Metro Reports have moved to Portland Maps Reports. Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. This post covers February 7th, 2022 to February 13th, 2022.
Revisions to the Northbound 30 Collaborative at 2135 NW 29th Ave have been submitted for a Type III Design Review by Leeb Architects:
DZ HEARING – Applicant seeks Type III Design Review for five new multi-dwelling, five-story buildings (Buildings 9-13) to a site with eight previously approved buildings (Buildings 1-8) LU 20-111860 DZM. Applicant also seeks to make changes to six of the eight previously approved buildings on the site (Buildings 1-4 and 7-8), eliminate existing Condition of Approval F and retain two of the previously approved Modifications #1 and #2. Total proposal (Buildings 1-13):219 dwelling units. 98 vehicle parking spaces (12 surface spaces). 345 long-term bicycle parking spaces (219 in units, 126 not in units) .12 short term bicycle parking spaces. All buildings contain less than 20 units, so Inclusionary Housing requirements of Chapter 33.245 will not apply. One Modification is requested: – Pedestrian Standards (PZC 33.140.240) To not provide an on-site pedestrian connection between a main entrance of Building 13 and the adjacent street which is not more than 20 feet longer or 120 percent of the straight-line distance, whichever is less. One Adjustment is requested:- Minimum Required Bicycle Parking (33.266.200.B). The standard requires 276 long-term bicycle parking spaces, or 1.5 spaces per dwelling unit, for 184 of the proposed dwelling units. The applicant requests to provide only 203 spaces (which calculates to 1.1 spaces per dwelling unit).
A Pre-Application Conference was scheduled by TVA Architects to discuss The Philip at 514 NW 9th Ave:
A Pre-Application Conference to discuss construction of a 23-story building with 337 dwelling units and approximately 3,300 square feet of retail space. Three stories of underground parking for 192 vehicle spaces will be provided. Two full-sized loading spaces are required. The proposal involves demoltion of half of the Bindery building which has a historic designation as well as the Metro building; both of which are located on the east portion of the block.
A Pre-Application Conference was scheduled by Bora Architecture & Interiors to discuss a project at 139 SW Broadway:
A Pre-Application Conference to discuss a proposed 12-story apartment building with approximately 88 dwelling units and 1,700 square feet of ground floor retail space. No parking is proposed. Trash and loading access will be from SW 8th Ave. A modification to loading standards is expected.
A project at 8416 SE Clay St was submitted for building permit review:
Single PDF – new, 3-story, 9-unit multi-family building with trash/bike room and associated site work.
A project at 11044 SW 61st Ave was submitted for building permit review:
Single PDF – new 3 story apartment building with 12 units.
A project at 9060 NE Hoyt St was submitted for building permit review:
Single PDF – new construction of 12 unit 3-story apartment building. East building – mirror image of 21-052014-CO
A building permit was issued for VC Fargo at 25 N Fargo St:
New seven story, mixed-use building, apartments on upper 4 levels, ground level includes commercial, parking garage (car stacker), storage, and common ares. Shell restaurant space on ground floor ***mechanical to be separate***
A building permit was issued for a project at 3727 S Hood Ave (previously 3723 SW Hood):
Construct new 4 story (18) unit apartment building with associated site work w/19-150813-MT