Weekly Roundup: City Club on Affordability, High Demand for Office Space, Inclusionary Zoning and more

Overland Company Warehouse Building

The Overland Warehouse, one of the many existing buildings being converted into creative office space in order to the satisfy high demand for inner Portland office space.

The Oregonian reported that the City Club of Portland released a report calling for “‘action now’ and more than just ‘half-measures and business as usual'” to deal with Portland’s housing crisis. The report recommended lifting the state ban on rent control, banning no-cause evictions and creating a rental property licensing system. The research committee split over whether Portland’s single family neighborhoods should become denser: the majority said that the city should “work to overcome neighborhood skepticism about ‘missing middle housing,'”; while a minority argued that the city should re-zone the single family neighborhoods for greater density.

Portland has started work on how to implement Inclusionary Zoning, according to the Willamette Week. An expert panel has been formed that includes Vivian Satterfield of OPAL PDX, Sarah Zahn of Gerding Edlen, Margaret Tallmadge of Coalition of Communities of Color, and Eric Cress of Urban Development + Partners.

The Business Tribune wrote about two projects that will change the face of inner E Burnside: the Jupiter Hotel Expansionand 7th & Burnside.

Demand for office space in Portland is at record highs, reported The Oregonian. While there are a large number of office projects planned in Portland (as previously covered by Next Portland) many of these are a year or two away from completion.

Oregon Business profiled Jan Bredack, the German founder of ‘Veganz’. The vegan grocery chain is currently looking for locations for its first Portland store, including the under construction Yard building.

 

Metro Reports: Convention Center Hotel, 419 E Burnside, Con-Way Leland James Center and more

419 E Burnside

419 E Burnside

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Otak Architects have requested Early Assistance for a project at 1500 NE Irving St:

New building – 2 options: either new office building – or new residential building. Hoping to meet community design standards.

Scott Edwards Architecture have requested Early Assistance for a project at 1205 SE Morrison St:

Proposing new 4-story apartment building with ground-floor covered parking and community space

Early Assistance has been requested for a project at 6400 SW Canyon Ct:

Proposed project is for 267 apartment units located in four buildings with structured parking under and on-site parking and related site improvements.

Leeb Architects have requested Early Assistance for a project at 5327 N Interstate Ave:

Proposal for new apartment complex with underground parking and ground floor commercial

Polyphon Architecture & Design have scheduled a Pre-Application Conference to discuss a project at 710 E Burnside St:

Pre-application conference to discuss new 11-story mixed use building, which will require Type III DZ.

Works Partnership have submitted the expansion of the Jupiter Hotel for Design Review:

Proposal is for a six story development to expand the Jupiter Hotel.

The Convention Center Hotel has been submitted for Design Review:

Proposal for new hotel and adjacent parking garage, with adjustment for parking and loading entrances

SERA Architects have submitted the Con-way Leland James Center Renovation for building permit review:

Re-skin exterior of building, new metal stud walls tto support brick veneer, and windows. create office core for future TIs, add 4th floor penthouse with decks and green space. add vehicle ramp to basement for new tenant parking. ***NO OCCUPANCY UNDER THIS PERMIT***

Demo interior of unoccupied bldg, includes all MEP and non supoorting walls, and all exterior siding.

The first building permits were issued for 419 E Burnside:

Demolish free standing canopy and 20’x 25′ office for used car sales lot. Demolish stormwater facility located on parking lot. Associated with 14-216353-CO and 14-216353-FND-01-CO.

Excavation, shoring and foundation at basement. Basement slab, basement columns and wall, first floor post tensioned concrete slab, below grade utilities.

A building permit is under review for a project by Carleton Hart Architecture at 110 SW Arthur St:

New, 3-story multi-family project with 39 units of studio and 1 bedroom apartments.

A building permit was issued to Boora Architects for partial demolition of the YMCA building at 2815 SW Barbur Blvd:

partial – a) demolition of exterior east and north facades; b) demolition of interior partitions and casework; and c) demolition of exterior site elements to the east and north of the building. Mechanical, electrical and plumbing contractors to obtain separate demolition permits.) No occupancy during construction.

A building permit was issued to Waterleaf Architecture & Interiors for a portion of the Lloyd Center Remodel:

adding new plaza space and mall entry facing Multnomah Street, including a new curainwall, a new sprial entry stair located inside the Mall, a new pedestrian bridge over the plaza, a new internal traffic ramp, pedestrian stair at the SW parking structure and required bike parking.

A building permit was issued to Colab Architecture for a project at 1510 N Sumner St:

New construction of 25-unit apartment building with partial ground floor retail; interior bike parking; attached trash enclosure with eco roof above, no onsite parking

Expansion of Jupiter Hotel goes before Design Commission for advice (images)

Works Partnership have brought initial designs for an expansion of the Jupiter Hotel before the Design Commission. The new 6 story building would add 67 rooms on a site directly to the east of the existing hotel. The ground floor would include restaurant and retail spaces facing onto E Burnside, along with a lobby and reception located at the corner of the site. An event space as well as an upper level lounge, connected to the lobby by a stair, is proposed for the second floor. Guest rooms would be located in floors 3-6.

