Weekly Roundup: Porter Hotel, Towne Storage Building, Providence Park, and more

Construction is well underway on the Porter Hotel in Downtown

The Portland Chronicle wrote about the demolition of a 1930 funeral home. The site at 80 NE 14th Ave is being redeveloped as a six-story mixed-use building containing 190 residential units.

Eater PDX reported that Touché Restaurant was set to close this Sunday after 20 years in the Pearl. The historic firehouse that housed the restaurant will be renovated as part of the Modera Glisan development.

The Portland Business Journal reported that software company Autodesk will move 200 employees from Lake Oswego to the Towne Storage Building in the Central Eastside.

The DJC wrote about the massive number of new hotel rooms coming online, including at the AC Hotel, Convention Center Hotel, The Woodlark and The Porter.  If all hotel projects currently proposed get built they “would expand Central Portland’s room count by 35 percent by 2020.”*

The Oregonian reported that the Portland Timbers’ proposed expansion of Providence Park drew City Council support at a hearing held last week.

As Esco Corp. winds down operations in NW Portland The Oregonian reported that its 15 acre site is being prepared for redevelopment.

Portland for Everyone wrote about the eleven bills aimed at tackling housing prices that are still alive in the legislature.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: Sellwood Bridgehead, 80 NE 14th Ave, 416 NW 5th, and more

A building permit was issued for Alliance Residential’s project at 80 NE 14th Ave

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by Ankrom Moisan Architects for a project at 416 NW 5th Ave:

New 15-story, 160,000 gsf mixed-use residential development with basement parking. 430 NW 5th Ave is a non-contributing site; 416 NW 5th Ave is a contributing site both in New Chinatown/Japantown Historic District.

Early Assistance has been requested by LHW Architecture for a project at 12036 SE Pine St:

Construction of a 3-story residential apartment building. They are planning to meet community design standards.

A Pre-Application Conference has been scheduled by Scott Edwards Architecture to discuss a project at 1921 SE 3rd Ave:

Proposed 7 story, 117,960sf mixed used industrial office building, with 45 below grade parking spaces.

7 Southeast Stark has been submitted for building permit review by Works Progress Architecture:

New core and shell development of 5 story CIP concrete slabs and columns, 5 story steel frame with composite steel floor decks, mixed-use with ground floor industrial service, 6 floors of commercial parking and 4 floors of industrial and traditional office.

A building permit was issued to Edge Development for a project at 4310 N Maryland Ave (previously 1329 N Skidmore St):

New 3 story apartment building with 10 units.

A building permit was issued for the Sellwood Bridgehead apartments at 8220 SE 6th Ave:

Construct new, 5 story apartment building with 119 units, below grade parking, associated site work included

A building permit was issued for a project at 80 NE 14th Ave:

New 6 story multi use 197 unit apartment building, retail and living on the 1st floor, temporary shoring1200-C

Metro Reports: 419 SW Washington, Field Office, Grand Belmont, and more

Grand Belmont

Grand Belmont, as presented to the Landmarks Commission for Design Advice earlier this year

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

GBD Architects have requested Design Advice for 108 SW 3rd Ave:

Design Advice Request for a new 6-story mixed-use building with approx. 8,925 SF of retail, 133 market-rate apartments and 63 off-street parking stalls on one level of structured underground parking.

C2K Architecture have requested Early Assistance for a project at 3434 NE Sandy Blvd:

Renovation of existing building to include retail and commercial uses along Sandy Boulevard and development mechanic’s shop into commercial bakery. Existing parking to be converted to public amenity space.

Early Assistance has been requested for a project at 10737 NE Fremont St:

Develop the parcels into condos. The house on the west parcel will be demo’d. The house on the east parcel will remain.

BAMA Architecture and Design have requested Early Assistance for a project at 15536 NE Glisan St:

Multi-phase, multi-family development on multiple lots. Looking at possibly consolidating lots to help minimize interior setback requirements. They are hoping to meet community design standards.

Early Assistance has been requested for a project at 12335 SE Division St:

Get space self-storage facility with associated parking, utilities, and landscaping.

