The Under Armour building at 2815 SW Barbur, as approved last year.
Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.
Bora Architects have requested Design Advice for an addition to 2815 SW Barbur Blvd, Under Armour’s new Portland base:
Proposed addition to building that is currently undergoing a change in use.
Otak Architects have requested Early Assistance for a project at 5416 NE 14th Pl:
Proposal is to build a four story wood framed multi-family apartment building with 15 dwelling units and five parking spaces.
Early Assistance has been requested for a project at 11144 NE Sandy Blvd:
Proposed 4-story Motel 6 with surface parking.
Holst Architecture have requested Early Assistance for a project at 3403 N Mississippi Ave:
Proposed mixed-use housing project with approximately 175 units. Will meet community design standards.
Early Assistance has been requested by Brett Schulz Architect for a project at 121 N Beech St:
Development of a new mixed use building 20+ apartments & retail space – no parking proposed
Early Assistance has been requested by Works Partnership for a project at 110 SE Washington St:
Proposed 8-story mixed-use office and retail building.
Early Assistance has been requested by Ankrom Moisan Architects for a project at SW Broadway and 9th:
Multi-family dwelling building with parking below.
A Conditional Use Review has been submitted for a project at 1120 SE Madison St:
Convert existing building from Warehouse and Industrial Service Use to an Office Use in the IG1 zone.
A Design Review has been submitted by Skylab Architecture for alterations to Yard:
alterations to previously approved design review for Block 67 (the Yard)
Mackenzie have submitted alterations to the Iron Fireman building at 4784 SE 17th Ave for building permit review:
Core and shell build out of 78,246 sf of 108,066 sf building, for future tenants; add new interior walls to create 10 tenant spaces, lobby area, restrooms, bike storage area; and new stairs that lead to mezzaninne; voluntary seismic upgrade. No occupancy this permit. Separate tenant improvement permits required.
A building permit is under review for 606 NE 20th Ave:
New construction of a 6-story 59unit apartment building including parking and retail on level 1. Levels 3-6 contain a mix of apartment including studios, 1 bedroom, and 2 bedrooms. Level 6 also has an amenity deck along the west property line. Retail space on level 1 is to be built out under a separate permit with no occupancy this permit. Demo of existing building to be under separate permit. Demo plans included for reference only.
Studio 3 Architecture have submitted at a project at 7220 N Burlington Ave for building permit review:
Construct new 2 story (24 unit) apartment building with associated site work
A building permit is under review for a project at 6404 N Montana Ave:
New 6 unit, 3 story apartment with associated site work and landscaping
A building permit was issued for a project at 3423 SE Hawthorne Blvd:
New five-story, 28-unit multi-family apartment complex; on site bike parking; no on-site parking; drywell, landscaping and utilities, trash enclosure on adjacent lot