Oregon Square, part IV: Block 90 (images)

This post is the second in a series on Oregon Square, focusing on Block 91. See also Part I about the urban design and landscaping, Part II about Block 91, Part III about Block 102 and Part V about Block 103.

Rising to a height of 244′-8″, Block 90 will be the second tallest of the four buildings planned for American Assets Trust’s Oregon Square development. The 21 story tower will include 274 residential units and over 14,000 sq ft of ground floor retail. A rooftop terrace will be located on top of the podium form at the 6th floor. The entire 21st floor will be dedicated to amenity functions, including a community room, spa, fitness center, yoga room, private dining room and an exterior terrace. The architects for the project are GBD Architects, who are working with PLACE for the landscape design.

Oregon Square Block 90

Read More

Works Partnership present 19 story Burnside Bridgehead tower to Design Commission (images)

Works Partnership have gone before the Design Commission with a design for a 19 story tower on Block 75 of the Burnside Bridgehead. The proposed building would include 85 to 90 to residential units above commercial space. Parking is planned at 1:1 ratio in a mechanical parking system with storage at levels 3 and 4.

Block 75 Phase II

Read More

Metro Reports: 3rd & Salmon, Pearl Block 20, Seven Corners Community Collaborative and more

3rd & Taylor

The proposed hotel at SW 3rd & Taylor

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Boora Architects have requested Design Advice for Pearl Block 20:

Block 20 is a proposed hi-rise condominium building. One-hundred forty-two units are included in a five floor podium and 20 floor tower.No retail is proposed for this project. All parking is above grade and surrounded by units.

Allusa Architecture have requested Early Assistance for a project at 6805 SE 52nd Ave:

Build two new 3-story apartment buildings with no basement. One structure will be 18 units. The other structure will be 12 units.

Urban Development Group have requested Early Assistance for a project at 4917 SE Hawthorne Blvd:

New 46-unit mixed use apartment building with 2700 sq ft of commercial.

Early Assistance has been requested for a project at 700 SE Belmont St:

New self-storage facility. Existing structure(s) to be demo’d/removed.

Works Partnership have requested Early Assistance for a project at 224 SE 2nd Ave:

Proposed change of existing warehouse to office use with retail on ground floor. Also a proposed addition to the building of one story penthouse for residential occupancy. See EA 15-216040.

Studio 3 Architecture have submitted a project at 7924 SE Milwaukie Ave for Design Review:

See EA 15-242170 appt and CO 16-100215. New two story four unit apartment structure behind existing single family residence which will remain.

Ankrom Moisan Architects have submitted the hotel portion of the 3rd and Salmon development for Design Review:

Proposal for joint development of boutique hotel with 245 guest rooms and on site fitness center and conference center. Project will include ground floor and rooftop retail space. One modification needed for ground floor window and 1 adjustment needed for number of loading spaces.

Waterleaf Architecture have submitted the Seven Corners Community Collaborative for Historic Resource Review:

Proposed project is a four story commercial building consisting of one story of ground floor retail space and secured parking below three stories of office space.

Mentrum Architecture have submitted a project at 6205 N Minnesota Ave for building permit review:

Construct new 3 story (18 unit) apartment building with partial basement; attached trash enclosure and associated site work

A building permit was issued to Fosler Portland Architecture for a project at 7247 N Leavitt Ave:

New three story, 20 unit apartment complex; on site bike parking and trash enclosure; no onsite parking

A building permit was issued to HC Architecture for The Porter Hotel:

new 16-story, 299 guestroom hotel includes first floor full service restaurant, market cafe; second floor 5,000 sf meeting room with outdoor terrace; rooftop restaurant and covered terrace. One level below grade with shoring includes gym facilities, locker rooms, pool and back of house activities.

 

Weekly Roundup: Albina Yard, Slate, Doernbecher Children’s Hospital and more

4703 N Albina

Construction is underway on the Albina Yard office building, which is using Cross-laminated Timber

Venerable restaurant Besaw’s reopened last week at the LL Hawkins apartment building in Slabtown. Eater PDX published photos of the new interior.

History Treasured & Sometimes Endangered wrote about the demolition of a number of houses in order to make way for a mixed use development at 2301 NW Savier. The new building by GBD Architects will wrap around the building that was formerly home to Besaw’s restaurant.

BikePortland reported that a “gear sphere” sculpture was set to be installed outside the under construction Cook Street Apartments by LRS Architects.

OHSU is in the early stages of planning for a major expansion of the Doernbecher Children’s Hospital, according to a story in the Portland Business Journal.

The Portland Chronicle wrote about the potential demolition of a building at 3336 SE Belmont St, slated to be replaced by a three-story mixed use building by BKL/A Architecture.

