Metro Reports: Truman Apartments, The Dianne, 2913 SE Stark and more

Truman Apartments

The Truman Apartments by In Situ Architecture

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Early Assistance has been requested by J. Karman Architect for a project at 5931 SE 52nd Ave:

Early Assistance to discuss public works requirements for new one story commercial building on a site that used to be an old service station.

Early Assistance has been requested for a project at 8155 NE Air Cargo Rd:

Develop the site with 2 QSR restaurants, 1 coffee stand w/drive-throughs on all 3, and a 11mdp fuel station w/associated kiosk. Proposal includes 3 new drive accesses to the site.

Early Assistance has been requested for a project at 4806 SE 16th Ave:

Demolish existing buildings and build a self-storage facility

Early Assistance has been requested for a project at 6100 NE Columbia Blvd:

New Plaid Pantry

A Pre-Application Conference has been scheduled by Fosler Portland Architecture to discuss a project at 833 SW Naito Parkway:

Renovate night club, add partial 2nd floor and partial roof deck.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 205 NW 10th Ave:

Pre-Application Conference to discuss a Type III Design Review for a proposed new 11-14 story residential building with ground-floor retail and 96 below grade parking spaces.
No exterior elevations were submitted.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 1431 NW 17th Ave:

Proposal is for a six story market rate apartment building with below grade parking in basement.

Delta Studios Architecture & Planning have scheduled a Pre-Application Conference to discuss a project at SW College & 13th:

Proposed 5-story apartment building

A demolition permit has been issued for a building at 535 NW 11th Ave, due to be replaced by The Dianne:

Demolition of existing 1-story Jim Stevens Autobody structure

A building permit is under review for The Truman apartments at 1515 SE 44th Ave:

New construction-new 4story mixed use building with 30 residential units

A building permit is under review for a project at SE 18th & Madison:

New (12) unit 3 story apartment building with parking garage and courtyard

A building permit is under review for a project by Urban Development Group at 2913 SE Stark St, formerly the location of Starky’s Restaurant and Bar:

Construct new 3 story (46 unit) apartment building with associated site work

 

Seven Corners Community Collaborative goes before Landmarks Commission (images)

Waterleaf Architecture have gone before the Historic Landmarks Commission with initial designs for the Seven Corners Community Collaborative, a four story office building with ground floor retail. The building will serve as the new headquarters for Community Vision, Inc., a non profit that helps people with disabilities to live independently in their homes. According to an article in The Oregonian earlier this year the building will be a showcase for accessible construction, including ensuring that “rooms and corridors… be oriented and painted so people with impaired sight will be able to navigate more easily.”

Seven Corners Community Collaborative

Read More

Weekly Roundup: 12th & Morrison office, Grant High Modernization, the Truman Apartments and more

1139 SW Morrison by Design Department and LRS Architects

1139 SW Morrison by Design Department and LRS Architects

The Portland Business Journal took a first look at the 6 story office building planned by Menashie Properties for a site at 1139 SW Morrison. The building is being designed by Design Department and LRS Architects.

Construction is underway on the PSU School of Business Administration.  The Daily Journal of Commerce published photos of the work underway.

The Oregonian published 5 takeaways from Portland’s plan for next 20 years of growth.

Portland Architecture interviewed the architects and developer behind the development at 3rd and Taylor, which threatens the Ancient Order of United Workmen Temple and the Hotel Albion.

The Oregonian reported on the new 20 story condo tower planned for Block 20 of the Hoyt Street Yards in the Pearl. The building would have 150 residential units and 190 parking spaces.

The James Beard Public Market is set to close on the deal to acquire the land at the west end of the Morrison Bridge, according to The Oregonian. The current schedule envisions the market opening to the public in 2020.

Design work has begun on the Grant High School Modernization, one of the projects funded as part of the $482 million bond passed in 2012. Grant Magazine published the first conceptual drawings of what the rebuilt school will look like.

The Portland Chronicle published images of The Truman apartments at SE 44th and Hawthorne. Construction on the 30 unit building is due to begin in early 2016.