LRS Architects have requested Early Assistance for a project at 2310 SE Hawthorne Blvd:

New 4 story mixed-use building including 61 living units over retail and 23 parking stalls.

ZGF Architects have scheduled a Pre-Application Conference to discuss a project at 419 SW Washington St

Pre-application conference to discuss a Type III Design Review for a new 30-story, mixed-use tower.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 306 SE 8th Ave:

Demo existing building, new development of 6 story 100 residential apartment building with ground floor retail and underground parking.

Waterleaf Architecture have scheduled a Pre-Application Conference to discuss a project at the Lloyd West Anchor:

Renovation of existing 3-story, 150k SF anchor into multi-tenant use.

A Pre-Permit Zoning Plan check has been requested for a project at 20 NE 14th Ave:

6 story multi-family apartment building with parking for 132 vehicles

Vallaster Corl Architects have submitted Grand Belmont for Type III Historic Resource Review:

22-story high-rise residential project- of approx 212,000 SF above grade.

Holst Architecture have submitted 1510 NE Multnomah for building permit review:

New mixed use, multi family apartment building over parking and retail space

Bldg 2 – New Mixed Use Multi Family building with apartments over parking and retail space

A multiple building project at 6702 SE 72nd Ave has been submitted for building permit review:

New construction of 3 story triplex

New construction of 3 story, 6 unit apartment building with site improvements

New construction of 3 story, 6 unit apartment building with site improvements

A multiple building project at 7513 N Olin Ave has been submitted for building permit review:

New construction of one of two 3 story 6 unit apartment buildings

New construction of two of two 3 story 6 unit apartment buildings

The WorldMark by Wyndham at 221 SW Naito has been submitted for building permit review by SERA Architects:

New 75 unit, 6 story vacation ownership. 5 over 1 construction

The MLK.Mason West apartments at 4119 NE M L King Blvd have been submitted for building permit review:

New 6 story apartment building with 112 units and tuck under parking.

A project at 24 NE 60th Ave has been submitted for building permit review:

Construct new 4 story 14 unit apartment building with parking on main fl and associated site work

The George Besaw Apartments at 2301 NW Savier St have been submitted for building permit review by GBD Architects:

New construction of new mixed use 4 story apartment building containing 51 residential units, with retail and services on the ground floor

A second building at the Garlington Center has been submitted for building permit review by Scott Edwards Architecture:

Construct new 2 story building for new clinic associated site work

The Home2 Suites by Hilton @ Portland Airport has been submitted for building permit review by JRA Architecture & Planning:

Construct new 4 story 99 rooms hotel with indoor pool and exercise room; associated site work and new parking

A foundation permit was issued to Hacker Architects for the Field Office:

The Partial Permit scope of work includes: a) erosion control; b) ground improvements; c) shoring d) tiebacks; e) excavation and earth work; f) deep foundations; g) foundations; h) basement-level mat; i) basement walls and j) at-grade post tension slabs. Also includes all mechanical, plumbing and electirical installation up to level 1 slab. Separate MEP permits required for this work.

Weekly Roundup: 72Foster, University of Portland residences, 1320 Broadway and more

5350 N Willamette Blvd by Soderstrom Architects

New student housing at the University of Portland, by Soderstrom Architects

Eater PDX wrote that restaurant Touché is “in a weird sort of limbo” as they wait for news about the fate of their building. The historic Firehouse #3 may be demolished to make way for a 12 story building at 505 NW 14th Ave.

The Daily Journal of Commerce published photos of an under construction residence hall at the University of Portland. The building at 5350 N Willamette Blvd by Soderstrom Architects will include “three above-grade floors of student living units, a ground-floor student worship space, student lounge, and office/retail space.”

The Foster Powell blog wrote about the 72Foster affordable housing development, which will include 108 housing units and commercial space lining SE Foster.

The Oregonian reported that Portland area rents rose 13 percent over the past year, however noted that “a wave of new construction slowed the price appreciation a little since the fall and caused the vacancy rate to tick upward.”

Mayor Hales has proposed an amendment to the Comprehensive Plan that would prohibit new drive throughs in the Central City and limit them elsewhere, reports the Willamette Week.

A Vancouver, WA have donated $12 million to OHSU, which will go towards the patient housing being built as part of the Center for Health and Healing South project.

