Metro Reports: PDX PACR, Old Fire Station Property, 8130 SE Woodward, and more

The $268 million PDX Parking Additions and Consolidated Rental Car Facility will include 2,225 long-term parking stalls and 2,071 stalls for rental cars.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers April 22nd to April 28th, 2019.

Early Assistance has been requested by WDC Properties for a project at 1604 SE Cesar E Chavez Blvd:

Remove duplex and construct new 50 unit apartment complex with IH for bonus.

Early Assistance has been requested by Carleton Hart Architects for a project at 1535 NE 17th Ave:

Proposed mixed use project adjacent to existing (to remain) church. Proposed development includes 6-story, 96 unit affordable housing, over 24,000sq ft office, church and classroom spaces. Street vacation requested.

Early Assistance has been requested by Allusa Architecture for a project at 422 NE Beech St:

New 8 unit hotel, hotel amenities include an exercise room/workspace on the ground floor. A separate ground floor office space is also provided.

Early Assistance has been requested by Quilici Architecture and Design for a project East of 6140 SW Boundary St:

Develop the property in phases as affordable rental housing and expansion facilities for Cedar Sinai Park, the non-profit senior living and care organization that owns the property.

A Pre-Application Conference has been scheduled by Abbasi Design Works for a renovation of the Old Fire Station Property at 510 NW 3rd Ave:

Restoration and small addition (of 1600 sq ft) to existing URM building, Engine House #2. Stormwater management to be managed using flow-through planters and water quality treatment.

A project at 2510 NE Sandy Blvd has been submitted for a Type II Adjustment Review:

5-story (with mezzanine) mixed-use building. Adjustment to Building Facades Facing Sandy Blvd standard (33.575.110).

Buildings permit are under review for the PDX Parking Additions and Consolidated Rental Car Facility:

New 4 story airport operations office with rental car retail on the ground floor of the building, offices on floors 2-4, with associated site improvements related to the adjoining new 6 story PACR parking garage.

New 6 story parking garage with associated site improvements, exit helix ramp revisions, elevated roadway and bridge connections to existing P1/P2 and QTA buildings serviing Rental Car and Long Term parking.

A building permit was issued to Koble Creative Architecture for a project at 4647 SE 40th Ave:

New 15 unit apartment building comprised of a two-story wing and a three-story wing with a connecting bridge; onsite stormwater

A building permit was issued to Mentrum Architecture for a project at 1834 NW 25th Ave:

Construct new 5 story 25 unit apartment building with no parking – see folder comments

A building permit was issued to Fosler Portland Architecture for a project at 8130 SE Woodward St:

Construct new 3 story 19 unit apartment building; no parking; site work included; interior trash enclosure (sep mt)

Metro Reports: Framework, George Besaw Apartments, Block 45, and more

Block 45

Block 45, as presented to the Design Commission in October of this year

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Jones Architecture for a project at 8608 N Lombard St:

New mixed-use building.

Early Assistance has been requested by Portland Parks and Recreation for the Forest Park Entrance and Nature Center at 4315 NW St Helens Rd:

Proposal at Forest Park Entrance and Nature Center. Planned improvements: 1) nature center with restrooms, 2)access drive and parking with ada spaces and bus parking; 3) trailhead and accessible pathways connect to forest park;4) street frontage improvements

Early Assistance has been requested by DECA Architecture for a project at 10414 NE Halsey St:

Proposal is to transform this two level structure (which is currently a hardware store and saddle shop with apartment unit on second level) to an urban winery with production, tasting room, offices and storage areas. Apartment unit with minor upgrades will stay as is.

A Pre-Application Conference has been scheduled by Abbasi Design Works for a renovation of the Old Fire Station Property at 510 NW 3rd Ave:

Proposal is to renovate the existing historic fire station landmark building to retail and office space and construction of new on-grade parking.

A project at 2014 SE 11th Ave has been submitted for Type III Design Review by Hacker Architects:

New four story 26,500 gsf building providing 34 apartment units and 1,771 sf of retail space on the ground level.A central apartment entry courtyard is proposed to be shared as a ped/public amenity.

Block 45 has been submitted for Type III Design Review by LRS Architects and Lever Architecture:

Proposal is for a new 12-story building with 7,500 square feet of ground floor retail and approximately 240 residential units. Project is a mix of affordable and market rate housing. No parking is proposed.

A project at 1332 N Skidmore St has been submitted for Type II Design Review by Holst Architecture:

2 new mixed-use buildings, 158 apartment units, 59 parking spaces with underground parking. 2 mods requested: parking area setbacks and landscaping; standards for all bicycle parking.

A project at 525 SE Martin Luther King Jr Blvd has been submitted for Type III Design Review by Hacker Architects:

Proposal is for new construction of a six story building above ground with two levels of underground parking. There will be five levels of office space above one level of retail or restaurant use.

A project at 7119 SE Milwaukie Ave has been submitted for building permit review by William Wilson Architects:

New 4-story wood framed mixed use building including 232 unit apartment building with basement garage, and site improvement, interior trash room, shell commercial space(potential future restaurant)

Framework at 430 NW 10th Ave has been submitted for building permit review:

New 12-story, mixed-use building; five floors of office and five floors of residential over ground floor retail; see comments re: review by State of Oregon Building Codes Division;

An excavation and shoring permit for the Oregon Convention Center Hotel has been submitted for review:

Excavation and shoring, underground utilities, stuctural foundations, vertical structure only, vertical fire protection standpipe at stairs

A building permit was issued to GBD Architects for the George Besaw Apartments at 2323 NW Savier St:

New construction of new mixed use 4 story apartment building containing 51 residential units, with retail and services on the ground floor

A building permit was issued for a project at 9779 SE Market St:

New building with atrium, offices for administration and music department; music area includes auditorium, music and choir classrooms, and restrooms with storage area at mezzanine level; administrative office area includes reception area, offices, conference rooms, restrooms, mezzanine level above includes larger conference room, alumni center and current storage area

 

Metro Reports: apartments on SW Jefferson, N Vancouver, SE Belmont and more

Jefferson 14 Apartments

Jefferson 14 Apartments

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Abbasi Design Works has requested Early Assistance for a project at 3150 SE Belmont St:

New construction of 20 apartment with commercial on ground floor and on-site parking

Early Assistance has been requested for a project at 1727 NW Hoyt St, a building which previously slated for demolition:

Utilize historic preservation incentives to renovate a existing office building and convert it to a boutique hotel 70 rooms.

Early Assistance has been requested for a project at 1015 NW 16th Ave:

Demo adjacent buildings and combine lots for a single mixed-use building. Proposed use: retail and self storage.

A series of building permits are under review at 14224 E Burnside St:

New 3 story (13 unit) apartment buildilng with laundry and common room; with on site parking, site improvements and site amenities (sports court, play area, and court yard)

New 3 story (9 unit) apartment building

New 3 story (12 unit) apartment building

Myhre Group have submitted drawings for a building permit for a new building at 2405 N Vancouver Ave:

New multi family 5 level, 54 unit apartment building over a below grade parking garage

TVA Architects have submitted drawings for a building permit for the Jefferson 14 apartments:

New 6 story apartment building, landscaping and site improvements