Jupiter Hotel

Read More

New Hotel Planned for E Burnside and SE 9th Ave

A new hotel by Works Partnership has been proposed for the corner of E Burnside and SE 9th Ave. The 6 story building would include ground floor retail and restaurant uses, a second floor indoor/outdoor event space and four floors of hotel rooms. With projections of 8′ over the street, the building would be the latest addition to the lower Burnside arcade district, which includes both historic buildings and new buildings such as Works Partnership’s own office.

910_e_burnside_preapp_00

Read More

Focus: 20 new hotels proposed for Portland

When construction activity first started to return to Portland around 2012 it seemed like all that was being built was apartments. While residential still dominates the construction industry, other sectors of the market have started to return. In the last year there has been been a noticeable increase in the number of hotels proposed in Portland. Next Portland counts at least 20 hotels either proposed, going through Design Advice / Design Review, being reviewed for building permits or under construction. Together these represent over 3000 new rooms, a substantial number for a city that had 25,924 rooms in its metro area as of 2014.

It is unlikely that every single hotel on this list will be built; some of the Early Assistance application may represent property owners performing a feasibility study, and there is always the possibility of a downturn in the economy. Even still, it’s clear that Portland is going to have a substantially larger number of hotels in just a couple years. Click through to see the full list, arranged by number of rooms.

1 – Hyatt Regency at the Convention Center

Number of rooms: 600+
Architect: Ankrom Moisan Architects, ESG Architects
Status: Design Advice

Hyatt Hotel at the Oregon Convention Center

Read More

Metro Reports: hotel on Burnside, mixed use in Lents, office on Front Ave and more

1320 Broadway, formerly home to the Oregonian

1320 Broadway, formerly home to the Oregonian

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Works Partnership have requested Design Advice and scheduled a Pre-Application Conference for a project at 910 E Burnside:

Proposal is to build a 6 story structure with restaurant/retail on ground floor, indoor/outdoor event space on second floor and four floors of hotel units.

Skylab Architecture have requested Design Advice for a structure that would like Yard at the Burnside Bridgehead to Sideyard:

Design Advice Request for a Type I Skywalk spanning between Blocks 67 & 76 off of East Burnside

Scott Edwards Architecture have requested Early Assistance for a project at 1451 NE Alberta:

Redevelopment of a three-story, mixed-use building with a warm-shell commercial space of the ground floor. 2 levels of residential above (10) one-bed/one-bath units, while preserving the existing building facade. Checking that no stormwater improvements are required – since they are redeveloping.

GPA Architects have requested Early Assistance for a project at 3131 N Columbia Blvd:

2-story office building with support spaces for manufacturing facility

GBD Architects have scheduled a Pre-Application Conference to discuss a project at 2301 NW Savier St:

Pre-application conference for a Type III DZ review for a new 4-story mixed use building.

Carleton Hart Architecture have scheduled a Pre-Application Conference to discuss a project at 8710 N Dana Ave:

New Group living facility – Supportive Living for youth phasing out of foster care. Proposal is for 15 unit group living structure.

Hacker (previously THA Architecture) have scheduled a Pre-Application Conference to discuss a project on Lents Town Center Property #3 (South) at 9101 SE Foster Rd:

4-story mixed use development with ground floor commercial. Approximately 28 Parking Spaces

Ankrom Moisan Architects have applied for a Conditional Use Review for a project at 1300 NE 16th Ave:

Combine parking lot for hpp 1300 NE 16th Ave. Directly adjacent house to be demolished at 1716 NE Clackamas St. Proposal is for new two story 10-plex independent living apartments to be built over below grd parking. With 4 adjustments

Hacker (previously THA Architecture) have submitted the Field Office at 2030 NW 17th Ave for Design Review:

Type 3 Design Review w/2 modifications for two 5-6 story office buildings above a “park” that creates a central garden/plaza, lobby areas, retail spaces, and building amenitites.

Allied Works Architecture have submitted 1320 Broadway for building permit review:

Core and shell renovation of existing full block Oregonian building. Partial change of occupancy, convert basement offices to parking. New entrances and windows, new ramp to parking. Reinforce mezzanine for live loads, new opening in elevator shaft for new stop. Relocate existing generator. New restrooms, locker rooms, and showers.

A building permit has been issued for a project at 6518 SE Division St:

New 3-story apartment building with 9 units, detached 71 sq ft fenced trash enclosure, parking lot and associated site work. No truss package provided

A building permit has been issued to Dustrud Architecture for a project at 2605 NE 7th Ave:

6-story, 68 unit multifamily apartment (5 over 1) with 1 story 43 cars/75 bikes underground parking.

A grading permit has been issued to Opsis Architecture for the Oregon Zoo Education Center:

Site work for new Oregon Zoo Education Center. Demo 3 buildings (see separate permits),demo existing below grade utilities and site prep for future buildings related to new education center.