An 86 year old funeral home may be demolished, reported the Portland Chronicle. The building is located at 20 NE 14th Ave, a site where the Bureau of Development Services recently received an Early Assistance application to discuss a six-story mixed-use building with 190 residential units.

Elemental Technologies will move their headquarters into the 1320 Broadway building. The building was formerly home to The Oregonian, and is currently in the middle of a major renovation.

Portland Architecture talked with Stuart Emmons, an architect who is running against incumbent Steve Novick for a seat on the Portland City Council.

Portland International Airport is reevaluating its $98 million Concourse E Expansion, according to The Oregonian. Portland based Horizon Air recently ordered 30 Embraer E175 jets, which can be board via jetbridges. The airport’s original expansion plan was designed for the Bombardier Q400 plans Horizon currently flies, which typically board from the ground.

KPTV reported that a demonstration was held by the group “Stop Demolishing Portland” outside 3336 SE Belmont, which is set to be redeveloped with a three story mixed use building.

Coworking and shared office company Regus opened a space in the Pearl West office building this week, according to the Portland Business Journal.

The St Francis Park Apartments received a $9.5 million loan from KeyBank, reported the Portland Business Journal. The Central Eastside building will include 106 units of affordable housing.

Thru Magazine wrote about a Design Week Portland panel discussion about the future of the Central Eastside. The event was hosted by Bora Architects, who showcased their Water Avenue Yards concept.

The PSU Vanguard reported that the Portland State Vikings celebrated a groundbreaking for the PSU Viking Pavilion ahead of their annual spring game.

 

Metro Reports: Benson High School, Restoration Hardware, Holladay Park Plaza East and more

19th & Quimby

A building permit is under review for the 19th & Quimby apartments

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

SERA Architects have requested Design Advice for a project at 905 NW 17th Ave:

Type III Design Review for a new 6-8 story mixed use building with 140-190 residential units, ground floor retail and below grade parking – approximately 70 spaces.

Scott Edwards Architecture have requested Early Assistance for a project at 5045 SE Foster Rd:

Proposal is to construct a new four story mixed used building with ground floor retail and three levels of residential apartments. On-site parking of 15 stalls will be included.

Encore Architects have requested Early Assistance for a project at 20 NE 14th Ave:

New 6 story multi use 190 unit apartment building, retail and living on the 1st floor, 100 parking spaces provided.

Early Assistance has been requested for a project at 14601 SE Division St :

Demo existing resteraunt – new construction of Fred Meyer gas station with 6 dispensers, 12 fueling stations with small cashier kiosk, propane tank, air/water station, restroom/breakroom building and trash enclosure

DOWA-IBI Group have requested Early Assistance for work at Benson High School:

Master planning for modernization and addition of the existing Benson Polytech High School Campus.

A building permit is under review for NW 19th & Quimby:

New 6 story apartment bldg. w/ 88 units. PT podium with 5 stories wood frame construction above w/ on grade parking.

A building permit is under review for a project at 664 SW Grant St :

Construct new 3 story, 5 unit apartment building, no parking, includes associated site work, sloped lot

CIDA Architects have applied for a building permit for a project at 422 NE Dekum St :

Construct new 4 story, 22 unit apartment builidng, one unit is live/work, no parking, trash and bike storage at main level, includes associated site work

A building permit is under review for a project at N Failing & Vancouver:

Construct new 5 story mixed use building with below grade parking, main floor retail and 4 levels of 50 apartment units, eco-roof, includes associated site work

A building permit is under review for a project at 8636 SE 17th Ave:

Construct new 2 story mixed use building; main floor to include two tenant spaces; proposed tenant b space to be used as daycare; tenant a (no occupancy this permit) second fl to include (4) apartment units

A building permit is under review for Holladay Park Plaza East at 1300 NE 16th Ave:

New 2 story above grade 10 unit adult living apartments with 2 levels of underground parking

Ankrom Moisan Architects have submitted the new Restoration Hardware at NW 23rd & Glisan for building permit review:

New 3 story construction with basement parking garage and additional rooftop story comprising stair enclosure, open air pavilion and trellis structure