Skylab presents skywalk to Design Commission (images)

Skylab Architecture have presented a proposal to the Design Commission for a skywalk which would link the Yard tower at the Burnside Bridgehead to the proposed Sideyard building. The under construction Yard tower by Key Development and Guardian Real Estate Services will include 276 residential apartment units and 19,709 sq ft of retail/office space. Sideyard by Key Development is currently going through Design Review, and is planned to include 21,151 sq ft of retail and office space.

Yard-Sideyard Skywalk

Read More

Metro Reports: Riverplace Parcel 3, North Hollow apartments, 9101 SE Foster and more

9101 SE Foster

9101 SE Foster by Hacker architecture

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Ankrom Moisan Architects have requested Design Advice for Riverplace Parcel 3:

Design Advice Request for two new proposed residential towers. The project will include 162 market-rate and 204 affordable apartment units. The ground level will include retail space and a grocery store. The residential units will share 173 below-grade parking spaces and a 65-space ground-level parking area will serve the grocery store.

Ankrom Moisan Architects have requested Early Assistance for 120 SE Clay:

Industrial site office development. Basement includes approx 82 parking spaces – accessed via Clay.

TVA Architects have submitted a project at 442 NE Jessup for Design Review:

New apartment

Hacker Architecture have submitted 9101 SE Foster Rd for Design Review:

4-story mixed use development with ground floor commercial and 3 floors of apartments.

Woofter Architecture have submitted the PSU Viking Pavilion for Design Review:

Renovation and modernization of existing Peter Stott Center building

Works Partnership have submitted a project at 1400 NW 22nd for building permit review:

Alterations-exterior alteration improvements w/storefront and accessible entrances. ASCE 41 structural seismic upgrade. Addition of exterior courtyard and roof deck interior improvements. Interior improvements include water closets, lavs and bike storage, enclose trash and utility room.

A building permit was issued to SERA Architects for the North Hollow apartments at 1501 SW Taylor St:

partial – shoring; excavation; underground utilities and concrete structure from mat slab up to and including the 2nd floor concrete podium.

 

Expansion of Jupiter Hotel goes before Design Commission for advice (images)

Works Partnership have brought initial designs for an expansion of the Jupiter Hotel before the Design Commission. The new 6 story building would add 67 rooms on a site directly to the east of the existing hotel. The ground floor would include restaurant and retail spaces facing onto E Burnside, along with a lobby and reception located at the corner of the site. An event space as well as an upper level lounge, connected to the lobby by a stair, is proposed for the second floor. Guest rooms would be located in floors 3-6.

Jupiter Hotel

Read More

Weekly Roundup: 120 SE Clay, Lloyd cinemas, Slabtown marketplace and more

120 SE Clay

120 SE Clay by developer Killian Pacific and architects Ankrom Moisan / Potestio Studio

Developer Killian Pacific announced this week that they are planning a second new office building in the Central Eastside, at 120 SE Clay. The project will be located one block to the west of their under construction Clay Creative project.

Portland Architecture published a Thanksgiving state of the city essay, looking at both the things to be grateful for and the things to be anxious about.

Breakside Brewing will open its third location at the LL Hawkins and Slabtown Marketplacereported the Willamette Week. The brewpub will join New Seasons, Consolidated Community Credit Union and Besaw’s restaurant.

Regal Cinemas have filed a lawsuit over the planned development at 1510 NE Multnomahwhich would replace the surface parking at the Regal Lloyd Center 10 & IMAX. As reported by The Oregonian “lawsuit contends that the parking at the site is ‘a material term’ of Eastgate’s lease and ‘critically necessary’ to the use of the property.”

Design Advice offered for Strata on N Williams (images)

Design-Build firm SolTerra have gone before the Design Commission for advice on their proposed Strata project on N Williams Ave. The mixed use building would include 5 floors of residential units, with 95 one and two bedroom units provided. The ground level would include 5 live/work units, as well as 3-4,000 sq ft of retail. 44 below-grade parking spaces and 144 long-term bike parking spaces would be provided for the use of the residents.

