Focus: Portland’s Tallest Planned Buildings (2016)

Image from the Discussion Draft of the Central City 2035 Plan (Bureau of Planning & Sustainability).

Image from the Discussion Draft of the Central City 2035 Plan, showing a possible development scenario approximating future growth in the Pearl District over 20 years (Bureau of Planning & Sustainability). At least two of the sites shown as potentially developable have current proposals on them.

It is just over a year since Next Portland last did a roundup of the tallest buildings planned or under construction in Portland. At that time, we counted 25 buildings over 100′ in height planned. Today we count 40. Given the length of time it takes to complete a high rise building, many of the buildings on the 2016 were also on the 2015 list. Four buildings are no longer on the list this year, due to having been completed: Block 17, Pearl West, the Aster Tower and Park Avenue West. Seven buildings that were still in the design phase last year are now under construction. No building on last year’s list is known to have been cancelled.

Read on to see our complete list. Where possible, the heights given are the building height as defined in the Portland Zoning Code and published in the Design Commission’s Final Findings. In some cases the heights have been estimated.

Read More

Weekly Roundup: 72Foster, University of Portland residences, 1320 Broadway and more

5350 N Willamette Blvd by Soderstrom Architects

New student housing at the University of Portland, by Soderstrom Architects

Eater PDX wrote that restaurant Touché is “in a weird sort of limbo” as they wait for news about the fate of their building. The historic Firehouse #3 may be demolished to make way for a 12 story building at 505 NW 14th Ave.

The Daily Journal of Commerce published photos of an under construction residence hall at the University of Portland. The building at 5350 N Willamette Blvd by Soderstrom Architects will include “three above-grade floors of student living units, a ground-floor student worship space, student lounge, and office/retail space.”

The Foster Powell blog wrote about the 72Foster affordable housing development, which will include 108 housing units and commercial space lining SE Foster.

The Oregonian reported that Portland area rents rose 13 percent over the past year, however noted that “a wave of new construction slowed the price appreciation a little since the fall and caused the vacancy rate to tick upward.”

Mayor Hales has proposed an amendment to the Comprehensive Plan that would prohibit new drive throughs in the Central City and limit them elsewhere, reports the Willamette Week.

A Vancouver, WA have donated $12 million to OHSU, which will go towards the patient housing being built as part of the Center for Health and Healing South project.

An 86 year old funeral home may be demolished, reported the Portland Chronicle. The building is located at 20 NE 14th Ave, a site where the Bureau of Development Services recently received an Early Assistance application to discuss a six-story mixed-use building with 190 residential units.

Elemental Technologies will move their headquarters into the 1320 Broadway building. The building was formerly home to The Oregonian, and is currently in the middle of a major renovation.

Portland Architecture talked with Stuart Emmons, an architect who is running against incumbent Steve Novick for a seat on the Portland City Council.

Portland International Airport is reevaluating its $98 million Concourse E Expansion, according to The Oregonian. Portland based Horizon Air recently ordered 30 Embraer E175 jets, which can be board via jetbridges. The airport’s original expansion plan was designed for the Bombardier Q400 plans Horizon currently flies, which typically board from the ground.

KPTV reported that a demonstration was held by the group “Stop Demolishing Portland” outside 3336 SE Belmont, which is set to be redeveloped with a three story mixed use building.

Coworking and shared office company Regus opened a space in the Pearl West office building this week, according to the Portland Business Journal.

The St Francis Park Apartments received a $9.5 million loan from KeyBank, reported the Portland Business Journal. The Central Eastside building will include 106 units of affordable housing.

Thru Magazine wrote about a Design Week Portland panel discussion about the future of the Central Eastside. The event was hosted by Bora Architects, who showcased their Water Avenue Yards concept.

The PSU Vanguard reported that the Portland State Vikings celebrated a groundbreaking for the PSU Viking Pavilion ahead of their annual spring game.

 

Weekly Roundup: Middle Middle Housing, Low Density Islands and more

Types of "missing middle" housing

Types of “missing middle” housing. Image by Daniel Parolek of Opticos Design.

Affordable housing developers and service providers are calling on the city to legalize the development of “missing middle” housing, according to Bike Portland. An amendment to the Comprehensive Plan that would make it possible to develop housing types such as duplexes, triplexes, internal home divisions and two-story garden apartments near designated centers is currently being debated by the City Council. The Portland Tribune reported that the amendment is facing opposition from groups such as the United Neighborhoods for Reform.