Construction is about to begin on the Works Partnership designed PDX Commons senior co-housing at SE 43rd and Belmont. The site was formerly the location of the Good Food Here food cart pod. As The Oregonian reports more than half of the carts have now relocated across the street to form the Bite on Belmont pod.

As the Pine Street Market gets ready to open The Oregonian published their ultimate guide to the vendors planned for the Old Town food hall.

Portland Architecture published their notes from the Centennial Mills public forum, which explored how the historic building complex might still be saved.

The developers behind 3rd and Taylor have laid out their plans for the block, wrote the Portland Business Journal. The design review package for the hotel portion of the project has been submitted by Ankrom Moisan Architects. The office building is planned to move forward separately in the coming months.

In [mis]representation Places over Time wrote about the tools architects use to visualize their designs, how these can shape the design itself, and how it is easy to present a false sense of reality.

Coworking firm CENTRL Office will expand into the Slate building at the Burnside Bridgehead Block 75, according to a story in the Portland Business Journal. The 10 story building by Works Partnership is scheduled to open later this year.

Construction is underway at the Lever Architecture designed Albina YardThe 4 story office building is the first commercial building in the United States to make use of domestically fabricated Cross Laminated Timber as a structural element. A video posted last week shows the progress made so far:

Landmarks Commission approves NW 23rd Ave Restoration Hardware (images)

After three Design Advice hearings and two Design Review hearings, the Historic Landmarks Commission has approved designs for a new Restoration Hardware building on NW 23rd Ave. The building by Ankrom Moisan Architects will be modeled on the store’s ‘Gallery’ concept, where furniture is display in a series of linked rooms as they might be in a house. A grand staircase will rise through the three story building, up to an open air pavilion and roof terrace where outdoor furniture will be displayed. Below-grade parking for 18 vehicles will be provided.

NW 23rd & Glisan Restoration Hardware

Read More

Design Approved for First Tall Cross-laminated Timber Building in America (images)

Designs have been approved for Carbon12, an 8 story building planned for N Williams Avenue. The designers of the project, PATH Architecture, expect that the 85′ tall structure will be the first tall building in the USA built using Cross-laminated Timber (CLT) as its structural system. The building will include 14 residential condominium units, as well as two ground floor retail units. With floorplates much skinnier than is typical in multifamily buildings Carbon12 will include only two residential units per floor. 22 parking spaces will be provided in a below grade mechanized parking system.

Carbon12

Read More

Metro Reports: 1685 SE Umatilla, NW 13th and Glisan, 710 E Burnside and more

17th & Umatilla

1685 SE Umatilla by Myhre Group Architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Mackenzie have requested Design Advice for a project at NW 13th and Glisan:

Design Advice Request for a new 6-story mixed use building.

Polyphon Architecture and Design have requested Design Advice for a project at 710 E Burnside:

Proposed 11-story mixed use building.

Baysinger Partners have requested Early Assistance to discuss the conversion of a building at 8000 NE Tillamook:

Project will remodel the existing building with 33,100 sf grocery user, 51,000 sf office use and 50 residential units. Two new retail pad buildings will be constructed totaling 23,000 sf.

WDC Properties have requested Early Assistance to discuss a project at 233 NW 16th Ave:

Remove existing building. Construct a new multi-story mixed-use building with on site parking. Onsite storm water disposal. Intending to meet the community design standards.

Brett Schulz Architect has requested Early Assistance to discuss a project at 8307 N Ivanhoe St:

Proposed 3 story apartment building with 14 units and retail space. Wants to meet community design standards.

Robert Freeman Architecture have requested Early Assistance to discuss a project at 8150 N Lombard St:

Proposed two story apartment complex with 16 units, no onsite parking. Would like to meet community design standards.

A building permit was issued to Urban Development Group for a project at 1685 SE Umatilla:

New 4 story wood frame apartment building with underground parking ; basement parking to include new bike storage, trash enclosure, dog wash room, and 3 apartment units;

 

Building at NW 19th & Quimby goes before Design Commission (images)

SERA Architects have gone before the Design Commission with plans for a new mixed use building at NW 19th & Quimby. The project by Urban Asset Advisors would include 90 residential units, 2 live/work units at the ground floor and a 1,200 sq ft retail space. Parking for 50 cars would be provided, 34 of them in a mechanized system. Parking for 120 bicycles will be provided, primarily via racks located in the units. A common room and exterior roof terrace for the use of the residents will be provided at the 6th floor.

