Weekly Roundup: 140 SW Columbia, Heartline, Iron Fireman, and more

140 SW Columbia St

140 SW Columbia will include 349 residential units, directly to the east of the KOIN tower.

Construction on the 20-story tower at 140 SW Columbia will begin by the end of the year, reports the Oregonian.

The Oregonian reported vacation management company Vacasa has moved into a new home, occupying all the office space at HeartlineThe Daily Journal of Commerce published photos of the GBD Architects-designed tenant improvement.

The Daily Journal of Commerce published photos of the Iron Fireman building, where a second phase of core-and-shell improvements is wrapping up.

Mayor Wheeler has selected Shannon Callahan as the permanent director of the Portland Housing Bureau, according to the Oregonian. Callahan had been serving as the interim director since 2017.

Hey Love, the ’60s- and ’70s-style fern bar-inspired cocktail joint, has opened inside the Jupiter NEXT hotel, reports the Portland Mercury.

Weekly Roundup: Lincoln High School, Oregon Harbor of Hope, Broadway Corridor, and more

Lincoln High School

The new Lincoln High School will be built at the west side of the campus, allowing the existing school to remain open during construction. The new school is being designed by Bora Architects.

The Lincoln High School Rebuild went in front of the Design Commission for the first time. The Daily Journal of Commerce wrote about the reception it received.*

Eater Portland reported that Bamboo Sushi offshoot QuickFish will open its third location in Heartline on August 15th.

The Oregon Harbor of Hope homeless shelter and navigation center is half a million dollars over budget, reports the Oregonian.

The Portland Housing Bureau is teaming with three other public agencies to provide more than $12 million for projects that combine housing and mental health services, writes the Portland Business Journal.

A group called the Healthy Communities Coalition is pushing for a massive number of affordable units at the Broadway Corridor, according to the Willamette Week.

Cafe Hey Love Superette has opened in the lobby of Jupiter NEXT Hotelwith coffee, pastries and CBD lattes, writes Eater Portland.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Weekly Roundup: Brio Lofts, Jupiter NEXT, Pepsi Blocks, and more

The Pepsi Blocks development will include the retention of the existing mid-century building facing NE Sandy, and the addition of up to 1,000 units. The project is being designed by Mithun Architects for developer Security Properties.

The masterplan for the Pepsi Blocks on NE Sandy went in front the Design Commission for the first time last week. The Daily Journal of Commerce reported that the project was met with a generally positive reception.*

The Oregonian looked at the Brio Lofts at 177 N Failing St and the Zeal Lofts at 3139 N Williams Ave, two micro-apartment developments by the same developer Vibrant Cities, which will also include micro-restaurant space.

The Portland Mercury reported on the Housing Bureau’s plans to buy a site at 5827 NE Prescott St, which will be developed with up to 75 affordable apartment units.

As the Lotus Lotus Cardroom and Cafe gets demolished to make way for the SW 3rd & Salmon tower, the Portland Business Journal took a look at its past — and its future.

Portland Architecture visited the recently completed Jupiter NEXT hotel, with its “matte-black facade that makes use of a familiar material in an unfamiliar way.”

With the recent approval of the Moxy Hotel and plans for Block 216 at SW 9th & Alder announced, the Portland Mercury asked whether rampant development is signaling the death of the food cart pod?

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Weekly Roundup: Jupiter NEXT hotel, Allan Building, Multnomah County Central Courthouse, and more

The Allan Building would rise to to a height of seven stories and include over 70,000 sq ft of occupied space.

The Daily Journal of Commerce wrote about two Central Eastside industrial office buildings* proposed by Intrinsic Ventures: the Allan Building at 2455 SE 11th Ave and SE 8th & Division building at 2445 SE 8th Ave.

The Willamette Week reported that the new Multnomah County Central Courthouse comes with a solar-energy system that will take more than a century to pay for itself.

The Portland Business Journal took a first look at the Jupiter NEXT hotel, which is scheduled to open next month.

Affordable housing developers face rising costs. The Willamette Week reports that Mayor Ted Wheeler isn’t plugging the hole.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Weekly Roundup: Jupiter Hotel Expansion, ROSE/APANO Mixed Use, Amazon HQ 2, and more

A ground breaking ceremony was held for SERA Architects’ ROSE/APANO Affordable Mixed Use Development

The Business Tribune reported on the ground breaking for the ROSE/APANO Affordable Mixed Use Development at SE 82nd & Division. The building will include 48 residential units and commercial space.

