Metro Reports: Tesla Showroom, Restoration Hardware, Castlegate Apartments and more

Restoration Hardware

The NW 23rd Ave Restoration Hardware, as shown at its third Design Advice Request hearing

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Tesla Motors have requested Design Advice and scheduled a Pre-Application Conference for a project at 4330 SW Macadam Ave:

Take existing warehouse building and turn it into vehical sales, service and delivery center of Tesla vehicles.

Winterbrook Planning have requested Design Advice and scheduled a Pre-Application Conference for a renovation to One Pacific Square:

Renovation of existing One Pacific Square. Expanding ground floor lobby to include storefront commercial on Street frontages. New Landscaping.

Early Assistance has been requested for a project at 2645 SE 50th Ave:

New residential apartment building, with underground parking.

Early Assistance has been requested for a project at 4515 NE Fremont St:

Mixed use development to include 50 residential units over retail space and on-site parking.

Anrkom Moisan Architects have requested Early Assistance for a project at 6049 N Interstate Ave:

New 5 story apartment building. 129,772 sq feet 180 units. Tuck under parking with 60 spaces.

Early Assistance has been requested by Fosler Portland Architecture for a project at 1485 NE Alberta St:

New 4-story apartment building with commercial space, lobby on ground floor, 17 apartments abvoe.

Works Partnership have requested Early Assistance for a project at 4235 SE 17th Ave:

Project is proposal for two story residential with ltd retail on grd floor. Needed is written clarification on setback and landscape requirements to continue development.

Strata Land Use Planning have scheduled a Pre-Application Conference to discuss a project at 606 NE 20th Ave:

TYPE 3 DESIGN REVIEW- To develop this site with a 6-story, 54 unit residential building. Ground floor parking and 1 retail space.

Studio 3 Architecture have scheduled a Pre-Application Conference to discuss a project at 751 N Cook St:

New mixed use 5 story building with 50 parking spaces in rear. Commercial & residential units on ground floor, residential units above. Designed to meet Community Design Standards

Anrkom Moisan Architects have submitted the NW 23rd Ave Restoration Hardware for Design Review:

Design Review with 5 modifications to build a new 3-story retail development with rooftop terrace and basement parking garage.

A series of building permits are under review for the Castlegate Apartments at 3001 NE 148th Ave:

Construct new 3 story ( 8 unit) apartment building; building 1 of 7

Construct new 3 story ( 8 unit) apartment building; building 2 of 7

Construct new 3 story ( 8 unit) apartment building; building 3 of 7

Construct new 3 story ( 8 unit) apartment building with attached office building; building 4 of 7

Construct new 3 story ( 8 unit) apartment building; building 5 of 7

Construct new 3 story ( 8 unit) apartment building; building 6 of 7

Construct new 3 story ( 8 unit) apartment building; building 7 of 7

A building permit is under review for a project at 1640 SE Tacoma St:

New 4 story apartment building with 44 units and green roof. Ground floor contains (1) retail space and parking garage. No occupancy for retail space on this permit, interior trash area at parking garage level

A building permit is under review for a project by YBA Architects at 1208 SE Ankeny St:

Construct new 4story with basement, 27 unit apartment building; with associated site work

A building permit was issued to LRS Architects for the Cedar Sinai Park Addition at 6125 SW Boundary St:

Renovation of existing 53,000 sf nursing home with a 44,000 sf addition, new parking lot and site improvements

A series of building permits were issued to Jivanjee Circosta Architecture for a project at 14224 E Burnside St:

Building 1: new 3 story (13 unit) apartment buildilng with laundry and common room; with on site parking, site improvements and site amenities (sports court, play area, and court yard)

New 3 story (12 unit) apartment building

New 3 story (9 unit) apartment building

A building permit was issued to CIDA Architects for a project at 5624 SE 22nd Ave:

Construct new 3 story 15 unit apartment building; 5 units on each fl; with associated site work; and trash enclosure; sprinklers to be standard 13

A building permit was issued for a project at 1803 N Lombard St:

Construct new 3 story apartment building, 12 units, main floor single level units, 2nd floor units have upstairs, trash enclosure attached to east side of building, associated site work included

A building permit was issued for a project at 7007 NE Cornfoot Rd:

New 420,791 sf semi-conditioned shell building and associated site work. Tenant improvements will address conditioned spaces (comments)

Weekly Roundup: The Woods, MAC Block 7, Post Office Redevelopment and more

The Woods by SolTerra

The Woods by SolTerra

The Design Commission has approved The Woods by developer SolTerra, reported the Portland Business Journal. The N Williams Ave project will include 50 residential units and almost 5,000 sq ft of retail space.

The James Beard Public Market has a new executive director. Fred Granum will replace Ron Paul, who has stepped down due to health reasons.

BikePortland wrote about the potential for protected bike lanes on NW Lovejoy and Broadway, which could form a part of the Post Office Redevelopment.

The Portland Chronicle wrote about a 1923 house in Sellwood at 5624 SE 22nd Ave that was recently torn down to make way for a 3 story apartment building with 15 units.

KGW covered a protest by neighbors of a planned apartment building at 2605 NE 7th Ave. The project has received a building permit, and construction will start soon.

The NW Examiner reported [PDF – page 11] that activity on MAC Block 7 is starting up again. The apartment building will require a change to the zoning on the site, because it will include commercial parking for members of the Multnomah Athletic Club.

Portland is falling behind its goals for affordable housing in North and Northeast Portland, according to a City report covered by The Oregonian.

Metro Reports: 1400 NW Raleigh, 811 Stark, Q21 and more

Q21 by YBA Architects

Q21 by YBA Architects

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

 

Hennebery Eddy Architects have requested Early Assistance for a renovation of a warehouse at 2215 NW Quimby St:

Improvement to existing building to include TI, seismic upgrades, exterior entry & storefront upgrades and non-conforming site upgrades

Early Assistance has been requested for a project at 7116 SE 16th Ave:

Small mixed use building with retail, private parking on grd floor for the owner. Apartments on second and third floors and owner’s residence on top floor.

Merryman Barnes Architects and Encore Architects have scheduled a Pre-Application Conference to discuss a proposed building at 1400 NW Raleigh:

Pre-Application Conference to discuss a Type III Design Review for a 6-story, 146-unit residential project with a small ground-level retail space, 93 parking spaces and 231 bike parking spaces.

Allusa Architecture have applied for a building permit for a project at 1932 SE Madison St:

Construct new 2 story 4 plex; site work to include new flow thru planter, short term bicycle, new walk ways, new detached trash enclosure 72sf

CIDA Architects have applied for a building permit for a project at 5624 SE 22nd Ave:

Construct new 3 story 15 unit apartment building; 5 units on each fl; with associated site work; detached bike enclosure and trash enclosure

Potestio Studio have applied for a building permit for a project at 8417 SW 24th Ave:

New 4 story 15 unit apartment building

Works Partnership have applied for a building permit for 811 Stark, which was recently approved by the Design Commission:

New 31,500 sf mixed-use building with retail space on the first floor, and an expected mix of creative office uses on the upper floors. Work includes 3-stories of wood glulam post and beam construction over a 1-story concrete podium, with ground floor retail, parking, lobby and building services

A building permit was issued to YBA Architects for the partial demolition of a warehouse, which will incorporated into their Q21 project:

Partial Demo building, removing foundation, keeping some walls of existing structure