The Willamette Week reported that despite Portland’s push for new housing, the proposed Comprehensive Plan leaves islands of low density zoning along corridors such as inner Division, Hawthorne and Belmont.

The Business Tribune wrote about the “new vision for Lents”, including Oliver Station by Ankrom Moisan Architects. The mixed use development will replace the New Copper Penny bar, and will include 126 units of affordable housing and unit 19 units leased at market rates.

Grocery store Green Zebra opened its second store at Hassalo on Eighthreported the Portland Business Journal.

Wacom has moved its North American headquarters from Vancouver, WA into the Pearl West office building. The Portland Business Journal published photos of their new space.

Portland Architecture published an interview with mayoral candidate Jules Bailey.

The Portland Housing Bureau announced the largest funding award in its history. $47 million will be allocated to eight affordable housing projects, including six new building with 585 units.

BikePortland wrote that the new Multnomah County Courthouse could include a raised bike lane at the approach to the Hawthorne Bridge.

The Portland Tribune wrote about the potential loss of Fire Station #3 in the Pearl, which could be torn down to make way for a 150 unit development at 505 NW 14th Ave.

Weekly Roundup: Broadway Tower, Oliver Station, Touché Restaurant and more

Broadway Tower

The Broadway Tower, which will include a Radisson RED hotel

A 12 story residential development at 505 NW 14th Ave could involve the demolition of three buildings in the Pearl, including Fire Station #3, reported The Portland Chronicle. The building is currently home to Touché Restaurant & Bar.

The Oregonian reported that Radisson RED will be the hotel tenant for the 19 story Broadway TowerThe new brand doesn’t include front desks, and instead uses technology “to simplify the experience and provide efficiencies including keyless guest room entry.”

The Willamette Week reported that Palindrome Communities have closed on the purchase of the New Copper Penny nightclub in Lents. The purchase will allow Oliver Station to move ahead. The project will include approximately 126 affordable apartment units and 19 market rate units.

BikePortland wrote that average apartment building costs fell sharply during the period in which a large number of apartments without parking were being built. After the City Council added minimum parking requirements in 2013 construction costs rose again.

Following up on a previous article, Portland Architecture wrote about the selection process for the Multnomah County Courthouse and SRG Partnership’s design for the new building.

The Portland Business Journal wrote about how developers are betting more on bikes — and seeing big benefits.

Metro Reports: OHSU CHH South, 3730 SE Powell, 505 NW 14th and more

OHSU Center for Health and Healing South

The OHSU Center for Health and Healing South

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Early Assistance has been requested for a project at 8106 N Interstate Ave:

Proposal is for a new five story building with 120 apartment units including 64 group living units with shared kitchens. Proposed 33% parking ratio minus a 25% bike parking reduction will be provided in an undergrd garage.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 505 NW 14th Ave: 

Pre-Application Conference to discuss a Type III Design Review for a new 150-unit, 12-story, market-rate apartment building with ground floor retail and basement parking. Existing building on site is listed on the Historic Resource Inventory.

Woofter Architecture have applied for the first building permit required for the PSU Viking Pavilion:

partial – demolition of eastern half and selective demolition on western half of the existing building, relocation of existing gas meters, sewer line and hydrants, interior improvements including finishes, plumbing, electical and mechanical duct work to unoccupied weight room

Studio3 Architecture have submitted a project at 3730 SE Powell Blvd for building permit review:

Construct new 3 story (30 unit) apartment building with associated site work and detached. Brooker property.

A building permit is under review for a project at N Holman and Interstate:

Construct new 3 story (6) unit apartment building; with associated site work; detached trash enlosure

A building permit was issued to Mentrum Architecture for a project at 5350 SE 18th Ave:

Construct 3 story apartment building, 18 units, 6 per floor, attached covered trash enclosure, flow through planter and other associated site work

The first building permits were issued to ZGF Architects for the OHSU Center for Health and Healing South:

Site demolition, excavation, and tower crane foundation and disconnect site irrigation system.

FND 1 : Piles, partial 2 level basement in NW corner (exterior walls only, matt slab @ level B2), tunnel @ level B2 connecting to subgrade parking at block 29 and shoring for all four corners (there is no utility work under this permit.)