Eater Portland reported that Dig A Pony co-owners have announced a new bar inside the Jupiter Hotel Expansion.

The Oregonian looked at Portland’s proposal to Amazon for its second headquarters project. Sites identified as available for development include the Post Office Site and the Ankeny Blocks.

Taller buildings in downtown Portland were called “inevitable” in a KATU report.

The first tenants for the Field Office have been announced, reports The Oregonian. The Children’s Garden and marketing agency Adpearance will move into the development, currently under construction on NW Front Ave.

Weekly Roundup: Jupiter Hotel, Jasmine Block, Neuberger Hall, and more

Jupiter Hotel

Construction is underway on the Jupiter Hotel expansion, designed by Works Progress Architecture.

The DJC wrote about construction progress* at the Multnomah County Central Courthousewhich is being built on the site of a former highway ramp.

The Oregonian wrote about the $5 million gift given to Portland State University, which will enable the Neuberger Hall Renovation to move forward.

Portland State University will receive $51 million in state bonds, writes the Portland Business Journal. The money will enable the Jasmine Block development at SW 4th & Montgomery to move forward.

The DJC published photos of the under construction Jupiter Hotel on E Burnside St.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Focus: Our 25 Most Popular Posts of 2016

5 MLK

The post about 5 MLK’s first Design Advice Request hearing was Next Portland’s most popular post of the year. [See this follow up post for the most recent images of the project.]

2016 is the second full year Next Portland has been in operation. With development showing no signs of slowing down it’s been a busy year. We published 234 new blog posts, and our development map now has almost 800 unique projects listed (including completed and cancelled projects). Over the course of the year the site had almost 900,000 page views; up 84% over 2015.

6 of the articles that made the top 25 viewed posts were published in 2015; 2 were published in 2014. Our second most popular article from the 2015 list, about the Goat Blocks, was still the fourth most popular article of 2016 despite having been written in December 2014. Our most popular post of 2015, about the 25 tallest buildings planned in the city, remained in the list at third place, and was just beaten out in popularity by the updated 2016 list. Two pioneering Cross Laminated Timber buildings, Carbon12 and Framework, took up three places on the list.

In reverse order, here are our 25 most popular posts of the year:

  1. Under construction in the Pearl – The Abigail (images)
  2. City Council overturns Design Commission; Jupiter Hotel will be clad in Asphalt Shingles (images)
  3. Design Reviewed for High-Rise Timber Building Framework (images)
  4. Focus: 25 Office Buildings Planned for Portland
  5. Design Commission approves 15 story building at 4th & Harrison (images)
  6. Burnside Bridgehead, pt I: Block 75 (images)
  7. 1510 NE Multnomah has third Design Advice hearing (images)
  8. Design Commission approves Block 20 condominium tower (images)
  9. 17 story tower planned for Fishels Furniture site (drawings)
  10. Works Partnership present 19 story Burnside Bridgehead tower to Design Commission (images)
  11. 30 Story Tower Planned at SW 11th & Washington
  12. Burnside Bridgehead, Pt II: Block 67 (Images)
  13. Design Commission approves affordable housing on St Francis Park (images)
  14. Under Construction: Pearl Block 136 (images)
  15. North Pearl High-Rises, Part II: The Overton (images)
  16. Focus: 20 new hotels proposed for Portland
  17. Design Approved for Framework, America’s Tallest Timber Building (images)
  18. Lloyd Cinemas Parking Lot Redevelopment Approved (images)
  19. Portland Housing Bureau announces Super NOFA projects (images)
  20. Under Construction: The Porter hotel (images)
  21. Design Approved for First Tall Cross-laminated Timber Building in America (images)
  22. LOCA @ the Goat Blocks (images)
  23. Focus: 25 Tallest Buildings Planned or Under Construction (2015)
  24. Focus: Portland’s Tallest Planned Buildings (2016)
  25. 5 MLK receives Design Advice (images)

Metro Reports: Jupiter Hotel, 1201 NW Naito, Kellogg Middle School and more

Jupiter Hotel

A building permit was issued for the Jupiter Hotel expansion

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Fosler Portland Architecture for a project at SW 36th Ave & Troy St:

New Mixed Use Building on vacant sloping lot. First 2 stories office and retail top 2 stories will have 4-8 apartments.

