Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.
Early Assistance has been requested by Sinan Gumusoglu Architecture for a project at 5340 SE Milwaukie Ave:
Current code: Build a new 19 unit 5 story residential building with 17 surface parking stalls. L shaped building will replace existing 8 unit apartment building. Drywell, located in parking lot, will be used to treat storm water. Community design standards will be used.
Early Assistance has been requested by Sinan Gumusoglu Architecture for a project at 432 NE Simpson St:
New 12 unit 3 story apartment building, 6 one bedroom and 6 2 bedroom units. No parking provided. Looking to meet Community Design Standards.
A project at 1604 E Burnside St has been submitted for Type II Adjustment Review by Woodblock Architecture:
Construction of a new five story, 90 room hostel withh ground floor restaurant, coffee and bar, and public rooftop patio. Adjustment 1. 33.130.210 Max Height, Adjustment 2. 33.266.310 Loading space, Adjustment 3. 33.130.215 setbacks
The Clay + Tiffany Apartments at 1110 SW Clay St have been submitted for Type III Design Review by SERA Architects:
New mixed use building for student housing. Commercial space is proposed on the ground floor. The sixteen story building would have 260 units. There would
be a mix of studios, and one and two bedroom units. No on-site parking is proposed. A loading space is proposed with access from SW Clay. One modification requested to bike rack requirement (33.266.220.C3).
The renovation of the Modish Building at 333 SW Park Ave has been submitted for permit review by Beebe Skidmore Architects
Shell and core only seismic upgrade; storefront redevelopment; addition of new 5th floor and roof deck; new roof; accessibility improvements
A four-building development at 1944 SE Tacoma St has been submitted for building permit review by Works Progress Architecture:
New three-story, three unit mult-family structure (1 of 4, with 17-194721,-24,-27 CO)
New three-story, three unit mult-family structure (2 of 4, with 17-194710,-24,-27 CO)
New three-story, three unit mult-family structure with trash enclosure. (3 of 4, with 17-194710,-721,-727 CO)
New three-story, three unit mult-family structure (4 of 4, with 17-194710,-721,-724 CO)
Hoodworks at 5615 SW Hood Ave has been submitted for building permit review:
New 4 story office building with below ground parking, includes associated sitework *** w/ 17-193220-mt ***
Tree Farm at SE 3rd & Morrison has been submitted for building permit review:
New 6-story commercial building; 1st floor future retail tenant, lobby and trash room; floors 2-6 f2 occupancy; and associated site work *** mechanical permit 17-196436mt ***
A project at 2922 SE 82nd Ave has been submitted for building permit review by Mackenzie:
Construct new 3-story self storage building; 1st floor. 3 separate future tenant spaces and storage; 2nd & 3rd floor storage only; and associated site work *** mechanical permit 17-196247mt ***
The first building permit for the Grant High School Modernization project was issued to Mahlum Architects:
Abate and demo 1959 library, lower level cafeteria addition, below grade fan room. Abate and selective demo original 1923 admin building, 1925 north wing, 1927 south wing, 1927 auditorium, and 1952 west addition to north wing. Shoring and tiebacks with associated waterproofing at west facade of 1923 admin bldg. Associated civil work (excaation of courtyards), construction staging pad, fill at 1956 gym, erosion control and tree removal
Building permits were issued to Green Hammer for Tillamook Row:
Construct new 3 story (5) unit apartment building; associated sitework and detached trash enclosure under 120sq ft
Construct 2 story (3) unit apartment building with attached bike storage area
Construct 3 Story (5) Unit Apartment Building
Construct 3 story (3) unit apartment building
A building permit was issued to SERA Architects for the Modera Davis:
Partial – excavation, shoring, concrete structure and structural embeds from two levels below grade to L13 (roof) also includes all utility connections and routing of utilities below the P2 slab (basement). and all plumbing installation to L13. includes grease interceptor