Weekly Roundup: 12 story wood building, Towne Storage, Zidell Blocks 4 & 6, and more

The proposed 12 story wood building by Beneficial State Bank at 430 NW 10th

The proposed 12 story wood building by Beneficial State Bank at 430 NW 10th

The Oregonian reported that a planned 12 story tall wood building at 430 NW 10th in the Pearl has been awarded a $1.5 million grant by the U.S. Department of Agriculture. The building by Lever Architecture for Beneficial State Bank will utilize Cross Laminated Timber, a structural system that has been proven elsewhere but has been little used in the USA. The USDA grant will help in covering the cost of getting the system approved under the building codes in place in Oregon.

Eater PDX reported that Northwest Portland institution Besaw’s will reopen in time for the holidays, at the LL Hawkins apartment building on Conway Block 296.

At Portland Architecture Brian Libby looked into the fate of Centennial Mills, and asked whether it will be the next historic landmark in Portland to be demolished.

The Portland Business Journal published the first renderings of Zidell Blocks 4 and 6. The two office buildings by Lever Architecture / GBD Architects are scheduled to go before the Design Commission for Design Advice this coming Thursday.

A major renovation and seismic upgrade is planned for the Towne Storage Building. The Portland Business Journal reported that the project will create over 100,000 sq ft of creative office space. A story in the Portland Mercury noted that 52 existing business and 180 renters with mini storage units will be evicted from the building.

A redevelopment of the former Premier Press building at 1440 Hoyt will add 4 new floors to the building, reported the Portland Business Journal. When complete the project will include 75,000 sq ft of Class A office space. A Design Review hearing for the project is scheduled for October 1st.

Mayor Hales is “bullish” on plans to buy the Post Office site in the Pearl, reported KOIN. Conceptual ideas for how the site might be developed were recently released as part of the Broadway Corridor Framework Plan.

Construction is underway on the remodel of the building formerly home to The Oregonian, originally designed by noted architect Pietro Belluschi. When reopened 1320 Broadway will include areas with ceilings up to 28′ high, reported The Portland Business Journal.

The Daily Journal of Commerce published construction photos of Riverscape Lot 8.

The Portland Habilitation Center recently completed work on an apartment complex at 17199 SE Division St, reports the Portland Tribune. By keeping costs low, the buildings were built for $65,000 a unit; far below the $200,000 a unit cost typically associated with publicly funded affordable housing. In the article Rob Justus of the PHC asks why the Portland Housing Bureau hasn’t gotten behind their alternative method for delivering affordable housing.

Weekly Roundup: Japanese Garden, Convention Center Hotel and more

Japanese Garden Expansion, as proposed in 2011

Japanese Garden Expansion, as proposed in 2011

Our weekly roundup includes stories from the last week relating to architecture & development in Portland.

The Willamette Week reported that Metro has asked state lawmakers to pass a law that would ensure the Convention Center Hotel will be exempt from a public vote.

As part of their ongoing series about the Central Eastside, The Oregonian wrote about the thriving food and drink industry in the rapidly changing area.

The Land Use Board of Appeals upheld [PDF] the City of Portland’s approval of the Conditional Use Permit for the Japanese Garden Expansion. The project will include new buildings by Japanese architect Kengo Kuma, with THA Architects acting as the local design firm.

The first images of the proposed Canopy by Hilton in the Pearl District were published by The Oregonian.

Urban Works Real Estate will be handling the leasing for the renovated 1320 Broadway building, formerly home to The Oregonian. On their blog they sneak peek at some of the updates and amenities the Pietro Belluschi designed building will receive.

The Portland Chronicle published photos of the demolition of a house at 1459 SE Ankeny St, where a new five-story mixed-use building is under construction.

Metro Reports: Riverscape Lot 8, former Oregonian building, 1335 NW 20th Ave and more

riverscape_lot_8

Every week, the Bureau of Development services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Early Assistance has been requested for a project at 3009 NE Killingsworth St:

Proposal for a mixed use building with office/commercial on the grd floor and apartments above. Current plan is for a four story building.

Urban Asset Advisors has requested Early Assistance for a project at 5134 SE Division St:

EA Appointment For Project Construction Of New Wood Three-story 14 Unit Courtyard Style Apartments. Project Will Be Constructed With Two Buildings.

Early Assistance has been requested for a project at 7805 SE 13th Ave by Lenity Architecture:

Four story mixed use apartment complex with businesses, restaurant and possible parking on the first floor and 30 apartments on the second thru fourth floors.

Deca Architecture has applied for a Historic Resource Review for a project at 637 SE Harrison St:

New two-story 820 sf footprint (total of 1640sq ft) building. Will be office or hotel (retail sales and service).

Allied Works Architecture has applied for a Design Review for the renovation of the Oregonian building at 1320 SW Broadway:

Renovation of existing full block Oregonian building

A building permit is under review for a building at 1335 NW 20th Ave by Ankrom Moisan Architecture:

New 5-story, 49 unit apartment with tucked under parking

The first building permit has been issued for the Riverscape Lot 8 apartments by SERA Architects:

Structural only for new 260 unit multi family building consiting of five stories of wood framed over two levels of concrete, 1 level of sub grade parking. Structural package includes the concrete structure from the mat slab through the level 2 concrete podium

A building permit has been issued for a building at 3620 SE Powell Blvd:

New 2-story 10,375sf office building with initial tenant improvements for upper level dental office

Weekly Roundup: Pearl West, Viking Pavilion, 1510 Technology Center and more

Pearl West

Pearl West will be the new North American headquarters for Wacom

Our weekly roundup covers the stories relating to architecture & development in Portland.

Michael Graves, the architect of the Portland Building, passed away this week at the age of 80.

Wacom announced that they plan to move their North American from Vancouver, WA to the Pearl District. They will occupy three floors and 56,000 sq ft of the under construction Pearl West office building. They will also open a retail store on the ground floor.

The developers behind the James Beard Public Market briefed Multnomah County that they are looking at realigning the Morrison Bridge ramps at Naito.

Noraneko, a new ramen shop, opens today in the Pitman II restaurant building on SE Water Ave.

The state Higher Education Coordinating Commission approved the University of Oregon’s application to start a Master of Science in Sports Product Management. The program will be based in the Block 8L building in Old Town.

OHSU has committed $7.5 million to the $50 million PSU Viking Pavilion and Academic Center, which will allow the project to move ahead.

The Portland Business Journal published photos of the 1510 Technology Center, the former PGE operations facility in the Central Eastside that has been converted into new offices for Viewpoint Construction Software.

Seattle’s Urban Renaissance Group last year bought 1320 S.W. Broadway, the former home of the Oregonian. They plan a multimillion dollar renovation of the Pietro Belluschi designed building.