Early Assistance has been requested by Michael Green Architecture for a project at 1053-1201 NW Naito Parkway:

New 7-18 story Apartment Building – Timber (CLT) Construction – 2 levels for parking. 3 Development plans, some affordable housing proposed.

Early Assistance has been requested for a project at 1945 NW Raleigh St:

New 4 story 18 unit apartment building.

Early Assistance has been requested by Encore Architects for a project at 1337 E Burnside St:

The project consists of a six-story approximately 200 unit apartment building with below-grade parking for approx. 118 vehicles.

Early Assistance has been requested by TVA Architects for a project at 2880 SE Division St:

4-story mixed-use multi-family apartment project with ground floor leasable space, lobby, MEP/Utility/Service space, and three elevated apartment floor levels (combo of studio and one-bedroom units for a total of 67 units). Onsite surface parking will be provided. They may need an adjustment to parking stall width.

Early Assistance has been requested by Oh Planning + Design for a project at Kellogg Middle School

Redevelopment of middle school (Kellogg Middle School), either by new addition and renovations – or replacement of 100,000+ sq ft school.

A Pre-Application Conference has been scheduled by Köz Development for a project at 1111 NW 16th Ave:

New 95 studio unit apartment building, no parking proposed. A eco roof for stormwater management with flow through planters in the courtyard to manage impervious areas outside of the roof.

A Pre-Application Conference has been scheduled for a project at 1500 NE Irving St: 

Proposal is new construction of a four story apartment building with 60 units with tuck under grade level parkiing. Existing parking lot to be re-striped to provide parking lots for both existing office and new apartment building.

A Pre-Application Conference has been scheduled by Work Progress Architecture for a project at 330 SW 10th Ave:

New 23 Story Mixed Use Building – Existing Historic Federal Exchange Building to remain on site.

A Pre-Application Conference has been scheduled by TVA Architects for a project at 820 SE Alder St:

New multi-family residential development with ground floor retail and underground parking garage. 6 stories (67′ tall) with a combo of studio, 1 and 2 bedroom living units.

A project at 1650 NW Naito Parkway has been submitted for Type III Design Review by TVA Architects:

new 17 story apartment building. 258 residential units are proposed. The first floor will have both residential and parking. There are 192 underground parking spaces. The access for the parking would be from NW Naito. Two loading spaces are proposed. The property will be divided to create a 79,700 square foot site for this development.

A project at 306 SE 8th Ave has been submitted for Type III Design Review by SERA Architects:

Demo existing building, new development of 7 story 120 unit residential apartment building with ground floor retail and underground parking. 2 modifications , bike parking width &size of parking stalls.

A foundation permit was issued for 1133 SW Market St:

STR – to include Structure, Shoring, Ground Improvements and MEP underground

A building permit was issued to Studio3 Architecture for a project at 4030 N Vancouver Ave:

New mixed use building, 5 stories with ground floor commercial use and 49 apartment units above

A building permit was issued to Works Progress Architecture for the Jupiter Hotel Expansion:

Construct new 6 story mixed use building, includes event space and restaurant, floors 3-6 are hotel rooms, no parking. Site work and stormwater management included.

City Council overturns Design Commission; Jupiter Hotel will be clad in Asphalt Shingles (images)

In a rare move, the Portland City Council has overturned a decision by the Design Commission. In April the Design Commission approved an expansion of the Jupiter Hotel, designed by Works Partnership. The new building was originally proposed to be clad in asphalt composition shingles, but the Commission insisted that the building should instead be clad in metal shingles. The approval was then appealed to City Council, who removed the condition of approval, therefore allowing the asphalt shingles as the finished material.

The new 6 story building will add 67 rooms on a site directly to the east of the existing hotel. The ground floor would include restaurant and retail spaces facing onto E Burnside, along with a lobby and reception located at the corner of the site. An upper level lounge, banquet hall and exterior garden are proposed for the second floor. Guest rooms would be located in floors 3 to 6. No new vehicular parking is proposed.

Jupiter Hotel

Read More

Jupiter Hotel expansion approved by Design Commission (images)

The Design Commission has approved an expansion of the Jupiter Hotel designed by Works Partnership. The new 6 story building will add 67 rooms on a site directly to the east of the existing hotel. The ground floor would include restaurant and retail spaces facing onto E Burnside, along with a lobby and reception located at the corner of the site. An upper level lounge, banquet hall and exterior garden are proposed for the second floor. Guest rooms would be located in floors 3 to 6. No new vehicular parking is proposed.

Jupiter Hotel

Read More