19th & Quimby

Read More

Weekly Roundup: Centennial Mills, 3rd & Taylor, Veritable Quandary and more

Centennial Mills

A sculpture park adjacent to the renovated Feed and Flour Mills was one of the options being explored for Centennial Mills by Harsch Investment Properties

With the fate of Centennial Mills uncertain, the Pearl District Neighborhood Association held a meeting to discuss the future of the site. Presenters included Jordan Schnitzer of Harsch Investment Properties, who had previously been selected as the developer for the property. The PDC allowed the memorandum of understanding between them and Harsch to expire in November, leaving open the possibility that all the buildings on site will be demolished. More information about the future of the property can be found at www.millmeeting.org.

Residents have started moving into the Union Apartments by GBD Architects, according to a story in The Oregonian.

Two historic buildings set to be demolished to make way for the 3rd and Taylor development have gained a temporary reprieve, according to the Portland Business Journal. The developers have agreed not to demolish the Ancient Order of United Workmen Temple or the Hotel Albion until at least April 30. The developers made the agreement with advocacy group Restore Oregon, who in return withdrew their appeal to the Land Use Board of Appeals. A blog post at the Restore Oregon site states that “while the development team continues to assert that saving the buildings is not financially feasible, they have been engaging with Restore Oregon and others about options that could retain the Workmen Temple.”

A topping out ceremony was held for the 21-story Yard building, with 30 people in attendance including Congressman Earl Blumenauer. The Skylab designed project has been gaining a lot of attention lately due to the changes made between the design review process and the issuance of the project’s building permit. The Daily Journal of Commerce reported that the situation could lead to changes to the City’s design review process in response.

The Oregonian reported that the restaurant Veritable Quandary will close this summer in order to make way for the new Multnomah County CourthouseThe County will demolish the restaurant building. The adjacent Jefferson Station building, which is listed on the National Register of Historic Places, will remain.

The Willamette Week noted that Commissioner Steve Novick has called out environmental activists for  failing to make the case that bigger and more dense housing can reduce car use.

The Portland Chronicle wrote that an apartment project proposed at 2915 SE Division St would likely see the demolition of a 106-year-old home.

 

Metro Reports: Home2 Suites , 1133 SW Market, 4455 SE 52nd and more

1133 SW Market, as presented to the Design Commission in March 2015

1133 SW Market, as presented to the Design Commission in March 2015

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

SERA Architects have requested Design Advice for a project at 205 NW 10th Ave:

Type III Design Review for a proposed new 11-14 story residential building with ground-floor retail and 96 below grade parking spaces.

Allusa Architecture have requested Early Assistance for a project at 1428 SE 19th Ave:

New 3-story apartment building w/basement.

Kōz Development have requested Early Assistance for a project at 1015 NW 16th Ave:

New 6-story,153-unit studio apartment building. Demo of 2 existing structures on site.

bkl/a architecture have requested Early Assistance for a project at 3336 SE Belmont St:

New 3-story mixed use building proposed to replace current building.

UrbanLens Planning have requested Early Assistance for a project at 6125 SE Division St:

New memory care facility building (14,000 sq ft) consisting of 18 private and 5 double units for a total of 28 beds/residents. Building to also include a dining area, courtyard, and support facilities. 42 structured parking spaces with at-grade entry.

YGH Architecture have scheduled a Pre-Application Conference to discuss a project at 1122 SE Ankeny St:

Proposal is for construction of a new six story multi-residential building.

Mackenzie have scheduled a Pre-Application Conference to discuss a project at 2800 NW Front Ave:

Pre-Application Conference to discuss a Type III Conditional Use Review, Type II Nonconforming Situation Review and Greenway Review and possible Type III Greenway Goal Exception Review. The applicant is proposing to construct a new approx. 14,000 square foot headquarters office and make other site improvements on the existing Selzer Pump site. The proposal was discuss in a previous Early Assistance meeting – EA 15-219075. The applicant has submitted questions for staff response.

KMG Designs have scheduled a Pre-Application Conference to discuss a project at 3926 SE 11th Ave:

New approximately 7,780 sq ft fellowship center. New trash enclosure and parking spaces at rear of building. Removal of existing curb driveway on SE 11th St

A Conditional Use Review has been submitted by JRA Architecture & Planning for the Home2 Suites by Hilton @ Portland Airport at 7101 NE 82nd Ave:

Construct a 99 guest room four story suites hotel . Remove existing restaurant and meeting room.

SERA Architects have submitted a project at 1133 SW Market St for Design Review:

Construct 14-story apartment building with 146 market rte units. Mechanical parrking for 21 parking stalls is located on the ground floor.

Rainier Pacific Development have submitted a project at 4455 SE 52nd Ave for building permit review:

New mixed use building, ground floor retail, 64 units, on-site parking, landscaping and utilities

TVA Architects have submitted a project at 1313 SE Lambert St for building permit review:

New 4 story 19 unit apartment building, main floor to include trash room and electrical room; with associated site work