Station by Anrkom Moisan Architects, the Asian Health and Services Center by Holst Architecture and 9101 SE Foster Rd by Hacker Architects.

With all three buildings at Hassalo on Eighth now open, the Portland Business Journal published a photo gallery of the completed project.

The Portland City Council voted to spend $67 million more in Urban Renewal money on affordable housing, wrote the Portland Mercury. Also approved by the Council was a resolution instructing the Portland Housing Bureau to perform a nexus study on whether Portland should introduce a “linkage fee” on new residential and commercial developments.

During the hearing on housing affordability, Commissioner Steve Novick proposed an amendment to demolish Veteran’s Memorial Coliseum, and redevelop the site for housing. None of the other four City Commissioners supported the proposal.

Portland Architecture argued that in deciding to renovate the Portland Building the City Council chose to do the right thing.

The Portland Chronicle looked at a site at 4926 SE Division St where Urban Development Group is planning its next mixed use development.

A grand opening was held for the new Oregon Reproductive Medicine facility at 808 SW 15th Ave in Goose Hollow.

Metro Reports: New Market Theater, Block 75 Phase II, 1502 NW 19th and more

1502 NW 19th Ave

1502 NW 19th Ave

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Ankrom Moisan Architects have requested Design Advice for 1430 NW Glisan St:

Type III Design Review for the construction of a 270,000 sq. ft., 15-story residential tower, with approx. 250 units. 5,500 sf of ground floor Retail. A below-grade parking structure will provide 200 spaces. The applicant intends to transfer FAR potential from the 4,300 sq. ft. lot directly north of the site. Bonus FAR for the residential development will also be utilized.

Works Partnership have requested Design Advice for Block 75 Phase II:

Design Advice Request for a 19-story mixed use tower.

Dominek Architecture have requested Early Assistance for a project at 2423 SE 58th Ave:

Proposal is for new six unit apartment development, two buildings, on-site parking, amenity bonus for additional unit, new water and sewer connections.

Early Assistance has been requested for a project at 12045 N Parker Ave:

Construction of a new commercial retail restaurant with parking lot improvements.

Urban Development Group have requested Early Assistance for a project at 3701 SE Caruthers St:

New 4 story mixed use building, Approximately 2000 sq ft retail & 30 apartments.

A Pre-Application Conference has been scheduled to discuss a project at NW 13th & Glisan:

Pre-application conference for a new 6-story mixed use building.

SERA Architects have scheduled a Pre-Application discuss an addition to the New Market Theater at 50 SW 2nd Ave:

New 4 story mixed use creative office building addition to the New Market Theater Historic Building.

SERA Architects have submitted 1502 NW 19th Ave for Design Review:

New mixed-use building with 1 ground level retail space and stacked (mechanical) parking (50 spaces). The upper floors will contain 90 residential units. Six stories total.

A building permit is under review for a project at 1841 N Lombard St:

New 3 story – 18 unit apartment building – with associated site utilities and landscaping-attached trash enclosure

Pre-Application Conference scheduled for Oliver Station in Lents (images)

A Pre-Application Conference has been scheduled to discuss Oliver Station, a mixed use development in Lents by Ankrom Moisan Architects for developer Palindrome Communities. The project would include 130 residential units, with a mix of one and two bedroom apartments. Ground floor commercial space is proposed, facing both SE Foster Rd and 92nd Ave.

Oliver Station

Read More