Strata

Read More

Design Commission offers advice for 3rd and Taylor (images)

Ankrom Moisan Architects have gone before the Design Commission with proposals for a nearly full block development at SW 3rd and Taylor. The project for Onder Development would include a 20 story hotel building on the southern half of the block and a 10 story office building on the northern half of the block. The potential loss of two historic buildings on the site has brought significant attention to the project, including a mention by the Historic Landmarks Commission during their State of the City Presevation Report to the City Council last week.

3rd and Taylor

Read More

Metro Reports: Union at St Johns, Ballou & Wright Building, 4335 SE Belmont and more

Union at St Johns

The Union at St Johns by Jones Architecture

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Works Partnership have requested Design Advice and scheduled a Pre-Application Conference for a project at 1732 NE 2nd Ave:

DAR for proposed buildng. See PC 15-265471

PC for proposed new building. See DAR 15-265477

Works Partnership have requested Early Assistance for a project at 1825 NW 23rd Ave:

DZ EA for proposed building not meeting CDS

Early Assistance has been requested for a project at 4450 SE 92nd Ave:

P&Z EA for proposed commercial development

Otak Architects have requested Early Assistance for a project at 4335 SE Belmont St:

New 4-story apt building with 65 dwelling units

Early Assistance has been requested for a project at 2034 NW 27th Ave:

Proposed performance venue to accommodate 2,800 to 3,000 people

Mackenzie have scheduled a Pre-Application to discuss the Ballou & Wright Building at 1010 NW Flanders St

Pre-app conference for reconfiguring freight elevator on NW Flanders frontage with ROW encroachment; remodel of existing office space with option to add approx. 6,000 sf penthouse on the roof.

606 NE 20th Ave has been submitted for Design Review:

New 6-story, 54 unit residential building with ground floor retail and 18 parking spaces. 2 modifications: parking space width and bicycle stall width.

SERA Architects have submitted the Worldmark by Wyndham for Historic Resource Review:

Historic resource review with adjustment to reduce the number of loading bays from 2 to 1 and a modification to change loading bay size from type A to type B. Project is for new construction of 74 room vacation ownership property, six floors on existing parking lot.

Building permits are under review for Con-way Blocks 294E and 295E by GBD Architects and Jones Architecture:

***14 story mixed use. 238 apartments over 1 story retail over 2 levels subgrade parking.***

STR 1 : 2 level subgrade parking below Blk 294E and Blk 295E ***14 story mixed use. 238 apartments over 1 story retail over 2 levels subgrade parking.***

6 story 5/1mixed use, 160 units over concrete retail, over 2 level below grade parking structure permitted under 15-260408-STR-01-CO

PATH Architecture have submitted Carbon12 for building permit review:

New construction of eight story mixed use building; 14 residential units with below ground parking; two ground floor retail units; rooftop deck for the top two condo units only; see comments re: review by State of Oregon Building Codes Division; see comments re: review by State of Oregon Building Codes Division

Jones Architecture have submitted The Union at St Johns at 8247 N Lombard St for building permit review:

New construction of four story type VA 146,613gsf, LU 15-213895-mixed use building with 36,187 sf underground parking, ground floor retail/creative space, and 3 floors of R-2 apartments. The ground story structure is PT. Slab. The 2nd story floor structure is a PT slab. The 2nd-4th floors are wood framed below grade parking

A building permit was issued for a project at 424 NE Stafford:

New construction of 10 unit apartment building with 110sf trash enclosure

A building permit was issued to SERA Architects for the NW Portland International Hostel and Guest House:

Construct new 5 story hostel building with 21 sleeping units, basement level includes storage, mechanical room, laundry room, restroom and housekeeping area; main floor includes lobby area and cafe with seating; levels 2-4 includes hostel units and restrooms, 5th floor is private residence; includes all site work

A building permit was issued to Brett Schulz Architect for a project at 10721 NE Sandy Blvd:

Insulated shell only; construct new 1 story building with associate site work. No occupancy this permit